Carlos Alberto Veiga de Alencar Junior
Research Subjects
Research Interests
Carlos Alberto Veiga de Alencar Junior has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- André Luís Marques Marcato
Graduate Program in Electrical Engineering, Federal University of Juiz de Fora, Juiz de Fora 36036-900, MG, Brazil
1 shared publication - Giovani Santiago Junqueira
Santo Antônio Energia, Porto Velho 78900-000, Brazil
1 shared publication - Lucas Reis Conceicao
Federal University of Juiz de Fora, Juiz de Fora, Brazil
1 shared publication Marcos Tadeu Barros de Oliveira
Electrical Engineering, UFJF - Federal University of Juiz de Fora, Brazil
1 shared publication- Marcos Tadeu Barros de Oliveira
Electrical Engineering Department, Federal University of Juiz de Fora, Juiz de Fora 36036-900, Brazil
1 shared publication Patricia de Sousa Oliveira
Industrial Engineering Department, PUC-Rio - Pontifical Catholic University of Rio de Janeiro, Brazil
1 shared publication
Latest Publications
- Open Access
- 16 February 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 9, 29883-29894
Maintenance Schedule Optimization Applied to Large Hydroelectric Plants: Towards a Methodology Encompassing Regulatory Aspects
The maintenance schedule planning of hydro plant generating units is a subject of great interest to several agents in the energy industry. A correct approach for this problem can prevent the degradation of physical assets and minimize the probability of forced shutdowns of their equipment. In addition to these factors, due particularities of the Brazilian system, the operational strategies of its agents are also affected by the maintenance schedule of the generating units. This occurs due to the Availability Factor (AFA), which is directly influenced by the hours of maintenance performed at the plant and, in case of a performance below the stipulated in the concession contracts, it can lead to financial losses or administrative sanctions applied by the regulatory agent. With this motivation in mind, the present work proposes a methodology for Generator Maintenance Scheduling (GMS) of a hydroelectric plant, developing a mathematical model to determine the ideal moment to perform maintenance, considering operational restrictions and regulatory aspects of hydroelectric plants. The optimization methodology proposed for this problem is done through mixed-integer linear programming, where the integer variables consist of the operating state and start date of maintenance of each generating unit. In the end, to validate the proposed modeling, a case study is carried out for a real large plant in the Brazilian system.
- 16 February 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 9, 29883-29894
Open AccessMaintenance Schedule Optimization Applied to Large Hydroelectric Plants: Towards a Methodology Encompassing Regulatory Aspects
The maintenance schedule planning of hydro plant generating units is a subject of great interest to several agents in the energy industry. A correct approach for this problem can prevent the degradation of physical assets and minimize the probability of forced shutdowns of their equipment. In addition to these factors, due particularities of the Brazilian system, the operational strategies of its agents are also affected by the maintenance schedule of the generating units. This occurs due to the Availability Factor (AFA), which is directly influenced by the hours of maintenance performed at the plant and, in case of a performance below the stipulated in the concession contracts, it can lead to financial losses or administrative sanctions applied by the regulatory agent. With this motivation in mind, the present work proposes a methodology for Generator Maintenance Scheduling (GMS) of a hydroelectric plant, developing a mathematical model to determine the ideal moment to perform maintenance, considering operational restrictions and regulatory aspects of hydroelectric plants. The optimization methodology proposed for this problem is done through mixed-integer linear programming, where the integer variables consist of the operating state and start date of maintenance of each generating unit. In the end, to validate the proposed modeling, a case study is carried out for a real large plant in the Brazilian system.