Azat R. Akhmetshin
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Azat R. Akhmetshin has a total of 59 co-authors. Here are the top co-authors by number of shared publications:
Yu. I. Soluyanov
LLC Association "REM
9 shared publications- Alexander Fedotov
Kazan State Power Engineering University
8 shared publications Ю. И. Солуянов
ООО «Ассоциация РЭМ
7 shared publications- D. I. Mendeleev
Kazan State Power Engineering University,Kazan,Russian Federation
4 shared publications - I. R. Dodov
Kazan State Power Engineering University
4 shared publications - V. I. Soluyanov
Association «Roselectromontazh»; JSC «Tatelektromontazh
4 shared publications
Latest Publications
- 19 November 2025
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 27 (5)
Selection of parameters of an electricity storage system used to cover peak loads of residential and public buildings
THE RELEVANCE. Battery energy storage systems reduce peak loads in external power supply systems, which helps reduce operational energy losses and allows for the selection of lower-power transformers during the design stage. Residential and public buildings benefit from reduced electricity bills during peak hours, as well as the ability to connect to electric charging stations installed in adjacent areas. THE PURPOSE. Developing a methodology for selecting the capacity and energy capacity of battery energy storage systems used in urban infrastructure to limit power consumed from the power grid during peak load hours, as well as the subsequent development of proposals for amending SP 256.1325800.2016 "Electrical Installations of Residential and Public Buildings. Design and Installation Rules." METHODS. The study utilized in-kind measurements of daily power profiles for residential and public buildings, specifically apartment buildings with electric stoves ranging from 11 to 25 stories tall, kindergartens and schools, as well as public buildings serving cultural and leisure purposes and shopping centers. A typical daily power profile was generated for apartment buildings. This profile demonstrates the use of the energy balance of the storage device's charge and discharge to calculate the maximum required power and energy capacity. RESULTS. The specifics of connecting an energy storage system to the city's power grid are discussed. It is shown that the storage system achieves its maximum output when charged while drawing constant power from the grid. CONCLUSION. Charging batteries with a stabilized, reduced current, which extends their lifespan, is beneficial for energy storage systems operating in short-term discharge modes. Based on the obtained typical power profile of an apartment building, calculation formulas are proposed for selecting the parameters of energy storage systems installed at facilities with recurring load patterns.
- 19 November 2025
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 27 (5)
Selection of parameters of an electricity storage system used to cover peak loads of residential and public buildings
THE RELEVANCE. Battery energy storage systems reduce peak loads in external power supply systems, which helps reduce operational energy losses and allows for the selection of lower-power transformers during the design stage. Residential and public buildings benefit from reduced electricity bills during peak hours, as well as the ability to connect to electric charging stations installed in adjacent areas. THE PURPOSE. Developing a methodology for selecting the capacity and energy capacity of battery energy storage systems used in urban infrastructure to limit power consumed from the power grid during peak load hours, as well as the subsequent development of proposals for amending SP 256.1325800.2016 "Electrical Installations of Residential and Public Buildings. Design and Installation Rules." METHODS. The study utilized in-kind measurements of daily power profiles for residential and public buildings, specifically apartment buildings with electric stoves ranging from 11 to 25 stories tall, kindergartens and schools, as well as public buildings serving cultural and leisure purposes and shopping centers. A typical daily power profile was generated for apartment buildings. This profile demonstrates the use of the energy balance of the storage device's charge and discharge to calculate the maximum required power and energy capacity. RESULTS. The specifics of connecting an energy storage system to the city's power grid are discussed. It is shown that the storage system achieves its maximum output when charged while drawing constant power from the grid. CONCLUSION. Charging batteries with a stabilized, reduced current, which extends their lifespan, is beneficial for energy storage systems operating in short-term discharge modes. Based on the obtained typical power profile of an apartment building, calculation formulas are proposed for selecting the parameters of energy storage systems installed at facilities with recurring load patterns.
- Open Access
- 28 May 2025
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 27 (2) , 76-89
Summation of electrical loads of residential and public buildings of a residential complex
Relevance. The aim of the research is to improve the regulatory framework governing the procedure for determining the estimated load when summing up residential and public buildings of residential complexes.The purposes. To analyze the graphs of electrical loads of transformer substations supplying a mixed load: apartment buildings, preschool educational institutions and secondary schools at different times of the year, days of the week, times of day, with subsequent development of proposals for updating SP 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules" in terms of the methodology for determining the total load of residential and public buildings of a residential complex.Methods. In achieving the set goal, experimental, mathematical and statistical methods were used.Results. The performed analysis of the load graphs allowed us to determine the time periods of maximum loads of transformer substations feeding a mixed load. The results of the analysis will be used to update the coefficients of simultaneity and noncoincidence of maximums for summing up the mixed load at the transformer substation.Conclusion. The maximum load of transformer substations feeding only apartment buildings falls on the evening hours of weekends in the winter period (the load is lower on weekdays). On the contrary, the maximum loads of transformer substations feeding apartment buildings and preschool educational institutions, as well as apartment buildings and secondary schools, fall on weekdays. The estimated load of such transformer substations should be summed up with the load of apartment buildings on weekdays, taking into account the daily maximum load of educational institutions, for which it is necessary to provide a correction factor.
- 28 May 2025
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 27 (2) , 76-89
Open AccessSummation of electrical loads of residential and public buildings of a residential complex
Relevance. The aim of the research is to improve the regulatory framework governing the procedure for determining the estimated load when summing up residential and public buildings of residential complexes.The purposes. To analyze the graphs of electrical loads of transformer substations supplying a mixed load: apartment buildings, preschool educational institutions and secondary schools at different times of the year, days of the week, times of day, with subsequent development of proposals for updating SP 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules" in terms of the methodology for determining the total load of residential and public buildings of a residential complex.Methods. In achieving the set goal, experimental, mathematical and statistical methods were used.Results. The performed analysis of the load graphs allowed us to determine the time periods of maximum loads of transformer substations feeding a mixed load. The results of the analysis will be used to update the coefficients of simultaneity and noncoincidence of maximums for summing up the mixed load at the transformer substation.Conclusion. The maximum load of transformer substations feeding only apartment buildings falls on the evening hours of weekends in the winter period (the load is lower on weekdays). On the contrary, the maximum loads of transformer substations feeding apartment buildings and preschool educational institutions, as well as apartment buildings and secondary schools, fall on weekdays. The estimated load of such transformer substations should be summed up with the load of apartment buildings on weekdays, taking into account the daily maximum load of educational institutions, for which it is necessary to provide a correction factor.
- Open Access
- 28 December 2024
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 26 (6) , 94-107
Determination of estimated electrical loads of charging infrastructure for electric vehicles integrated into electrical installations of residential and public buildings
RELEVANCE. The research aims to improve the regulatory framework governing the procedure for determining the estimated load of public buildings when integrating charging infrastructure for electric vehicles into the electrical installations of these buildings. THE PURPOSE. Determination of the schedule of electricity consumption, the coefficient of simultaneity and non-coincidence of maximums of the charging infrastructure for electric vehicles, with subsequent development of proposals for updating SP 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules" in terms of the methodology for determining the estimated load of public buildings when integrating charging infrastructure for electric vehicles into the electrical installations of the said buildings. METHODS. In achieving this goal, experimental, mathematical and statistical methods were used. RESULTS. A methodology for determining the coefficients of simultaneity and non-coincidence of maximums of electric vehicle charging stations has been developed, and their numerical values have been obtained depending on the type, power, and combination of simultaneously operating charging station connectors. Proposals have been developed for amending SP 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules" in terms of the methodology for determining the estimated electrical loads of the charging infrastructure for electric vehicles integrated into electrical installations of public buildings. CONCLUSION. The development of a methodology for calculating electrical loads simultaneously with the development of demand factors, simultaneity and the coefficient of mismatch of maximums of charging infrastructure for electric vehicles integrated into public buildings will contribute to the optimization of costs for technological connection to electrical networks.
- 28 December 2024
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 26 (6) , 94-107
Open AccessDetermination of estimated electrical loads of charging infrastructure for electric vehicles integrated into electrical installations of residential and public buildings
RELEVANCE. The research aims to improve the regulatory framework governing the procedure for determining the estimated load of public buildings when integrating charging infrastructure for electric vehicles into the electrical installations of these buildings. THE PURPOSE. Determination of the schedule of electricity consumption, the coefficient of simultaneity and non-coincidence of maximums of the charging infrastructure for electric vehicles, with subsequent development of proposals for updating SP 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules" in terms of the methodology for determining the estimated load of public buildings when integrating charging infrastructure for electric vehicles into the electrical installations of the said buildings. METHODS. In achieving this goal, experimental, mathematical and statistical methods were used. RESULTS. A methodology for determining the coefficients of simultaneity and non-coincidence of maximums of electric vehicle charging stations has been developed, and their numerical values have been obtained depending on the type, power, and combination of simultaneously operating charging station connectors. Proposals have been developed for amending SP 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules" in terms of the methodology for determining the estimated electrical loads of the charging infrastructure for electric vehicles integrated into electrical installations of public buildings. CONCLUSION. The development of a methodology for calculating electrical loads simultaneously with the development of demand factors, simultaneity and the coefficient of mismatch of maximums of charging infrastructure for electric vehicles integrated into public buildings will contribute to the optimization of costs for technological connection to electrical networks.
- Open Access
- 22 September 2024
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 26 (4) , 41-54
Testing the operation of protection devices against parallel arc breakdown and spark gaps in the event of a ground fault
Testing the operation of protection devices against parallel arc breakdown and spark gaps in the event of a ground faultTHE PURPOSE. Develop a laboratory rig for testing parallel arc fault and spark gap protection devices for tripping in the event of a ground fault. Conduct laboratory rig tests with subsequent development of requirements for the use of parallel arc fault and spark gap protection devices for tripping in the event of a ground fault.METHODS. Mathematical and statistical methods of analysis were used to achieve the stated objective. Laboratory tests of parallel arc fault and spark gap protection devices for different network parameters for correct tripping in the event of a ground fault.RESULTS. Laboratory tests of parallel arc fault and spark gap protection devices for correct tripping in the event of a ground fault were conducted with different network parameters. The oscilloscope recorded the shape of the voltage and current curve in the event of a ground fault and the tripping time of the devices. The tested devices demonstrated the ability to recognize and disconnect a ground fault. The tripping time of the devices varies, however, does not exceed the established requirements.CONCLUSION. A laboratory stand has been developed for testing parallel arc breakdown and spark gap protection devices for operation during a ground fault. This stand makes it possible to test devices for adequate operation during a ground fault with subsequent certification. The tests conducted demonstrate the need to develop mandatory requirements for the device to standardize their operating algorithm. Therefore, the use of this protection device can contribute to safer operation of low-voltage electrical networks by preventing emergency situations and reducing the risk of fires. This is an important technical aspect for improving the reliability and safety of power supply.
- 22 September 2024
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 26 (4) , 41-54
Open AccessTesting the operation of protection devices against parallel arc breakdown and spark gaps in the event of a ground fault
Testing the operation of protection devices against parallel arc breakdown and spark gaps in the event of a ground faultTHE PURPOSE. Develop a laboratory rig for testing parallel arc fault and spark gap protection devices for tripping in the event of a ground fault. Conduct laboratory rig tests with subsequent development of requirements for the use of parallel arc fault and spark gap protection devices for tripping in the event of a ground fault.METHODS. Mathematical and statistical methods of analysis were used to achieve the stated objective. Laboratory tests of parallel arc fault and spark gap protection devices for different network parameters for correct tripping in the event of a ground fault.RESULTS. Laboratory tests of parallel arc fault and spark gap protection devices for correct tripping in the event of a ground fault were conducted with different network parameters. The oscilloscope recorded the shape of the voltage and current curve in the event of a ground fault and the tripping time of the devices. The tested devices demonstrated the ability to recognize and disconnect a ground fault. The tripping time of the devices varies, however, does not exceed the established requirements.CONCLUSION. A laboratory stand has been developed for testing parallel arc breakdown and spark gap protection devices for operation during a ground fault. This stand makes it possible to test devices for adequate operation during a ground fault with subsequent certification. The tests conducted demonstrate the need to develop mandatory requirements for the device to standardize their operating algorithm. Therefore, the use of this protection device can contribute to safer operation of low-voltage electrical networks by preventing emergency situations and reducing the risk of fires. This is an important technical aspect for improving the reliability and safety of power supply.
- Open Access
- 12 January 2024
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 25 (6) , 89-100
Development of changes to the construction code of rules in part of updated specific electrical loads
THE PURPOSE. Develop changes to the building code of rules regarding updating the specific calculated electrical loads of multi-apartment residential buildings. Perform a comparative analysis of the power of technological connection of multi-apartment residential buildings, calculated according to regulatory and technical documents and according to those developed on the basis of actual measured data with an assessment of the effect of updating specific design electrical loads.METHODS. To achieve this goal, mathematical and statistical methods of analysis were used.RESULTS. Statistical processing of the specific electrical load of apartments in multi-apartment residential buildings in the Moscow region of a cluster of 11–18 floors for twenty-three months of 2021–2023 was carried out, which made it possible to form statistically significant samples by excluding outliers from them and obtaining their basic descriptive statistics. Based on the results obtained, changes were developed to the regulatory and technical document in terms of updating the specific calculated electrical loads of apartments in multi-apartment residential buildings in the Moscow region of the cluster 11 - 18 floors.CONCLUSION. The introduction of updated values of the specific calculated electrical load will lead to the selection of power transformers with optimal loading, which, on the one hand, will reduce the “locked electrical power”, resulting in reduced electricity losses, and on the other hand, will reduce the cost of technological connection.
- 12 January 2024
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 25 (6) , 89-100
Open AccessDevelopment of changes to the construction code of rules in part of updated specific electrical loads
THE PURPOSE. Develop changes to the building code of rules regarding updating the specific calculated electrical loads of multi-apartment residential buildings. Perform a comparative analysis of the power of technological connection of multi-apartment residential buildings, calculated according to regulatory and technical documents and according to those developed on the basis of actual measured data with an assessment of the effect of updating specific design electrical loads.METHODS. To achieve this goal, mathematical and statistical methods of analysis were used.RESULTS. Statistical processing of the specific electrical load of apartments in multi-apartment residential buildings in the Moscow region of a cluster of 11–18 floors for twenty-three months of 2021–2023 was carried out, which made it possible to form statistically significant samples by excluding outliers from them and obtaining their basic descriptive statistics. Based on the results obtained, changes were developed to the regulatory and technical document in terms of updating the specific calculated electrical loads of apartments in multi-apartment residential buildings in the Moscow region of the cluster 11 - 18 floors.CONCLUSION. The introduction of updated values of the specific calculated electrical load will lead to the selection of power transformers with optimal loading, which, on the one hand, will reduce the “locked electrical power”, resulting in reduced electricity losses, and on the other hand, will reduce the cost of technological connection.
- Open Access
- 8 June 2023
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 25 (2) , 71-83
Operational determination of the point of a short circuit in power lines
RELEVANCE. An urgent task is to improve the reliability and quality of power supply. Very often, failures in operation are caused by damage to overhead and cable lines. Traditionally, a fairly large number of violations occur in the share of electrical distribution networks. For the reliable functioning of power systems and uninterrupted power supply to consumers, it is necessary to identify and eliminate faults in a short time to minimize damage. Thus, a method for efficient, accurate and reliable fault location is needed for both utility companies and consumers. To solve this problem, it is necessary to quickly obtain information about the state of the distribution eclectic network. THE PURPOSE. Reducing the time to search for a fault location in electrical networks, reducing damage from downtime for undersupply of electricity by analyzing existing methods for determining the location of faults on a power transmission line and developing a method for its prompt detection in electrical networks. METHODS. The basis of this method is a preliminary theoretical calculation of short-circuit currents in various sections of a power line. Based on the values obtained as a result of the calculation, the measured values of the short-circuit currents are compared with these values, on the basis of which the location of the line damage is determined. An algorithm for searching the left and right boundaries of the short-circuit current value in an ordered array of statistical data has been developed. RESULTS. A method for quickly determining the location of a short circuit is proposed, which is based on the use of a data array of theoretically calculated short circuit currents. The presented algorithm is able to accurately determine the coordinates of the short circuit in electrical networks. CONCLUSION. The proposed method for determining the location of damage to the power line allows you to increase the efficiency of determining the point of a short circuit and thereby reduce the time to eliminate the accident, and therefore, economic losses from undersupply of electricity.The basis of this method is a preliminary theoretical calculation of short-circuit currents in various sections of a power line. Due to the subsequent comparison of the measured values of short-circuit currents with the values of the calculated values, the location of the damage to the power line is determined. The presented algorithm is designed to accurately determine thecoordinates of the short circuit location, which can significantly reduce the search time and improve the accuracy of determining the fault location in the range from 100 to 150 m, regardless of the length of the power line, which significantly reduces the time to search for damage at the same time as solving the problem of reducing downtime , as well as minimizing damage both for guaranteeing suppliers represented by electric grid companies, and for consumers represented by industrial and agricultural enterprises.
- 8 June 2023
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 25 (2) , 71-83
Open AccessOperational determination of the point of a short circuit in power lines
RELEVANCE. An urgent task is to improve the reliability and quality of power supply. Very often, failures in operation are caused by damage to overhead and cable lines. Traditionally, a fairly large number of violations occur in the share of electrical distribution networks. For the reliable functioning of power systems and uninterrupted power supply to consumers, it is necessary to identify and eliminate faults in a short time to minimize damage. Thus, a method for efficient, accurate and reliable fault location is needed for both utility companies and consumers. To solve this problem, it is necessary to quickly obtain information about the state of the distribution eclectic network. THE PURPOSE. Reducing the time to search for a fault location in electrical networks, reducing damage from downtime for undersupply of electricity by analyzing existing methods for determining the location of faults on a power transmission line and developing a method for its prompt detection in electrical networks. METHODS. The basis of this method is a preliminary theoretical calculation of short-circuit currents in various sections of a power line. Based on the values obtained as a result of the calculation, the measured values of the short-circuit currents are compared with these values, on the basis of which the location of the line damage is determined. An algorithm for searching the left and right boundaries of the short-circuit current value in an ordered array of statistical data has been developed. RESULTS. A method for quickly determining the location of a short circuit is proposed, which is based on the use of a data array of theoretically calculated short circuit currents. The presented algorithm is able to accurately determine the coordinates of the short circuit in electrical networks. CONCLUSION. The proposed method for determining the location of damage to the power line allows you to increase the efficiency of determining the point of a short circuit and thereby reduce the time to eliminate the accident, and therefore, economic losses from undersupply of electricity.The basis of this method is a preliminary theoretical calculation of short-circuit currents in various sections of a power line. Due to the subsequent comparison of the measured values of short-circuit currents with the values of the calculated values, the location of the damage to the power line is determined. The presented algorithm is designed to accurately determine thecoordinates of the short circuit location, which can significantly reduce the search time and improve the accuracy of determining the fault location in the range from 100 to 150 m, regardless of the length of the power line, which significantly reduces the time to search for damage at the same time as solving the problem of reducing downtime , as well as minimizing damage both for guaranteeing suppliers represented by electric grid companies, and for consumers represented by industrial and agricultural enterprises.
- 27 March 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 680-684
Study of Electrical Loads of Individual Residential Buildings with the Subsequent Development of Regulatory Documents
The construction industry development strategy includes a set of measures aimed at the development of individual housing construction. At the end of 2022, the share of commissioning of individual residential buildings in the total volume of housing increased to 56%, most of the private houses are built by citizens on their own, including with the involvement of contractors. In turn, for individual residential buildings located in rural and urban areas, there are no adequate regulatory documents for the design of electrical networks. Therefore, there is a significant difference between the design and calculated load values. A prerequisite for performing an analysis of the electrical load of individual residential buildings was the data provided by JSC "Grid Company", indicating a low load of electrical grid equipment (less than 20%) in cottage settlements of urban and rural agglomerations of the Republic of Tatarstan. The purpose of this work is to reduce the cost of building both a specific individual residential building and the village as a whole, by developing new regulatory documents for the design of power supply networks.
- 27 March 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 680-684
Study of Electrical Loads of Individual Residential Buildings with the Subsequent Development of Regulatory Documents
The construction industry development strategy includes a set of measures aimed at the development of individual housing construction. At the end of 2022, the share of commissioning of individual residential buildings in the total volume of housing increased to 56%, most of the private houses are built by citizens on their own, including with the involvement of contractors. In turn, for individual residential buildings located in rural and urban areas, there are no adequate regulatory documents for the design of electrical networks. Therefore, there is a significant difference between the design and calculated load values. A prerequisite for performing an analysis of the electrical load of individual residential buildings was the data provided by JSC "Grid Company", indicating a low load of electrical grid equipment (less than 20%) in cottage settlements of urban and rural agglomerations of the Republic of Tatarstan. The purpose of this work is to reduce the cost of building both a specific individual residential building and the village as a whole, by developing new regulatory documents for the design of power supply networks.
- 27 March 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 485-489
Development of Regulatory Documents for the Calculation of Electrical Loads of Residential Buildings Using Big Data
The purpose of the work is to update the specific electrical loads of multi-unit residential buildings with a height of up to 10 floors using big data of actual measurements with the subsequent development of changes to the federal regulatory document. The proposed changes in the value of specific electrical loads will help reduce the cost of technological connection in housing construction, as well as reduce the actual unused power at the same time as reducing electricity losses in power transformers. The size of the studied sample of multi-unit residential buildings with a height of up to 10 floors in Moscow was 149 houses. A comparative analysis of the actual specific electrical loads of a residential building with the loads given in the federal set of rules has been carried out. Based on the results of statistical processing of a sample of multi-unit residential buildings with a height of up to 10 floors, the dependence of the maximum specific power on the number of apartments in multi-unit residential buildings was determined with a trend line that clearly illustrates the trends in the studied dependence. Changes to the regulatory document SP 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules" for calculating the electrical loads of multi-unit residential buildings up to 10 floors in Moscow.
- 27 March 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 485-489
Development of Regulatory Documents for the Calculation of Electrical Loads of Residential Buildings Using Big Data
The purpose of the work is to update the specific electrical loads of multi-unit residential buildings with a height of up to 10 floors using big data of actual measurements with the subsequent development of changes to the federal regulatory document. The proposed changes in the value of specific electrical loads will help reduce the cost of technological connection in housing construction, as well as reduce the actual unused power at the same time as reducing electricity losses in power transformers. The size of the studied sample of multi-unit residential buildings with a height of up to 10 floors in Moscow was 149 houses. A comparative analysis of the actual specific electrical loads of a residential building with the loads given in the federal set of rules has been carried out. Based on the results of statistical processing of a sample of multi-unit residential buildings with a height of up to 10 floors, the dependence of the maximum specific power on the number of apartments in multi-unit residential buildings was determined with a trend line that clearly illustrates the trends in the studied dependence. Changes to the regulatory document SP 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules" for calculating the electrical loads of multi-unit residential buildings up to 10 floors in Moscow.
- Open Access
- 22 December 2022
- Published by FSEI HPE Murmansk State Technical University in Vestnik MGTU
- Vol. 25 (4)
Calculation of specific electrical loads of residential buildings based on actual measurements
Updating the development of specific electrical loads of residential buildings of clusters 1 (up to 5 floors) and 2 (6-11 floors) based on actual measurements (with amendments to the Code of Rules 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules") contributes reducing the cost of technological connection in residential construction, as well as reducing the actual unused "locked power" at the same time as reducing electricity losses in power transformers. In the course of the study, an analysis has been made of the actual electrical loads of residential buildings in Moscow for the periods from November 1 to November 30, 2021 and from December 25, 2021 to January 31, 2022. The number of the studied sample for cluster 1 is 91 houses, for cluster 2 - 58 houses. When determining the maximum specific power of a sample set of multi-apartment residential buildings in Moscow in clusters 1 and 2, an average value and a confidence interval have been established, which "covers" the average of the general population with a probability of 95 %; a comparative analysis of the actual specific electrical loads of a residential building with the loads given in the Code of Rules has been carried out. Based on the results of statistical processing of a sample of multi-apartment buildings in clusters 1 and 2, the dependence of the maximum specific power on the number of apartments in a residential building has been determined with a trend line that clearly illustrates the trend in the studied dependence.
- 22 December 2022
- Published by FSEI HPE Murmansk State Technical University in Vestnik MGTU
- Vol. 25 (4)
Open AccessCalculation of specific electrical loads of residential buildings based on actual measurements
Updating the development of specific electrical loads of residential buildings of clusters 1 (up to 5 floors) and 2 (6-11 floors) based on actual measurements (with amendments to the Code of Rules 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules") contributes reducing the cost of technological connection in residential construction, as well as reducing the actual unused "locked power" at the same time as reducing electricity losses in power transformers. In the course of the study, an analysis has been made of the actual electrical loads of residential buildings in Moscow for the periods from November 1 to November 30, 2021 and from December 25, 2021 to January 31, 2022. The number of the studied sample for cluster 1 is 91 houses, for cluster 2 - 58 houses. When determining the maximum specific power of a sample set of multi-apartment residential buildings in Moscow in clusters 1 and 2, an average value and a confidence interval have been established, which "covers" the average of the general population with a probability of 95 %; a comparative analysis of the actual specific electrical loads of a residential building with the loads given in the Code of Rules has been carried out. Based on the results of statistical processing of a sample of multi-apartment buildings in clusters 1 and 2, the dependence of the maximum specific power on the number of apartments in a residential building has been determined with a trend line that clearly illustrates the trend in the studied dependence.
- Open Access
- 17 August 2022
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 24 (4) , 142-153
Сalculation of the correction factor to the normative values of specific electric loads of multiple residential buildings Moscow and Moscow region
THE PURPOSE. Reducing the cost of external electrical networks in the housing construction of multi-apartment residential buildings (MKD) in Moscow and the Moscow Region by substantiating the value of the correction factor to the standard values of specific electrical loads and developing appropriate amendments to SP 256.1325800.2016 “Electrical installations of residential and public buildings. Rules for design and installation. METHODS. The half-hour graphs of electrical loads installed directly at the objects under study were experimentally obtained from intelligent electricity metering devices. To process the measurement results, statistical methods for processing a large amount of data were applied. RESULTS. The article substantiates the relevance of the topic, analyzes the electrical loads of residential buildings in Moscow and the Moscow region, which confirmed the need to develop a correction factor, the value of which characterizes the difference between real and calculated values. Accepted for statistical processing are the results of measurements of electricity consumption in apartments per day with the maximum total electricity consumption of MKD. Based on the calculations performed, amendments were prepared to section 7 of SP 256.1325800.2016 “Electrical installations of residential and public buildings. Design and installation rules”, including clause 7.1.10. is set out in a new edition, and table 7.5a is formed. CONCLUSION. Based on the analysis of the calculated specific electrical loads of apartment buildings in Moscow and the Moscow region, the value of the correction factor for the city of Moscow and the Moscow region in relation to the MKD of standard projects, which amounted to 0.81, was justified, taking into account the margin. The use of a correction factor to determine the design load of a residential building will reduce costs in the construction of external electrical networks of residential buildings with a simultaneous increase in the efficiency of power transformers in Moscow and the Moscow Region.
- 17 August 2022
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 24 (4) , 142-153
Open AccessСalculation of the correction factor to the normative values of specific electric loads of multiple residential buildings Moscow and Moscow region
THE PURPOSE. Reducing the cost of external electrical networks in the housing construction of multi-apartment residential buildings (MKD) in Moscow and the Moscow Region by substantiating the value of the correction factor to the standard values of specific electrical loads and developing appropriate amendments to SP 256.1325800.2016 “Electrical installations of residential and public buildings. Rules for design and installation. METHODS. The half-hour graphs of electrical loads installed directly at the objects under study were experimentally obtained from intelligent electricity metering devices. To process the measurement results, statistical methods for processing a large amount of data were applied. RESULTS. The article substantiates the relevance of the topic, analyzes the electrical loads of residential buildings in Moscow and the Moscow region, which confirmed the need to develop a correction factor, the value of which characterizes the difference between real and calculated values. Accepted for statistical processing are the results of measurements of electricity consumption in apartments per day with the maximum total electricity consumption of MKD. Based on the calculations performed, amendments were prepared to section 7 of SP 256.1325800.2016 “Electrical installations of residential and public buildings. Design and installation rules”, including clause 7.1.10. is set out in a new edition, and table 7.5a is formed. CONCLUSION. Based on the analysis of the calculated specific electrical loads of apartment buildings in Moscow and the Moscow region, the value of the correction factor for the city of Moscow and the Moscow region in relation to the MKD of standard projects, which amounted to 0.81, was justified, taking into account the margin. The use of a correction factor to determine the design load of a residential building will reduce costs in the construction of external electrical networks of residential buildings with a simultaneous increase in the efficiency of power transformers in Moscow and the Moscow Region.