Peter C. De Vries
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Peter C. De Vries has a total of 543 co-authors. Here are the top co-authors by number of shared publications:
- Massimiliano Mattei
DIETI, Università degli Studi di Napoli Federico II, Via Claudio 21, Napoli, 80125, Italy
7 shared publications - Gianmaria De Tommasi
Dipartimento di Ingegneria Elettrica e delle Tecnologie dellInformazione, Universit degli Studi di Napoli Federico II, Napoli, Italy
6 shared publications - Luca Zabeo
ITER Organization Route de Vinon sur Verdon, 13067 St Paul Lez Durance, France
6 shared publications Y. Gribov
ITER Organization, Route de Vinon sur Verdon, 13067 St Paul Lez Durance, France
6 shared publications- Yong-Su Na
Department of Nuclear Engineering, Seoul National University 1 , Seoul 08826
6 shared publications Yuri Gribov
ITER Organization Route de Vinon sur Verdon, 13067 St Paul Lez Durance, France
6 shared publications
Latest Publications
- Open Access
- 14 August 2026
- Published by Elsevier in SSRN Electronic Journal
Integration and Evolution of Architectural Components in the ITER Plasma Control System: Deployment and Experimental Validation at KSTAR
The ITER Plasma Control System (PCS) is a large-scale, highly integrated control system designed to autonomously execute all phases of tokamak pulse operation. Given its extended development horizon, strong functional couplings, and stringent reliability requirements, PCS development follows a systematic methodology encompassing systems engineering, model-based design, and staged deployment. Building on an initial case study of the Real-Time Framework (RTF) applied to the ITER PCS, this paper details the improvements and functional extensions introduced in subsequent development stages, demonstrating that the system has achieved the stability and flexibility required for real tokamak operation. Key structural components — including pulse supervision control with integrated exception handling, a lifecycle management scheme enabling seamless operation, and adaptive gain scheduling for plasma controllers — are elaborated in detail. The PCS Provisioning System (PPS), which orchestrates end-to-end PCS operation spanning configuration preparation, pulse execution, and post-pulse analysis, is presented as the central automation layer. The paper further presents the deployment of the ITER PCS architecture on the operating tokamak KSTAR as a practical validation case, describing the methodology for adapting the ITER-specific core architecture to an external device and reporting the resulting control performance.
- 14 August 2026
- Published by Elsevier in SSRN Electronic Journal
Open AccessIntegration and Evolution of Architectural Components in the ITER Plasma Control System: Deployment and Experimental Validation at KSTAR
The ITER Plasma Control System (PCS) is a large-scale, highly integrated control system designed to autonomously execute all phases of tokamak pulse operation. Given its extended development horizon, strong functional couplings, and stringent reliability requirements, PCS development follows a systematic methodology encompassing systems engineering, model-based design, and staged deployment. Building on an initial case study of the Real-Time Framework (RTF) applied to the ITER PCS, this paper details the improvements and functional extensions introduced in subsequent development stages, demonstrating that the system has achieved the stability and flexibility required for real tokamak operation. Key structural components — including pulse supervision control with integrated exception handling, a lifecycle management scheme enabling seamless operation, and adaptive gain scheduling for plasma controllers — are elaborated in detail. The PCS Provisioning System (PPS), which orchestrates end-to-end PCS operation spanning configuration preparation, pulse execution, and post-pulse analysis, is presented as the central automation layer. The paper further presents the deployment of the ITER PCS architecture on the operating tokamak KSTAR as a practical validation case, describing the methodology for adapting the ITER-specific core architecture to an external device and reporting the resulting control performance.
- Open Access
- 7 August 2026
- Published by IOP Publishing in Nuclear Fusion
- Vol. 66 (9) , 095001
Investigating long-duration plasma operation with the international multi-machine CICLOP database
Combined high-fusion performance and long-pulse operation is one of the key integration challenges for fusion energy development in magnetic devices. Addressing these challenges requires an integrated vision of physics and engineering aspects with the purpose of simultaneously increasing time duration and fusion performance. Since the previous 2023 IAEA Fusion Energy Conference (FEC), significant progresses have been made in tokamaks and stellarators including very recent achievement in duration and/or performance. These progresses are reviewed by analysing the experimental data provided by 10 tokamaks and two stellarators. The published database (Litaudon et al 2024 Nucl. Fusion 64 015001), which initially included data up to January 2022, has been significantly updated for the 2025 IAEA FEC to incorporate the latest 2023–2025 experiments (up to May 2025) including recent records performance with new entries provided by DIII-D, EAST, JET, KSTAR, WEST, and W7-X. The update dataset has been gathered and coordination have been provided by the IEA-IAEA international CICLOP group (Coordination on International Challenges on Long duration OPeration). An overview of the recent progress toward long pulse operation analysing the CICLOP database is provided in this publication.
- 7 August 2026
- Published by IOP Publishing in Nuclear Fusion
- Vol. 66 (9) , 095001
Open AccessInvestigating long-duration plasma operation with the international multi-machine CICLOP database
Combined high-fusion performance and long-pulse operation is one of the key integration challenges for fusion energy development in magnetic devices. Addressing these challenges requires an integrated vision of physics and engineering aspects with the purpose of simultaneously increasing time duration and fusion performance. Since the previous 2023 IAEA Fusion Energy Conference (FEC), significant progresses have been made in tokamaks and stellarators including very recent achievement in duration and/or performance. These progresses are reviewed by analysing the experimental data provided by 10 tokamaks and two stellarators. The published database (Litaudon et al 2024 Nucl. Fusion 64 015001), which initially included data up to January 2022, has been significantly updated for the 2025 IAEA FEC to incorporate the latest 2023–2025 experiments (up to May 2025) including recent records performance with new entries provided by DIII-D, EAST, JET, KSTAR, WEST, and W7-X. The update dataset has been gathered and coordination have been provided by the IEA-IAEA international CICLOP group (Coordination on International Challenges on Long duration OPeration). An overview of the recent progress toward long pulse operation analysing the CICLOP database is provided in this publication.
- 15 April 2026
- Published by IOP Publishing in Plasma Physics and Controlled Fusion
- Vol. 68 (4)
Developing disruption avoidance functions for the ITER plasma control system
Disruption avoidance is a key facet of the overall task to manage tokamak disruptions. This paper defines the disruption avoidance function as being a component of the ITER Plasma Control System (PCS) exception handling. Defining this component of the ITER PCS is essential since its functions require dedicated attention for both design and deployment. This paper aims to bridge the gap between research and development of conceptual functionality and obtaining real-time codes for the ITER PCS that can be confidently deployed during Start of Research Operation (SRO) -the first campaign to be executed on ITER. The paper provides a first breakdown and design status of specific ITER PCS disruption avoidance functions. The current functional breakdown is compared with various research efforts and functions tested on present tokamaks. This allows the identification of open issues and complications. Possible research studies are identified which will be able to strengthen the preparation of the ITER disruption avoidance functions prior to the start first operation.
- 15 April 2026
- Published by IOP Publishing in Plasma Physics and Controlled Fusion
- Vol. 68 (4)
Developing disruption avoidance functions for the ITER plasma control system
Disruption avoidance is a key facet of the overall task to manage tokamak disruptions. This paper defines the disruption avoidance function as being a component of the ITER Plasma Control System (PCS) exception handling. Defining this component of the ITER PCS is essential since its functions require dedicated attention for both design and deployment. This paper aims to bridge the gap between research and development of conceptual functionality and obtaining real-time codes for the ITER PCS that can be confidently deployed during Start of Research Operation (SRO) -the first campaign to be executed on ITER. The paper provides a first breakdown and design status of specific ITER PCS disruption avoidance functions. The current functional breakdown is compared with various research efforts and functions tested on present tokamaks. This allows the identification of open issues and complications. Possible research studies are identified which will be able to strengthen the preparation of the ITER disruption avoidance functions prior to the start first operation.
- Open Access
- 23 March 2026
- Published by Elsevier in SSRN Electronic Journal
System Architecture for Actuator Management in ITER PCS
ITER, the largest tokamak currently under construction, will rely on a sophisticated control system to coordinate multipleplasma control tasks using tens of actuators. During the SRO phase, where ITER reaches full plasma current of 15 MAand full field and H-mode at half field and half of nominal current, there will be 40 MW of ECRH power at 9 differentmirrors, 10 MW of ICRH power on 1 antenna, 4 pellet injectors, and 60 gas valves. A key element of this system isactuator management (AM), which orchestrates actuator usage to avoid conflicts, enhance performance, and increaserobustness. Central to AM are virtual actuators, which are presented to the controllers as single entities combiningactuators with comparable effects on the plasma. Up to now, the mapping between actuators and virtual actuators hasbeen static, but future operation requires extending this concept to dynamic mappings. In addition, AM must be capableof adjusting pellet injection properties, both by varying pellet size and by modifying injector–flight tube connections.To meet these requirements, the AM architecture has been extended accordingly. This paper discusses these extensions,presents illustrative examples of their application, and provides an outlook on future developments.
- 23 March 2026
- Published by Elsevier in SSRN Electronic Journal
Open AccessSystem Architecture for Actuator Management in ITER PCS
ITER, the largest tokamak currently under construction, will rely on a sophisticated control system to coordinate multipleplasma control tasks using tens of actuators. During the SRO phase, where ITER reaches full plasma current of 15 MAand full field and H-mode at half field and half of nominal current, there will be 40 MW of ECRH power at 9 differentmirrors, 10 MW of ICRH power on 1 antenna, 4 pellet injectors, and 60 gas valves. A key element of this system isactuator management (AM), which orchestrates actuator usage to avoid conflicts, enhance performance, and increaserobustness. Central to AM are virtual actuators, which are presented to the controllers as single entities combiningactuators with comparable effects on the plasma. Up to now, the mapping between actuators and virtual actuators hasbeen static, but future operation requires extending this concept to dynamic mappings. In addition, AM must be capableof adjusting pellet injection properties, both by varying pellet size and by modifying injector–flight tube connections.To meet these requirements, the AM architecture has been extended accordingly. This paper discusses these extensions,presents illustrative examples of their application, and provides an outlook on future developments.
- Open Access
- 10 March 2026
- Published by IOP Publishing in Nuclear Fusion
- Vol. 66 (5)
Experimental study of ECH pre-ionization on J-TEXT
An experimental study on electron cyclotron heating (ECH) pre-ionization has been conducted on J-TEXT in support of the joint experiment research for ITER plasma initiation. In this experiment, ECH power was injected to the vessel before the application of loop voltage ionize the neutral gas and form the initial plasma or so-called pre-plasma. The impact of several significant factors, such as magnetic field configuration, pre-fill gas pressure, ECH toroidal injection angle and ECH power on the evolution of pre-plasma are systematically studied, aiming to identify shared features, clarify their potential relationship and optimize the discharge parameters to generate a rather high pre-plasma density. By separating ECH power from the inductive start-up, the effect of pre-plasma on tokamak start-up can be observed. A dynamic magnetic configuration facilitates the transition of pre-plasma to tokamak plasma. To assess the influence of pre-plasma density on tokamak start-up, two kinds of magnetic field configurations are examined. While the effect of different pre-plasma densities on tokamak start-up is negligible, a significant difference is observed between pure ohmic start-up and start-up with pre-ionization. The studies presented here show evolutionary trends and threshold values needed to optimize ECH pre-ionization and also a feasible way to improve pre-plasma density and a configuration to stabilize pre-plasma for transition. Eventually, these results may contribute to multi-machine research and physics analysis that can assist ITER with its optimal preparation for first plasma operation.
- 10 March 2026
- Published by IOP Publishing in Nuclear Fusion
- Vol. 66 (5)
Open AccessExperimental study of ECH pre-ionization on J-TEXT
An experimental study on electron cyclotron heating (ECH) pre-ionization has been conducted on J-TEXT in support of the joint experiment research for ITER plasma initiation. In this experiment, ECH power was injected to the vessel before the application of loop voltage ionize the neutral gas and form the initial plasma or so-called pre-plasma. The impact of several significant factors, such as magnetic field configuration, pre-fill gas pressure, ECH toroidal injection angle and ECH power on the evolution of pre-plasma are systematically studied, aiming to identify shared features, clarify their potential relationship and optimize the discharge parameters to generate a rather high pre-plasma density. By separating ECH power from the inductive start-up, the effect of pre-plasma on tokamak start-up can be observed. A dynamic magnetic configuration facilitates the transition of pre-plasma to tokamak plasma. To assess the influence of pre-plasma density on tokamak start-up, two kinds of magnetic field configurations are examined. While the effect of different pre-plasma densities on tokamak start-up is negligible, a significant difference is observed between pure ohmic start-up and start-up with pre-ionization. The studies presented here show evolutionary trends and threshold values needed to optimize ECH pre-ionization and also a feasible way to improve pre-plasma density and a configuration to stabilize pre-plasma for transition. Eventually, these results may contribute to multi-machine research and physics analysis that can assist ITER with its optimal preparation for first plasma operation.
- Open Access
- 23 February 2026
- Published by IOP Publishing in Nuclear Fusion
- Vol. 66 (3) , 036043
Multi-machine validation of plasma initiation modelling and prospects for future devices: Predicting plasma initiation using only hardware design and control room input data
This paper reports on the generic prediction capability of full electromagnetic plasma initiation modelling with DYON, which was carried out for the first time in fusion research by the joint modelling of the International Tokamak Physics Activity—Integrating Operation Scenario group. The following devices were included in the experiment database: VEST (spherical torus, copper coils, Stainless steel wall, R / a = 0.3 m/0.2 m, V v = 3.7 m 3 ), MAST-U (spherical torus, copper coils, C wall, R / a = 0.7 m/0.5 m, V v = 55 m 3 ), EAST (conventional tokamak, superconducting coils, metallic wall, R / a = 1.85 m/0.5 m, V v = 38 m 3 ), DIII-D (conventional tokamak, copper coils, C wall, R / a = 1.67 m/0.65 m, V v = 35 m 3 ), and KSTAR (conventional tokamak, superconducting coils, C wall, R / a = 1.8 m/0.5 m, V v = 55 m 3 ). Despite the different hardware features of the devices, the required operating spaces of the loop voltage induction and prefill gas pressure for inductive plasma initiation in each device were successfully reproduced by the predictive simulations with DYON using only the individual hardware design and the control room input data for each discharge. This successful validation across multiple machines demonstrates that the full electromagnetic DYON modelling can capture the essential physics of inductive plasma initiation. The simulation settings commonly employed for all modelling and the modifications necessary to account for the discrepancies between individual devices are reported. Predictions for ITER based on the multi-machine validation indicate that a wide range of prefill gas pressures exists for the Townsend breakdown and the plasma burn-through (0.01–1.5 mPa).
- 23 February 2026
- Published by IOP Publishing in Nuclear Fusion
- Vol. 66 (3) , 036043
Open AccessMulti-machine validation of plasma initiation modelling and prospects for future devices: Predicting plasma initiation using only hardware design and control room input data
This paper reports on the generic prediction capability of full electromagnetic plasma initiation modelling with DYON, which was carried out for the first time in fusion research by the joint modelling of the International Tokamak Physics Activity—Integrating Operation Scenario group. The following devices were included in the experiment database: VEST (spherical torus, copper coils, Stainless steel wall, R / a = 0.3 m/0.2 m, V v = 3.7 m 3 ), MAST-U (spherical torus, copper coils, C wall, R / a = 0.7 m/0.5 m, V v = 55 m 3 ), EAST (conventional tokamak, superconducting coils, metallic wall, R / a = 1.85 m/0.5 m, V v = 38 m 3 ), DIII-D (conventional tokamak, copper coils, C wall, R / a = 1.67 m/0.65 m, V v = 35 m 3 ), and KSTAR (conventional tokamak, superconducting coils, C wall, R / a = 1.8 m/0.5 m, V v = 55 m 3 ). Despite the different hardware features of the devices, the required operating spaces of the loop voltage induction and prefill gas pressure for inductive plasma initiation in each device were successfully reproduced by the predictive simulations with DYON using only the individual hardware design and the control room input data for each discharge. This successful validation across multiple machines demonstrates that the full electromagnetic DYON modelling can capture the essential physics of inductive plasma initiation. The simulation settings commonly employed for all modelling and the modifications necessary to account for the discrepancies between individual devices are reported. Predictions for ITER based on the multi-machine validation indicate that a wide range of prefill gas pressures exists for the Townsend breakdown and the plasma burn-through (0.01–1.5 mPa).
- Open Access
- 1 January 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Nuclear Science
- p. 1
Configurable Real-Time Pulse Termination System for Machine-protection at ITER
- 1 January 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Nuclear Science
- p. 1
Open AccessConfigurable Real-Time Pulse Termination System for Machine-protection at ITER
- Open Access
Collision operator for electron runaway in cold weakly-ionized plasmas
In cold weakly-ionized plasmas, Dreicer generation mechanism can be non-diffusive as demonstrated in [Y. Lee et. al. Phys. Rev. Lett. 133 17 175102 (2024)]. By expanding the previous letter, we present the detailed description of a proper collision operator to precisely account for the non-diffusive electron kinetics. The operator appropriately combines the Fokker-Planck operator and Boltzmann operator where free-bound collision cross sections are valid in low energy region. The proposed operator is envisaged to predict runaway electrons generations in cold weakly-ionized plasmas, particularly to design a runaway-free reactor tokamak startup.
Open AccessCollision operator for electron runaway in cold weakly-ionized plasmas
In cold weakly-ionized plasmas, Dreicer generation mechanism can be non-diffusive as demonstrated in [Y. Lee et. al. Phys. Rev. Lett. 133 17 175102 (2024)]. By expanding the previous letter, we present the detailed description of a proper collision operator to precisely account for the non-diffusive electron kinetics. The operator appropriately combines the Fokker-Planck operator and Boltzmann operator where free-bound collision cross sections are valid in low energy region. The proposed operator is envisaged to predict runaway electrons generations in cold weakly-ionized plasmas, particularly to design a runaway-free reactor tokamak startup.
- Open Access
- 12 August 2025
- Published by IOP Publishing in Nuclear Fusion
- Vol. 65 (9) , 093001
Integrated operation scenarios: Chapter 6 of the special issue: on the path to tokamak burning plasma operation
Here we report the progress of the development and optimization of operational scenarios for ITER and beyond, focusing upon baseline, hybrid, and steady-state scenarios since 2007. This includes advancements made by the integrated operation scenarios (IOS) topical group of the international tokamak physical activity as well as contributions from the broader tokamak community. The key area of research involves developing IOSs that encompass tokamak physics, operation, and technology by utilizing integrated modeling and control strategies. This requires leveraging available actuators to simultaneously control plasma position and shape, MHD activities that could lead to disruptions, transport, plasma-wall interaction and power exhaust, fuel cycle, fusion burn, and tritium breeding. The control extends from the plasma initiation phase, through the current ramp-up, flattop, start and end of the fusion burn, and current ramp-down, to the plasma termination phase. A review of the currently developed scenarios and modeling is provided in terms of (i) optimizing plasma initiation in ITER, (ii) preparing for the low activation phase to fully commission all tokamak systems and establish and validate physics and scenario conditions in preparation for deuterim-tritium (DT) operation, (iii) developing and preparing baseline and hybrid scenarios to demonstrate the feasibility of achieving these regimes within device constraints, (iv) exploring steady-state scenarios to meet ITER’s steady-state goals, (v) evaluating and preparing actuators for ITER, (vi) developing integrated control solutions using shared actuators. The most notable achievements include; (i) the development of ITER demonstration discharges by matching various dimensionless parameters, (ii) the development of scenarios in an ITER-like tungsten environment and DT operation, and (iii) the development of scenarios in superconducting tokamaks, enabling long-pulse operations with similar coil constraints to ITER. Along with these significant achievements, outstanding issues and recommendations for further research and development are provided. Importantly, this study goes beyond simply updating the ITER Physics Basis; it carries profound implications for the broader field of burning plasma research, offering valuable insights and guidance for the next generation of fusion experiments and devices.
- 12 August 2025
- Published by IOP Publishing in Nuclear Fusion
- Vol. 65 (9) , 093001
Open AccessIntegrated operation scenarios: Chapter 6 of the special issue: on the path to tokamak burning plasma operation
Here we report the progress of the development and optimization of operational scenarios for ITER and beyond, focusing upon baseline, hybrid, and steady-state scenarios since 2007. This includes advancements made by the integrated operation scenarios (IOS) topical group of the international tokamak physical activity as well as contributions from the broader tokamak community. The key area of research involves developing IOSs that encompass tokamak physics, operation, and technology by utilizing integrated modeling and control strategies. This requires leveraging available actuators to simultaneously control plasma position and shape, MHD activities that could lead to disruptions, transport, plasma-wall interaction and power exhaust, fuel cycle, fusion burn, and tritium breeding. The control extends from the plasma initiation phase, through the current ramp-up, flattop, start and end of the fusion burn, and current ramp-down, to the plasma termination phase. A review of the currently developed scenarios and modeling is provided in terms of (i) optimizing plasma initiation in ITER, (ii) preparing for the low activation phase to fully commission all tokamak systems and establish and validate physics and scenario conditions in preparation for deuterim-tritium (DT) operation, (iii) developing and preparing baseline and hybrid scenarios to demonstrate the feasibility of achieving these regimes within device constraints, (iv) exploring steady-state scenarios to meet ITER’s steady-state goals, (v) evaluating and preparing actuators for ITER, (vi) developing integrated control solutions using shared actuators. The most notable achievements include; (i) the development of ITER demonstration discharges by matching various dimensionless parameters, (ii) the development of scenarios in an ITER-like tungsten environment and DT operation, and (iii) the development of scenarios in superconducting tokamaks, enabling long-pulse operations with similar coil constraints to ITER. Along with these significant achievements, outstanding issues and recommendations for further research and development are provided. Importantly, this study goes beyond simply updating the ITER Physics Basis; it carries profound implications for the broader field of burning plasma research, offering valuable insights and guidance for the next generation of fusion experiments and devices.
- Top Cited PapersOpen Access
- 5 June 2025
- Published by IOP Publishing in Plasma Physics and Controlled Fusion
- Vol. 67 (6) , 065023
The new ITER baseline, research plan and open R&D issues
A new baseline (NB) has been proposed by the ITER Project to ensure a robust achievement of the Projects’ goals, in view of past challenges including delays incurred due to the Covid-19 pandemic, technical challenges in completing first-of-a-kind components and in nuclear licensing. The NB includes modifications to the configuration of the ITER device and its ancillaries (e.g. change from beryllium to tungsten as first wall material, modification of the heating and current drive mix, etc.) as well as additional testing of components (e.g. toroidal field coils) or phased installation (start with inertially cooled first wall before later installation of the final actively water-cooled components) to minimise operational risks. In the NB, the ITER research plan (IRP) will be divided into three main phases: (a) start of research operation, with 40 MW of ECH and 10 MW of ICH, which will focus on the demonstration of 15 MA operation in L-mode, commissioning of all required systems, including disruption mitigation, and the demonstration of H-mode plasma operation in deuterium; (b) DT-1, with 60–67 MW of ECH, 33 MW of neutral beam injection (NBI) and 10–20 MW of ICH, which will demonstrate robust operation in high confinement H-mode plasmas in DT up to Q ⩾ 10 and for burn durations of 300–500 s within an accumulated neutron fluence of ∼1% of the ITER machine’s lifetime total, and; (c) DT-2, with up to 67 MW of ECH, up to 49.5 MW of NBI and up to 20 MW of ICH, with the ITER tokamak and ancillaries in their final configuration to demonstrate routine operation in DT plasmas at high Q and the Q ⩾ 5 long-pulse and steady-state scenarios to the final neutron fluence and to perform R&D on nuclear fusion reactor issues. The logic, physics basis, modelling and experimental evaluations carried out to support the NB and the associated IRP are described. These include the impact of the tungsten wall on plasma scenarios and associated risk mitigation measures, as well as the optimisation of the tokamak components and ancillaries to minimise Project risks. Open R&D issues related to these evaluations and mitigation measures are also described together with experimental, modelling and validation activities required to address them.
- 5 June 2025
- Published by IOP Publishing in Plasma Physics and Controlled Fusion
- Vol. 67 (6) , 065023
Top Cited PapersOpen AccessThe new ITER baseline, research plan and open R&D issues
A new baseline (NB) has been proposed by the ITER Project to ensure a robust achievement of the Projects’ goals, in view of past challenges including delays incurred due to the Covid-19 pandemic, technical challenges in completing first-of-a-kind components and in nuclear licensing. The NB includes modifications to the configuration of the ITER device and its ancillaries (e.g. change from beryllium to tungsten as first wall material, modification of the heating and current drive mix, etc.) as well as additional testing of components (e.g. toroidal field coils) or phased installation (start with inertially cooled first wall before later installation of the final actively water-cooled components) to minimise operational risks. In the NB, the ITER research plan (IRP) will be divided into three main phases: (a) start of research operation, with 40 MW of ECH and 10 MW of ICH, which will focus on the demonstration of 15 MA operation in L-mode, commissioning of all required systems, including disruption mitigation, and the demonstration of H-mode plasma operation in deuterium; (b) DT-1, with 60–67 MW of ECH, 33 MW of neutral beam injection (NBI) and 10–20 MW of ICH, which will demonstrate robust operation in high confinement H-mode plasmas in DT up to Q ⩾ 10 and for burn durations of 300–500 s within an accumulated neutron fluence of ∼1% of the ITER machine’s lifetime total, and; (c) DT-2, with up to 67 MW of ECH, up to 49.5 MW of NBI and up to 20 MW of ICH, with the ITER tokamak and ancillaries in their final configuration to demonstrate routine operation in DT plasmas at high Q and the Q ⩾ 5 long-pulse and steady-state scenarios to the final neutron fluence and to perform R&D on nuclear fusion reactor issues. The logic, physics basis, modelling and experimental evaluations carried out to support the NB and the associated IRP are described. These include the impact of the tungsten wall on plasma scenarios and associated risk mitigation measures, as well as the optimisation of the tokamak components and ancillaries to minimise Project risks. Open R&D issues related to these evaluations and mitigation measures are also described together with experimental, modelling and validation activities required to address them.