QMQingan Ma

Qingan Ma

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Qingan Ma has a total of 10 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Optimization of Train Grounding System in Dual Traction Power Supply System

    by Ashfaque Ahmed Bhatti, Wei Liu, Mingze Li, Qingan Ma, Qian Xu, Jun Dai, Xiaodong Zhang

    In dual-traction power supply system (DTPSS), an improper value of onboard grounding resistance could result in a larger current distribution, axle end potential, and surge over-voltage (SOV) of the vehicle body (VB) because of the interaction between the AC and DC traction power supply system and the train crossing the neutral sections. Therefore, it is important to carefully select the appropriate value of the resistance and position of the grounding points. This research article proposed the steady-state model of DTPSS to evaluate the current distribution and axle-end potential, and the transient state model of DTPSS to calculate the SOV of the VB of vehicle grounding systems (VGS). To obtain the best optimal solution, the particle swarm optimization (PSO) and the technique for order of preference by similarity to ideal solution (TOPSIS) multi-objective optimization techniques have been implemented. The accuracy and efficiency of the VB current distribution are verified by observing the experimental and simulation results. The proposed VGS optimization technique demonstrates that the VB current distribution has achieved a significant improvement of 24.8% of the total current in the DC section and 21.1% of the total current in the AC section. By observing experimental, simulation, and optimal solutions of transient models in DTPSS, the SOV value was reduce to 33.4% of the total voltage.


  • Canceling Onboard Braking Resistance and Optimal Design of Energy Feedback Systems in Urban Rail

    by Jian Zhang, Wei Liu, Zhongbei Tian, Qian Xu, Qingan Ma, Ziqiang Pan

    The onboard braking resistance (OBR) is widely installed on urban rail trains. The general trend is to cancel OBR in urban rail, due to the low efficiency of using regenerative braking energy. The design of Energy feedback systems (EFSs) after canceling OBR is important because EFSs need to balance energy-saving effects and network voltage safety. Besides, the pneumatic braking may increase, so the brake shoe life needs to be further studied. In this paper, the electro-pneumatic braking and braking shoe wear models are first built. Then the power supply calculation algorithm considering OBR is proposed, including the train dynamic model, train brake power distribution rule, and power supply calculation algorithm. Next, the EFS optimal design after canceling OBR is discussed. The comprehensive cost includes the cost of changing braking shoes. A case study denotes that up to 20.5 MWh or 18.5% of the traction energy can be saved per day after canceling OBR and setting EFSs at each traction substation. The brake shoe life will be 92~159 days. In CLC/TR 50646, after canceling OBR, EFS should be installed at each TS. The optimal result does not follow the rule but can save at least 7.6% of the total cost compared with the actual project.