Soroush Fatemi-Anaraki
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Soroush Fatemi-Anaraki has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
- Behdin Vahedi-Nouri
University of Tehran
2 shared publications - Dorsa Abdolhamidi
School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
2 shared publications - Reza Tavakkoli-Moghaddam
School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
2 shared publications Mahdi Mokhtarzadeh
School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
1 shared publication- Martin Grunow
TUM School of Management, Munich Data Science Institute, Technical University of Munich, 80333 Munich, Germany
1 shared publication Masoud Rabbani
School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
1 shared publication
Latest Publications
- Open Access
- 24 April 2025
- Published by Taylor & Francis in IISE Transactions
- Vol. 58 (3) , 341-357
Capacity representation in sales and operations planning: Aggregation through projection
- 24 April 2025
- Published by Taylor & Francis in IISE Transactions
- Vol. 58 (3) , 341-357
Open AccessCapacity representation in sales and operations planning: Aggregation through projection
- 8 August 2021
- Published by Taylor & Francis in Journal of Industrial and Production Engineering
- Vol. 39 (2) , 146-157
A hybrid of K-means and genetic algorithm to solve a bi-objective green delivery and pick-up problem
- 8 August 2021
- Published by Taylor & Francis in Journal of Industrial and Production Engineering
- Vol. 39 (2) , 146-157
A hybrid of K-means and genetic algorithm to solve a bi-objective green delivery and pick-up problem
- 18 November 2020
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 59 (24) , 7576-7593
Simultaneous waterway scheduling, berth allocation, and quay crane assignment: A novel matheuristic approach
Maritime shipment plays a pivotal role in goods transportation worldwide. Ships intending to load/unload a cargo should visit a port. Three main steps are taken during this process. Firstly, ships go through a waterway to reach the berthing area. Secondly, they are allocated to eligible wharves, and quay cranes are assigned to them. At last, ships leave the port area through the waterway. In this paper, the three mentioned stages are considered and solved in an integrated manner. A two-way waterway is deemed with the width limitation for ships moving in opposite directions. Furthermore, ships may arrive during the planning horizon. Tidal impacts, draft limit, and safety distance between ships are prominent maritime limitations included in this paper. As the three stages take place consecutively, the problem appears to resemble a hybrid flow shop scheduling problem with unrelated parallel machines, machine eligibility constraint, and shared resources. Following this attitude, a mathematical model is developed. Due to the problem complexity, three distinct matheuristic approaches are developed by combining the genetic algorithm, discrete differential evolution, and grey wolf optimiser with a mathematical model and tested using randomly-generated numerical instances. At last, developed matheuristics are compared, and some managerial insights are provided.
- 18 November 2020
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 59 (24) , 7576-7593
Simultaneous waterway scheduling, berth allocation, and quay crane assignment: A novel matheuristic approach
Maritime shipment plays a pivotal role in goods transportation worldwide. Ships intending to load/unload a cargo should visit a port. Three main steps are taken during this process. Firstly, ships go through a waterway to reach the berthing area. Secondly, they are allocated to eligible wharves, and quay cranes are assigned to them. At last, ships leave the port area through the waterway. In this paper, the three mentioned stages are considered and solved in an integrated manner. A two-way waterway is deemed with the width limitation for ships moving in opposite directions. Furthermore, ships may arrive during the planning horizon. Tidal impacts, draft limit, and safety distance between ships are prominent maritime limitations included in this paper. As the three stages take place consecutively, the problem appears to resemble a hybrid flow shop scheduling problem with unrelated parallel machines, machine eligibility constraint, and shared resources. Following this attitude, a mathematical model is developed. Due to the problem complexity, three distinct matheuristic approaches are developed by combining the genetic algorithm, discrete differential evolution, and grey wolf optimiser with a mathematical model and tested using randomly-generated numerical instances. At last, developed matheuristics are compared, and some managerial insights are provided.