Jaime Soto-Muñoz
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Jaime Soto-Muñoz has a total of 33 co-authors. Here are the top co-authors by number of shared publications:
- Maureen Trebilcock-Kelly
Universidad del Bio-Bio
6 shared publications - Eric Forcael
Universidad San Sebastián
3 shared publications - Paulina Wegertseder-Martinez
Design and Theory of Architecture Department, Universidad del Bío-Bío, Av. Collao 1202, Concepción 4051381, Chile
3 shared publications - Raúl Ramírez-Vielma
Universidad de Concepción
3 shared publications - Rodrigo García Alvarado
Department of Design and Theory of Architecture, Universidad del Bío-Bío, Concepcion 4051381, Chile
3 shared publications - Alexander Opazo-Vega
Departamento de Ingeniería Civil y Ambiental (DICA) Universidad del Bío-Bío (UBB) Campus Concepción UBB 4081112 Concepción Chile
1 shared publication
Latest Publications
- Open Access
- 29 September 2025
- Published by Universidad Politecnica de Cartagena
Desde el modelo BIM a la ejecución automatizada: Integración con impresión 3D en construcción
[ENG] This paper proposes a strategy to adapt the Building Information Modeling (BIM) methodology for 3D printed construction projects, based on experiences developed in Chile. The research addresses graphical, regulatory, and operational challenges, suggesting a reconfiguration of models, processes, and professional roles. Key aspects include geometric interoperability between platforms, hierarchical development, construction segmentation, and the incorporation of hybrid elements such as reinforcements and concrete infill. The study introduces a new organizational structure, incorporating the emerging role of Digital Fabrication Link, and recommends updates to national standards. The proposal aims to consolidate an integrated, scalable approach aligned with international standards, strengthening the graphical thinking in both production processes and professional training, in particular for geometric representation and adaptation of models. [SPA] Este trabajo presenta una estrategia para adaptar la metodología BIM (Building Information Modeling) a proyectos de construcción impresa en 3D, basada en experiencias desarrolladas en Chile. La investigación aborda desafíos gráficos, normativos y operativos, proponiendo una reconfiguración de modelos, procesos y roles profesionales. Se destacan la necesidad de interoperabilidad geométrica entre plataformas, un desarrollo jerárquico del modelo, la segmentación constructiva y la definición de elementos híbridos con refuerzos y rellenos. El estudio propone ajustes de modelación y de la estructura organizacional con la incorporación del rol emergente de Enlace de Fabricación Digital, y plantea recomendaciones para actualizar normativas. La propuesta busca consolidar un enfoque integrado, escalable y alineado con estándares internacionales, fortaleciendo el pensamiento gráfico tanto en los procesos productivos como en la formación profesional, especialmente en la representación y adaptación geométrica de los modelos.
- 29 September 2025
- Published by Universidad Politecnica de Cartagena
Open AccessDesde el modelo BIM a la ejecución automatizada: Integración con impresión 3D en construcción
[ENG] This paper proposes a strategy to adapt the Building Information Modeling (BIM) methodology for 3D printed construction projects, based on experiences developed in Chile. The research addresses graphical, regulatory, and operational challenges, suggesting a reconfiguration of models, processes, and professional roles. Key aspects include geometric interoperability between platforms, hierarchical development, construction segmentation, and the incorporation of hybrid elements such as reinforcements and concrete infill. The study introduces a new organizational structure, incorporating the emerging role of Digital Fabrication Link, and recommends updates to national standards. The proposal aims to consolidate an integrated, scalable approach aligned with international standards, strengthening the graphical thinking in both production processes and professional training, in particular for geometric representation and adaptation of models. [SPA] Este trabajo presenta una estrategia para adaptar la metodología BIM (Building Information Modeling) a proyectos de construcción impresa en 3D, basada en experiencias desarrolladas en Chile. La investigación aborda desafíos gráficos, normativos y operativos, proponiendo una reconfiguración de modelos, procesos y roles profesionales. Se destacan la necesidad de interoperabilidad geométrica entre plataformas, un desarrollo jerárquico del modelo, la segmentación constructiva y la definición de elementos híbridos con refuerzos y rellenos. El estudio propone ajustes de modelación y de la estructura organizacional con la incorporación del rol emergente de Enlace de Fabricación Digital, y plantea recomendaciones para actualizar normativas. La propuesta busca consolidar un enfoque integrado, escalable y alineado con estándares internacionales, fortaleciendo el pensamiento gráfico tanto en los procesos productivos como en la formación profesional, especialmente en la representación y adaptación geométrica de los modelos.
- 30 June 2025
- Published by Taylor & Francis in Architectural Science Review
- Vol. 69 (3) , 330-343
Well-being criteria in office buildings from the occupants’ perspective: an exploratory mixed method approach
- 30 June 2025
- Published by Taylor & Francis in Architectural Science Review
- Vol. 69 (3) , 330-343
Well-being criteria in office buildings from the occupants’ perspective: an exploratory mixed method approach
- Open Access
Evaluation of Fissures and Cracks in Bridges by Applying Digital Image Capture Techniques Using an Unmanned Aerial Vehicle
The evaluation of cracks and fissures in bridge structures is essential to ensure the long-term safety, durability, and functionality of these infrastructures. In this sense, processing grayscale images and adjusting brightness and contrast levels can improve the visibility of cracks and fissures in bridge structures. These techniques, complemented by professional expertise and efficient inspection tools such as Unmanned Aerial Vehicles (UAVs), allow for a comprehensive and accurate structural integrity assessment. This study used the edge detection technique to analyze photographs obtained with a low-cost UAV as a means of image capture. This tool was used to reach hard-to-reach areas where there could be damage, thus making it easier to detect fissures or cracks. To capture the failures, two case studies, a small bridge and a large bridge, were selected, both located in Concepción City in southern Chile. During both inspections, cracks were detected that could affect the structure of the bridges in the future. To analyze these findings, ImageJ software 1.54h was used, which allowed the length and thickness of the cracks to be measured and evaluated. In addition, to validate the procedure proposed, real values manually measured on-site were compared with those delivered by the software analyses, where no statistically significant differences were found. With the method presented in this study, it was possible to quantify the damage, following the bridge maintenance standards established by the Ministry of Public Works of Chile, whose inspection criteria can be applied to other projects worldwide.
Open AccessEvaluation of Fissures and Cracks in Bridges by Applying Digital Image Capture Techniques Using an Unmanned Aerial Vehicle
The evaluation of cracks and fissures in bridge structures is essential to ensure the long-term safety, durability, and functionality of these infrastructures. In this sense, processing grayscale images and adjusting brightness and contrast levels can improve the visibility of cracks and fissures in bridge structures. These techniques, complemented by professional expertise and efficient inspection tools such as Unmanned Aerial Vehicles (UAVs), allow for a comprehensive and accurate structural integrity assessment. This study used the edge detection technique to analyze photographs obtained with a low-cost UAV as a means of image capture. This tool was used to reach hard-to-reach areas where there could be damage, thus making it easier to detect fissures or cracks. To capture the failures, two case studies, a small bridge and a large bridge, were selected, both located in Concepción City in southern Chile. During both inspections, cracks were detected that could affect the structure of the bridges in the future. To analyze these findings, ImageJ software 1.54h was used, which allowed the length and thickness of the cracks to be measured and evaluated. In addition, to validate the procedure proposed, real values manually measured on-site were compared with those delivered by the software analyses, where no statistically significant differences were found. With the method presented in this study, it was possible to quantify the damage, following the bridge maintenance standards established by the Ministry of Public Works of Chile, whose inspection criteria can be applied to other projects worldwide.
- 12 May 2023
- Published by Springer Nature
- p. 87-98
Occupant Satisfaction with Certified Green Office Buildings in Chile
- 12 May 2023
- Published by Springer Nature
- p. 87-98
Occupant Satisfaction with Certified Green Office Buildings in Chile
- Open Access
Profile Characterization of Building Information Modeling Users
Nowadays, BIM (Building Information Modeling) has steadily been introduced into the construction industry as a promising methodology for managing projects. Therefore, it is necessary to study the users of its processes. Worldwide, there are already systems that classify companies according to how they use BIM, although only a few studies have been conducted on how individual users are classified. Hence, the present study sought to develop a model that characterized BIM users based on several parameters. The methodology employed defined variables based on a literature review, which experts subsequently validated. These variables made it possible to develop the measurement instrument: a structured questionnaire applied to construction professionals. The necessary parameters for the user characterization model were extracted using the Partial Least Squares (PLS) method. This model met the structural evaluation and measurement criteria, which confirmed that it was valid and reliable. It was found that three main aspects mainly characterized users: (i) their use and command of the software and the methodology, (ii) the experience and degree of adoption of the technology, and (iii) the individual’s knowledge of process levels and standardization concerning BIM.
Open AccessProfile Characterization of Building Information Modeling Users
Nowadays, BIM (Building Information Modeling) has steadily been introduced into the construction industry as a promising methodology for managing projects. Therefore, it is necessary to study the users of its processes. Worldwide, there are already systems that classify companies according to how they use BIM, although only a few studies have been conducted on how individual users are classified. Hence, the present study sought to develop a model that characterized BIM users based on several parameters. The methodology employed defined variables based on a literature review, which experts subsequently validated. These variables made it possible to develop the measurement instrument: a structured questionnaire applied to construction professionals. The necessary parameters for the user characterization model were extracted using the Partial Least Squares (PLS) method. This model met the structural evaluation and measurement criteria, which confirmed that it was valid and reliable. It was found that three main aspects mainly characterized users: (i) their use and command of the software and the methodology, (ii) the experience and degree of adoption of the technology, and (iii) the individual’s knowledge of process levels and standardization concerning BIM.
- 11 March 2021
- Published by Taylor & Francis in Building Research & Information
- Vol. 50 (1-2) , 152-170
Understanding the perceived productivity of office occupants in relation to workspace thermal environment
This study examines the perceived productivity of office occupants in moderate thermal environments in Chile. Specifically, it analyses environmental parameters and contrasts participants’ self-reported answers to cross-sectional and retrospective questionnaires. To this end, data were collected for one day in winter and one day in summer, in eighteen office buildings in the cities of Concepción and Santiago. The results show that the average operative temperatures are 22.2 °C in winter and 23.5 °C in summer. 80.5% of the occupants declared their productivity to be normal on the cross-sectional survey. However, on the retrospective survey, 82.7% said that their productivity is affected by the thermal environment. To reveal the interrelationships between perceived productivity and the thermal environment, a categorical principal components analysis was carried out. It demonstrated that there is only a relationship between cross-sectional and retrospective productivity in winter. Subsequently, a good-fitting structural equation model was created, which showed that different relationships exist between the variables. These findings could enable organizations and design professionals to better understand occupants’ perceived productivity in relation to thermal conditions in office buildings.
- 11 March 2021
- Published by Taylor & Francis in Building Research & Information
- Vol. 50 (1-2) , 152-170
Understanding the perceived productivity of office occupants in relation to workspace thermal environment
This study examines the perceived productivity of office occupants in moderate thermal environments in Chile. Specifically, it analyses environmental parameters and contrasts participants’ self-reported answers to cross-sectional and retrospective questionnaires. To this end, data were collected for one day in winter and one day in summer, in eighteen office buildings in the cities of Concepción and Santiago. The results show that the average operative temperatures are 22.2 °C in winter and 23.5 °C in summer. 80.5% of the occupants declared their productivity to be normal on the cross-sectional survey. However, on the retrospective survey, 82.7% said that their productivity is affected by the thermal environment. To reveal the interrelationships between perceived productivity and the thermal environment, a categorical principal components analysis was carried out. It demonstrated that there is only a relationship between cross-sectional and retrospective productivity in winter. Subsequently, a good-fitting structural equation model was created, which showed that different relationships exist between the variables. These findings could enable organizations and design professionals to better understand occupants’ perceived productivity in relation to thermal conditions in office buildings.
- Open Access
- 1 November 2019
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 1343 (1) , 012148
Adaptive thermal comfort for resilient office buildings
New challenges for delivering more resilient and less energy-dependent office buildings require a better understanding of thermal comfort in different contexts and opportunities for adaptation. This study aims to determine comfort temperatures in 18 office buildings located in two Chilean cities. The methodology was based on a longitudinal fieldwork during 1 day in winter, spring and summer at each building, collecting data from surveys to the occupants and measurements. The results showed that comfort temperature varied consistently between both contexts and between different seasons, with wider seasonal variation of comfort temperatures in buildings where occupants are allowed to operate windows.
- 1 November 2019
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 1343 (1) , 012148
Open AccessAdaptive thermal comfort for resilient office buildings
New challenges for delivering more resilient and less energy-dependent office buildings require a better understanding of thermal comfort in different contexts and opportunities for adaptation. This study aims to determine comfort temperatures in 18 office buildings located in two Chilean cities. The methodology was based on a longitudinal fieldwork during 1 day in winter, spring and summer at each building, collecting data from surveys to the occupants and measurements. The results showed that comfort temperature varied consistently between both contexts and between different seasons, with wider seasonal variation of comfort temperatures in buildings where occupants are allowed to operate windows.
- Open Access
- 1 November 2017
- Published by Editora Edgard Blucher, Ltda.
- Vol. 3 (12) , 486-491
La implementación de la Metodología Building Information Modeling (BIM) para edificios existentes en Chile
BIM technology is currently being implemented in the construction industry, though it is still underdeveloped in relation to Facility Management (FC) of extant buildings. There is a strong potential for future development due to the visualization and data analysis capabilities of this technology, amongst others (Becerik-Gerber, Jazizadeh, Li, & Calis, 2012). This research investigates how BIM can be implemented in existing buildings currently in operation. Using a public facility at the University of Bio-Bio as a case study, conclusions are drawn with respect the capabilities of BIM in order to optimize maintenance and operation of existing buildings.
- 1 November 2017
- Published by Editora Edgard Blucher, Ltda.
- Vol. 3 (12) , 486-491
Open AccessLa implementación de la Metodología Building Information Modeling (BIM) para edificios existentes en Chile
BIM technology is currently being implemented in the construction industry, though it is still underdeveloped in relation to Facility Management (FC) of extant buildings. There is a strong potential for future development due to the visualization and data analysis capabilities of this technology, amongst others (Becerik-Gerber, Jazizadeh, Li, & Calis, 2012). This research investigates how BIM can be implemented in existing buildings currently in operation. Using a public facility at the University of Bio-Bio as a case study, conclusions are drawn with respect the capabilities of BIM in order to optimize maintenance and operation of existing buildings.