Marcos Tadeu Barros de Oliveira
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Marcos Tadeu Barros de Oliveira has a total of 9 co-authors. Here are the top co-authors by number of shared publications:
- André Luís Marques Marcato
Graduate Program in Electrical Engineering, Federal University of Juiz de Fora, Juiz de Fora 36036-900, MG, Brazil
3 shared publications - Giovani Santiago Junqueira
Santo Antônio Energia, Porto Velho 78900-000, Brazil
3 shared publications - Elisa Oliveira
Electrical Engineering Department, Federal University of Juiz de Fora, Juiz de Fora 36036-900, Brazil
2 shared publications - Lucas Reis Conceicao
Federal University of Juiz de Fora, Juiz de Fora, Brazil
2 shared publications - Patricia Silva
Departament of Electrical Engineering Federal University of Juiz de Fora Rua José Lourenço Kelmer Juiz de Fora 36036-330 Minas Gerais Brazil
2 shared publications - Carlos Alberto Veiga de Alencar Junior1 shared publication
Latest Publications
- Open Access
Availability Projections of Hydroelectric Power Plants through Monte Carlo Simulation
The present work proposes a Monte Carlo Simulation (MCS) to obtain availability projections for Hydroelectric Power Plants (HPP), based mainly on regulatory aspects involving the Availability Factor (AFA). The main purpose of the simulation is to generate scenarios to obtain statistics for risk analysis and decision-making in relation to the HPP. The proposed methodology consists of two steps, firstly, the optimization of the maintenance schedule of the hydroelectric plant is carried out, in order to allocate the mandatory maintenance in the simulation horizon. Then, for the MCS, scenarios of forced shutdowns of the Generating Units (GU) will be generated, which directly influence the operation and, consequently, the availability of the HPP. The scenarios will be inserted into an operation optimization model, which considers the impact of forced shutdown samples on the MCS. The proposed modeling was applied using real data from the Santo Antônio HPP, which is one of the largest hydroelectric plants in Brazil.
Open AccessAvailability Projections of Hydroelectric Power Plants through Monte Carlo Simulation
The present work proposes a Monte Carlo Simulation (MCS) to obtain availability projections for Hydroelectric Power Plants (HPP), based mainly on regulatory aspects involving the Availability Factor (AFA). The main purpose of the simulation is to generate scenarios to obtain statistics for risk analysis and decision-making in relation to the HPP. The proposed methodology consists of two steps, firstly, the optimization of the maintenance schedule of the hydroelectric plant is carried out, in order to allocate the mandatory maintenance in the simulation horizon. Then, for the MCS, scenarios of forced shutdowns of the Generating Units (GU) will be generated, which directly influence the operation and, consequently, the availability of the HPP. The scenarios will be inserted into an operation optimization model, which considers the impact of forced shutdown samples on the MCS. The proposed modeling was applied using real data from the Santo Antônio HPP, which is one of the largest hydroelectric plants in Brazil.
- 15 November 2021
- Published by Springer Nature in Journal of Control, Automation and Electrical Systems
- Vol. 33 (3) , 1056-1065
Performance Evaluation of Hydro Generating Units Through the AHP Method
- 15 November 2021
- Published by Springer Nature in Journal of Control, Automation and Electrical Systems
- Vol. 33 (3) , 1056-1065
Performance Evaluation of Hydro Generating Units Through the AHP Method
- Open Access
- 16 February 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 9, 29883-29894
Maintenance Schedule Optimization Applied to Large Hydroelectric Plants: Towards a Methodology Encompassing Regulatory Aspects
The maintenance schedule planning of hydro plant generating units is a subject of great interest to several agents in the energy industry. A correct approach for this problem can prevent the degradation of physical assets and minimize the probability of forced shutdowns of their equipment. In addition to these factors, due particularities of the Brazilian system, the operational strategies of its agents are also affected by the maintenance schedule of the generating units. This occurs due to the Availability Factor (AFA), which is directly influenced by the hours of maintenance performed at the plant and, in case of a performance below the stipulated in the concession contracts, it can lead to financial losses or administrative sanctions applied by the regulatory agent. With this motivation in mind, the present work proposes a methodology for Generator Maintenance Scheduling (GMS) of a hydroelectric plant, developing a mathematical model to determine the ideal moment to perform maintenance, considering operational restrictions and regulatory aspects of hydroelectric plants. The optimization methodology proposed for this problem is done through mixed-integer linear programming, where the integer variables consist of the operating state and start date of maintenance of each generating unit. In the end, to validate the proposed modeling, a case study is carried out for a real large plant in the Brazilian system.
- 16 February 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 9, 29883-29894
Open AccessMaintenance Schedule Optimization Applied to Large Hydroelectric Plants: Towards a Methodology Encompassing Regulatory Aspects
The maintenance schedule planning of hydro plant generating units is a subject of great interest to several agents in the energy industry. A correct approach for this problem can prevent the degradation of physical assets and minimize the probability of forced shutdowns of their equipment. In addition to these factors, due particularities of the Brazilian system, the operational strategies of its agents are also affected by the maintenance schedule of the generating units. This occurs due to the Availability Factor (AFA), which is directly influenced by the hours of maintenance performed at the plant and, in case of a performance below the stipulated in the concession contracts, it can lead to financial losses or administrative sanctions applied by the regulatory agent. With this motivation in mind, the present work proposes a methodology for Generator Maintenance Scheduling (GMS) of a hydroelectric plant, developing a mathematical model to determine the ideal moment to perform maintenance, considering operational restrictions and regulatory aspects of hydroelectric plants. The optimization methodology proposed for this problem is done through mixed-integer linear programming, where the integer variables consist of the operating state and start date of maintenance of each generating unit. In the end, to validate the proposed modeling, a case study is carried out for a real large plant in the Brazilian system.