Dorsa Abdolhamidi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Dorsa Abdolhamidi has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Soroush Fatemi-Anaraki
School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
2 shared publications - Virginie Lurkin
Faculty of Business and Economics University of Lausanne Lausanne Switzerland
2 shared publications - Behdin Vahedi-Nouri
University of Tehran
1 shared publication Mahdi Mokhtarzadeh
School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
1 shared publicationMasoud Rabbani
School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
1 shared publication- Reza Tavakkoli-Moghaddam
School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
1 shared publication
Latest Publications
- Open Access
- 10 December 2025
- Published by Springer Nature in OR Spectrum
A tactical time slot management problem under mixed logit demand
We study the tactical time slot management problem under mixed logit demand for attended home delivery in subscription settings. We propose a static mixed-integer linear programming model that integrates delivery slot assortment, price discount decisions, and routing optimization while capturing customer heterogeneity through the mixed logit model. To overcome the computational challenges posed by simulation-based choice probabilities, we develop a simulation-based Adaptive Large Neighborhood Search method aligned with a Sample Average Approximation reformulation. Computational experiments on large-scale instances demonstrate the effectiveness of our approach in capturing stochastic customer behavior and preference heterogeneity, providing a scalable and flexible method for optimizing time slot management under complex demand structures.
- 10 December 2025
- Published by Springer Nature in OR Spectrum
Open AccessA tactical time slot management problem under mixed logit demand
We study the tactical time slot management problem under mixed logit demand for attended home delivery in subscription settings. We propose a static mixed-integer linear programming model that integrates delivery slot assortment, price discount decisions, and routing optimization while capturing customer heterogeneity through the mixed logit model. To overcome the computational challenges posed by simulation-based choice probabilities, we develop a simulation-based Adaptive Large Neighborhood Search method aligned with a Sample Average Approximation reformulation. Computational experiments on large-scale instances demonstrate the effectiveness of our approach in capturing stochastic customer behavior and preference heterogeneity, providing a scalable and flexible method for optimizing time slot management under complex demand structures.
- 8 August 2021
- Published by Taylor & Francis in Journal of Industrial and Production Engineering
- Vol. 39 (2) , 146-157
A hybrid of K-means and genetic algorithm to solve a bi-objective green delivery and pick-up problem
- 8 August 2021
- Published by Taylor & Francis in Journal of Industrial and Production Engineering
- Vol. 39 (2) , 146-157
A hybrid of K-means and genetic algorithm to solve a bi-objective green delivery and pick-up problem
- 18 November 2020
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 59 (24) , 7576-7593
Simultaneous waterway scheduling, berth allocation, and quay crane assignment: A novel matheuristic approach
Maritime shipment plays a pivotal role in goods transportation worldwide. Ships intending to load/unload a cargo should visit a port. Three main steps are taken during this process. Firstly, ships go through a waterway to reach the berthing area. Secondly, they are allocated to eligible wharves, and quay cranes are assigned to them. At last, ships leave the port area through the waterway. In this paper, the three mentioned stages are considered and solved in an integrated manner. A two-way waterway is deemed with the width limitation for ships moving in opposite directions. Furthermore, ships may arrive during the planning horizon. Tidal impacts, draft limit, and safety distance between ships are prominent maritime limitations included in this paper. As the three stages take place consecutively, the problem appears to resemble a hybrid flow shop scheduling problem with unrelated parallel machines, machine eligibility constraint, and shared resources. Following this attitude, a mathematical model is developed. Due to the problem complexity, three distinct matheuristic approaches are developed by combining the genetic algorithm, discrete differential evolution, and grey wolf optimiser with a mathematical model and tested using randomly-generated numerical instances. At last, developed matheuristics are compared, and some managerial insights are provided.
- 18 November 2020
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 59 (24) , 7576-7593
Simultaneous waterway scheduling, berth allocation, and quay crane assignment: A novel matheuristic approach
Maritime shipment plays a pivotal role in goods transportation worldwide. Ships intending to load/unload a cargo should visit a port. Three main steps are taken during this process. Firstly, ships go through a waterway to reach the berthing area. Secondly, they are allocated to eligible wharves, and quay cranes are assigned to them. At last, ships leave the port area through the waterway. In this paper, the three mentioned stages are considered and solved in an integrated manner. A two-way waterway is deemed with the width limitation for ships moving in opposite directions. Furthermore, ships may arrive during the planning horizon. Tidal impacts, draft limit, and safety distance between ships are prominent maritime limitations included in this paper. As the three stages take place consecutively, the problem appears to resemble a hybrid flow shop scheduling problem with unrelated parallel machines, machine eligibility constraint, and shared resources. Following this attitude, a mathematical model is developed. Due to the problem complexity, three distinct matheuristic approaches are developed by combining the genetic algorithm, discrete differential evolution, and grey wolf optimiser with a mathematical model and tested using randomly-generated numerical instances. At last, developed matheuristics are compared, and some managerial insights are provided.