Qingan Ma
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Qingan Ma has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
- Qian Xu
School of Electrical Engineering, Southwest Jiaotong University, Chengdu, China
2 shared publications - Wei Liu
School of Electrical Engineering, Southwest Jiaotong University, Chengdu 611756, China
2 shared publications - Ashfaque Ahmed Bhatti
School of Electrical Engineering, Southwest Jiaotong University, Chengdu, China
1 shared publication - Jian Zhang
School of Electrical Engineering, Southwest Jiaotong University, Chengdu, China
1 shared publication Jun Dai
School of Electrical Engineering, Southwest Jiaotong University, Chengdu, China
1 shared publicationMingze Li
School of Electronic Information, Sichuan University of Science and Engineering, Yibin, China
1 shared publication
Latest Publications
- 27 January 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Transportation Electrification
- Vol. 11 (3) , 8031-8042
Optimization of Train Grounding System in Dual Traction Power Supply System
In dual-traction power supply system (DTPSS), an improper value of onboard grounding resistance could result in a larger current distribution, axle end potential, and surge over-voltage (SOV) of the vehicle body (VB) because of the interaction between the AC and DC traction power supply system and the train crossing the neutral sections. Therefore, it is important to carefully select the appropriate value of the resistance and position of the grounding points. This research article proposed the steady-state model of DTPSS to evaluate the current distribution and axle-end potential, and the transient state model of DTPSS to calculate the SOV of the VB of vehicle grounding systems (VGS). To obtain the best optimal solution, the particle swarm optimization (PSO) and the technique for order of preference by similarity to ideal solution (TOPSIS) multi-objective optimization techniques have been implemented. The accuracy and efficiency of the VB current distribution are verified by observing the experimental and simulation results. The proposed VGS optimization technique demonstrates that the VB current distribution has achieved a significant improvement of 24.8% of the total current in the DC section and 21.1% of the total current in the AC section. By observing experimental, simulation, and optimal solutions of transient models in DTPSS, the SOV value was reduce to 33.4% of the total voltage.
- 27 January 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Transportation Electrification
- Vol. 11 (3) , 8031-8042
Optimization of Train Grounding System in Dual Traction Power Supply System
In dual-traction power supply system (DTPSS), an improper value of onboard grounding resistance could result in a larger current distribution, axle end potential, and surge over-voltage (SOV) of the vehicle body (VB) because of the interaction between the AC and DC traction power supply system and the train crossing the neutral sections. Therefore, it is important to carefully select the appropriate value of the resistance and position of the grounding points. This research article proposed the steady-state model of DTPSS to evaluate the current distribution and axle-end potential, and the transient state model of DTPSS to calculate the SOV of the VB of vehicle grounding systems (VGS). To obtain the best optimal solution, the particle swarm optimization (PSO) and the technique for order of preference by similarity to ideal solution (TOPSIS) multi-objective optimization techniques have been implemented. The accuracy and efficiency of the VB current distribution are verified by observing the experimental and simulation results. The proposed VGS optimization technique demonstrates that the VB current distribution has achieved a significant improvement of 24.8% of the total current in the DC section and 21.1% of the total current in the AC section. By observing experimental, simulation, and optimal solutions of transient models in DTPSS, the SOV value was reduce to 33.4% of the total voltage.
- 1 January 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Transportation Electrification
- Vol. 10 (4) , 8575-8584
Canceling Onboard Braking Resistance and Optimal Design of Energy Feedback Systems in Urban Rail
The onboard braking resistance (OBR) is widely installed on urban rail trains. The general trend is to cancel OBR in urban rail, due to the low efficiency of using regenerative braking energy. The design of Energy feedback systems (EFSs) after canceling OBR is important because EFSs need to balance energy-saving effects and network voltage safety. Besides, the pneumatic braking may increase, so the brake shoe life needs to be further studied. In this paper, the electro-pneumatic braking and braking shoe wear models are first built. Then the power supply calculation algorithm considering OBR is proposed, including the train dynamic model, train brake power distribution rule, and power supply calculation algorithm. Next, the EFS optimal design after canceling OBR is discussed. The comprehensive cost includes the cost of changing braking shoes. A case study denotes that up to 20.5 MWh or 18.5% of the traction energy can be saved per day after canceling OBR and setting EFSs at each traction substation. The brake shoe life will be 92~159 days. In CLC/TR 50646, after canceling OBR, EFS should be installed at each TS. The optimal result does not follow the rule but can save at least 7.6% of the total cost compared with the actual project.
- 1 January 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Transportation Electrification
- Vol. 10 (4) , 8575-8584
Canceling Onboard Braking Resistance and Optimal Design of Energy Feedback Systems in Urban Rail
The onboard braking resistance (OBR) is widely installed on urban rail trains. The general trend is to cancel OBR in urban rail, due to the low efficiency of using regenerative braking energy. The design of Energy feedback systems (EFSs) after canceling OBR is important because EFSs need to balance energy-saving effects and network voltage safety. Besides, the pneumatic braking may increase, so the brake shoe life needs to be further studied. In this paper, the electro-pneumatic braking and braking shoe wear models are first built. Then the power supply calculation algorithm considering OBR is proposed, including the train dynamic model, train brake power distribution rule, and power supply calculation algorithm. Next, the EFS optimal design after canceling OBR is discussed. The comprehensive cost includes the cost of changing braking shoes. A case study denotes that up to 20.5 MWh or 18.5% of the traction energy can be saved per day after canceling OBR and setting EFSs at each traction substation. The brake shoe life will be 92~159 days. In CLC/TR 50646, after canceling OBR, EFS should be installed at each TS. The optimal result does not follow the rule but can save at least 7.6% of the total cost compared with the actual project.
- Open Access
- 4 July 2018
- Published by Springer Nature in Journal of Modern Transportation
- Vol. 26 (3) , 163-172
Consistency evaluation of the current distribution of short-circuit tests in AT feeding systems for high-speed railways
- 4 July 2018
- Published by Springer Nature in Journal of Modern Transportation
- Vol. 26 (3) , 163-172
Open AccessConsistency evaluation of the current distribution of short-circuit tests in AT feeding systems for high-speed railways