Alexander Fedotov
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Alexander Fedotov has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
- Azat R. Akhmetshin
Kazan State Power Engineering University
8 shared publications Yu. I. Soluyanov
LLC Association "REM
4 shared publications- V. I. Soluyanov
Association «Roselectromontazh»; JSC «Tatelektromontazh
3 shared publications Yuri Soluyanov
Roselectromontazh" Association,Moscow,Russia
3 shared publicationsE. A. Fedotov
Kazan State Power Engineering University
2 shared publications- Евгений Александрович Федотов
Kazan State Power Engineering University
2 shared publications
Latest Publications
- 19 November 2025
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 27 (5)
Selection of parameters of an electricity storage system used to cover peak loads of residential and public buildings
THE RELEVANCE. Battery energy storage systems reduce peak loads in external power supply systems, which helps reduce operational energy losses and allows for the selection of lower-power transformers during the design stage. Residential and public buildings benefit from reduced electricity bills during peak hours, as well as the ability to connect to electric charging stations installed in adjacent areas. THE PURPOSE. Developing a methodology for selecting the capacity and energy capacity of battery energy storage systems used in urban infrastructure to limit power consumed from the power grid during peak load hours, as well as the subsequent development of proposals for amending SP 256.1325800.2016 "Electrical Installations of Residential and Public Buildings. Design and Installation Rules." METHODS. The study utilized in-kind measurements of daily power profiles for residential and public buildings, specifically apartment buildings with electric stoves ranging from 11 to 25 stories tall, kindergartens and schools, as well as public buildings serving cultural and leisure purposes and shopping centers. A typical daily power profile was generated for apartment buildings. This profile demonstrates the use of the energy balance of the storage device's charge and discharge to calculate the maximum required power and energy capacity. RESULTS. The specifics of connecting an energy storage system to the city's power grid are discussed. It is shown that the storage system achieves its maximum output when charged while drawing constant power from the grid. CONCLUSION. Charging batteries with a stabilized, reduced current, which extends their lifespan, is beneficial for energy storage systems operating in short-term discharge modes. Based on the obtained typical power profile of an apartment building, calculation formulas are proposed for selecting the parameters of energy storage systems installed at facilities with recurring load patterns.
- 19 November 2025
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 27 (5)
Selection of parameters of an electricity storage system used to cover peak loads of residential and public buildings
THE RELEVANCE. Battery energy storage systems reduce peak loads in external power supply systems, which helps reduce operational energy losses and allows for the selection of lower-power transformers during the design stage. Residential and public buildings benefit from reduced electricity bills during peak hours, as well as the ability to connect to electric charging stations installed in adjacent areas. THE PURPOSE. Developing a methodology for selecting the capacity and energy capacity of battery energy storage systems used in urban infrastructure to limit power consumed from the power grid during peak load hours, as well as the subsequent development of proposals for amending SP 256.1325800.2016 "Electrical Installations of Residential and Public Buildings. Design and Installation Rules." METHODS. The study utilized in-kind measurements of daily power profiles for residential and public buildings, specifically apartment buildings with electric stoves ranging from 11 to 25 stories tall, kindergartens and schools, as well as public buildings serving cultural and leisure purposes and shopping centers. A typical daily power profile was generated for apartment buildings. This profile demonstrates the use of the energy balance of the storage device's charge and discharge to calculate the maximum required power and energy capacity. RESULTS. The specifics of connecting an energy storage system to the city's power grid are discussed. It is shown that the storage system achieves its maximum output when charged while drawing constant power from the grid. CONCLUSION. Charging batteries with a stabilized, reduced current, which extends their lifespan, is beneficial for energy storage systems operating in short-term discharge modes. Based on the obtained typical power profile of an apartment building, calculation formulas are proposed for selecting the parameters of energy storage systems installed at facilities with recurring load patterns.
- Open Access
- 28 May 2025
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 27 (2) , 76-89
Summation of electrical loads of residential and public buildings of a residential complex
Relevance. The aim of the research is to improve the regulatory framework governing the procedure for determining the estimated load when summing up residential and public buildings of residential complexes.The purposes. To analyze the graphs of electrical loads of transformer substations supplying a mixed load: apartment buildings, preschool educational institutions and secondary schools at different times of the year, days of the week, times of day, with subsequent development of proposals for updating SP 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules" in terms of the methodology for determining the total load of residential and public buildings of a residential complex.Methods. In achieving the set goal, experimental, mathematical and statistical methods were used.Results. The performed analysis of the load graphs allowed us to determine the time periods of maximum loads of transformer substations feeding a mixed load. The results of the analysis will be used to update the coefficients of simultaneity and noncoincidence of maximums for summing up the mixed load at the transformer substation.Conclusion. The maximum load of transformer substations feeding only apartment buildings falls on the evening hours of weekends in the winter period (the load is lower on weekdays). On the contrary, the maximum loads of transformer substations feeding apartment buildings and preschool educational institutions, as well as apartment buildings and secondary schools, fall on weekdays. The estimated load of such transformer substations should be summed up with the load of apartment buildings on weekdays, taking into account the daily maximum load of educational institutions, for which it is necessary to provide a correction factor.
- 28 May 2025
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 27 (2) , 76-89
Open AccessSummation of electrical loads of residential and public buildings of a residential complex
Relevance. The aim of the research is to improve the regulatory framework governing the procedure for determining the estimated load when summing up residential and public buildings of residential complexes.The purposes. To analyze the graphs of electrical loads of transformer substations supplying a mixed load: apartment buildings, preschool educational institutions and secondary schools at different times of the year, days of the week, times of day, with subsequent development of proposals for updating SP 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules" in terms of the methodology for determining the total load of residential and public buildings of a residential complex.Methods. In achieving the set goal, experimental, mathematical and statistical methods were used.Results. The performed analysis of the load graphs allowed us to determine the time periods of maximum loads of transformer substations feeding a mixed load. The results of the analysis will be used to update the coefficients of simultaneity and noncoincidence of maximums for summing up the mixed load at the transformer substation.Conclusion. The maximum load of transformer substations feeding only apartment buildings falls on the evening hours of weekends in the winter period (the load is lower on weekdays). On the contrary, the maximum loads of transformer substations feeding apartment buildings and preschool educational institutions, as well as apartment buildings and secondary schools, fall on weekdays. The estimated load of such transformer substations should be summed up with the load of apartment buildings on weekdays, taking into account the daily maximum load of educational institutions, for which it is necessary to provide a correction factor.
- Open Access
- 28 December 2024
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 26 (6) , 94-107
Determination of estimated electrical loads of charging infrastructure for electric vehicles integrated into electrical installations of residential and public buildings
RELEVANCE. The research aims to improve the regulatory framework governing the procedure for determining the estimated load of public buildings when integrating charging infrastructure for electric vehicles into the electrical installations of these buildings. THE PURPOSE. Determination of the schedule of electricity consumption, the coefficient of simultaneity and non-coincidence of maximums of the charging infrastructure for electric vehicles, with subsequent development of proposals for updating SP 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules" in terms of the methodology for determining the estimated load of public buildings when integrating charging infrastructure for electric vehicles into the electrical installations of the said buildings. METHODS. In achieving this goal, experimental, mathematical and statistical methods were used. RESULTS. A methodology for determining the coefficients of simultaneity and non-coincidence of maximums of electric vehicle charging stations has been developed, and their numerical values have been obtained depending on the type, power, and combination of simultaneously operating charging station connectors. Proposals have been developed for amending SP 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules" in terms of the methodology for determining the estimated electrical loads of the charging infrastructure for electric vehicles integrated into electrical installations of public buildings. CONCLUSION. The development of a methodology for calculating electrical loads simultaneously with the development of demand factors, simultaneity and the coefficient of mismatch of maximums of charging infrastructure for electric vehicles integrated into public buildings will contribute to the optimization of costs for technological connection to electrical networks.
- 28 December 2024
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 26 (6) , 94-107
Open AccessDetermination of estimated electrical loads of charging infrastructure for electric vehicles integrated into electrical installations of residential and public buildings
RELEVANCE. The research aims to improve the regulatory framework governing the procedure for determining the estimated load of public buildings when integrating charging infrastructure for electric vehicles into the electrical installations of these buildings. THE PURPOSE. Determination of the schedule of electricity consumption, the coefficient of simultaneity and non-coincidence of maximums of the charging infrastructure for electric vehicles, with subsequent development of proposals for updating SP 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules" in terms of the methodology for determining the estimated load of public buildings when integrating charging infrastructure for electric vehicles into the electrical installations of the said buildings. METHODS. In achieving this goal, experimental, mathematical and statistical methods were used. RESULTS. A methodology for determining the coefficients of simultaneity and non-coincidence of maximums of electric vehicle charging stations has been developed, and their numerical values have been obtained depending on the type, power, and combination of simultaneously operating charging station connectors. Proposals have been developed for amending SP 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules" in terms of the methodology for determining the estimated electrical loads of the charging infrastructure for electric vehicles integrated into electrical installations of public buildings. CONCLUSION. The development of a methodology for calculating electrical loads simultaneously with the development of demand factors, simultaneity and the coefficient of mismatch of maximums of charging infrastructure for electric vehicles integrated into public buildings will contribute to the optimization of costs for technological connection to electrical networks.
- Open Access
- 12 January 2024
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 25 (6) , 89-100
Development of changes to the construction code of rules in part of updated specific electrical loads
THE PURPOSE. Develop changes to the building code of rules regarding updating the specific calculated electrical loads of multi-apartment residential buildings. Perform a comparative analysis of the power of technological connection of multi-apartment residential buildings, calculated according to regulatory and technical documents and according to those developed on the basis of actual measured data with an assessment of the effect of updating specific design electrical loads.METHODS. To achieve this goal, mathematical and statistical methods of analysis were used.RESULTS. Statistical processing of the specific electrical load of apartments in multi-apartment residential buildings in the Moscow region of a cluster of 11–18 floors for twenty-three months of 2021–2023 was carried out, which made it possible to form statistically significant samples by excluding outliers from them and obtaining their basic descriptive statistics. Based on the results obtained, changes were developed to the regulatory and technical document in terms of updating the specific calculated electrical loads of apartments in multi-apartment residential buildings in the Moscow region of the cluster 11 - 18 floors.CONCLUSION. The introduction of updated values of the specific calculated electrical load will lead to the selection of power transformers with optimal loading, which, on the one hand, will reduce the “locked electrical power”, resulting in reduced electricity losses, and on the other hand, will reduce the cost of technological connection.
- 12 January 2024
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 25 (6) , 89-100
Open AccessDevelopment of changes to the construction code of rules in part of updated specific electrical loads
THE PURPOSE. Develop changes to the building code of rules regarding updating the specific calculated electrical loads of multi-apartment residential buildings. Perform a comparative analysis of the power of technological connection of multi-apartment residential buildings, calculated according to regulatory and technical documents and according to those developed on the basis of actual measured data with an assessment of the effect of updating specific design electrical loads.METHODS. To achieve this goal, mathematical and statistical methods of analysis were used.RESULTS. Statistical processing of the specific electrical load of apartments in multi-apartment residential buildings in the Moscow region of a cluster of 11–18 floors for twenty-three months of 2021–2023 was carried out, which made it possible to form statistically significant samples by excluding outliers from them and obtaining their basic descriptive statistics. Based on the results obtained, changes were developed to the regulatory and technical document in terms of updating the specific calculated electrical loads of apartments in multi-apartment residential buildings in the Moscow region of the cluster 11 - 18 floors.CONCLUSION. The introduction of updated values of the specific calculated electrical load will lead to the selection of power transformers with optimal loading, which, on the one hand, will reduce the “locked electrical power”, resulting in reduced electricity losses, and on the other hand, will reduce the cost of technological connection.
- Open Access
- 22 December 2023
- Published by FSEI HPE Murmansk State Technical University in Vestnik MGTU
- Vol. 26 (4) , 457-471
The single phase-to-ground fault location calculation method based on limited information on the distribution of zero-sequence voltages on the tree-structured feeder
One of the key goals in the overhead power lines at the isolated neutral system 6–10–35 kV is topographic search area limitation for a single phase-to-ground (SPG) fault. This will ensure reliability improvement warranty and continuity of power supply. No fault founded in time can lead to failure of electrical equipment. Faults can initiate a ground fire in dry-weather period, which requires preventive shutdown of power lines with subsequent economic damage to power supply organizations. The paper proposes the use of emergency mode parameters, namely, zero-sequence voltages, in order to determine the faults locations in a calculated way. The need for additional installation of measuring voltage transformers at terminal substations is associated with some financial costs. In this regard, the possibility of their limited use is being considered. It has been shown that in this case the emergency section can be localized with accuracy down to the tap if there are no measuring voltage transformers on it. To calculate the SPG location, a mathematical model of lines with distributed parameters has been used. Signals at higher harmonics (HH) generated in the electrical network by arc faults, are considered useful. Full-scale experiments show the HH presence also during electrical contacts of wires with metal structures. The high frequency of the signal causes a significant change in voltage along the length of the line, which increases the accuracy of calculations. The use of zero sequence voltages promotes detuning from the influence of substation load. An algorithm has been developed for performing calculations to determine the location/area with a ground protection zone on a tree-structure feeder.
- 22 December 2023
- Published by FSEI HPE Murmansk State Technical University in Vestnik MGTU
- Vol. 26 (4) , 457-471
Open AccessThe single phase-to-ground fault location calculation method based on limited information on the distribution of zero-sequence voltages on the tree-structured feeder
One of the key goals in the overhead power lines at the isolated neutral system 6–10–35 kV is topographic search area limitation for a single phase-to-ground (SPG) fault. This will ensure reliability improvement warranty and continuity of power supply. No fault founded in time can lead to failure of electrical equipment. Faults can initiate a ground fire in dry-weather period, which requires preventive shutdown of power lines with subsequent economic damage to power supply organizations. The paper proposes the use of emergency mode parameters, namely, zero-sequence voltages, in order to determine the faults locations in a calculated way. The need for additional installation of measuring voltage transformers at terminal substations is associated with some financial costs. In this regard, the possibility of their limited use is being considered. It has been shown that in this case the emergency section can be localized with accuracy down to the tap if there are no measuring voltage transformers on it. To calculate the SPG location, a mathematical model of lines with distributed parameters has been used. Signals at higher harmonics (HH) generated in the electrical network by arc faults, are considered useful. Full-scale experiments show the HH presence also during electrical contacts of wires with metal structures. The high frequency of the signal causes a significant change in voltage along the length of the line, which increases the accuracy of calculations. The use of zero sequence voltages promotes detuning from the influence of substation load. An algorithm has been developed for performing calculations to determine the location/area with a ground protection zone on a tree-structure feeder.
- 27 March 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 680-684
Study of Electrical Loads of Individual Residential Buildings with the Subsequent Development of Regulatory Documents
The construction industry development strategy includes a set of measures aimed at the development of individual housing construction. At the end of 2022, the share of commissioning of individual residential buildings in the total volume of housing increased to 56%, most of the private houses are built by citizens on their own, including with the involvement of contractors. In turn, for individual residential buildings located in rural and urban areas, there are no adequate regulatory documents for the design of electrical networks. Therefore, there is a significant difference between the design and calculated load values. A prerequisite for performing an analysis of the electrical load of individual residential buildings was the data provided by JSC "Grid Company", indicating a low load of electrical grid equipment (less than 20%) in cottage settlements of urban and rural agglomerations of the Republic of Tatarstan. The purpose of this work is to reduce the cost of building both a specific individual residential building and the village as a whole, by developing new regulatory documents for the design of power supply networks.
- 27 March 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 680-684
Study of Electrical Loads of Individual Residential Buildings with the Subsequent Development of Regulatory Documents
The construction industry development strategy includes a set of measures aimed at the development of individual housing construction. At the end of 2022, the share of commissioning of individual residential buildings in the total volume of housing increased to 56%, most of the private houses are built by citizens on their own, including with the involvement of contractors. In turn, for individual residential buildings located in rural and urban areas, there are no adequate regulatory documents for the design of electrical networks. Therefore, there is a significant difference between the design and calculated load values. A prerequisite for performing an analysis of the electrical load of individual residential buildings was the data provided by JSC "Grid Company", indicating a low load of electrical grid equipment (less than 20%) in cottage settlements of urban and rural agglomerations of the Republic of Tatarstan. The purpose of this work is to reduce the cost of building both a specific individual residential building and the village as a whole, by developing new regulatory documents for the design of power supply networks.
- 27 March 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 485-489
Development of Regulatory Documents for the Calculation of Electrical Loads of Residential Buildings Using Big Data
The purpose of the work is to update the specific electrical loads of multi-unit residential buildings with a height of up to 10 floors using big data of actual measurements with the subsequent development of changes to the federal regulatory document. The proposed changes in the value of specific electrical loads will help reduce the cost of technological connection in housing construction, as well as reduce the actual unused power at the same time as reducing electricity losses in power transformers. The size of the studied sample of multi-unit residential buildings with a height of up to 10 floors in Moscow was 149 houses. A comparative analysis of the actual specific electrical loads of a residential building with the loads given in the federal set of rules has been carried out. Based on the results of statistical processing of a sample of multi-unit residential buildings with a height of up to 10 floors, the dependence of the maximum specific power on the number of apartments in multi-unit residential buildings was determined with a trend line that clearly illustrates the trends in the studied dependence. Changes to the regulatory document SP 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules" for calculating the electrical loads of multi-unit residential buildings up to 10 floors in Moscow.
- 27 March 2023
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 485-489
Development of Regulatory Documents for the Calculation of Electrical Loads of Residential Buildings Using Big Data
The purpose of the work is to update the specific electrical loads of multi-unit residential buildings with a height of up to 10 floors using big data of actual measurements with the subsequent development of changes to the federal regulatory document. The proposed changes in the value of specific electrical loads will help reduce the cost of technological connection in housing construction, as well as reduce the actual unused power at the same time as reducing electricity losses in power transformers. The size of the studied sample of multi-unit residential buildings with a height of up to 10 floors in Moscow was 149 houses. A comparative analysis of the actual specific electrical loads of a residential building with the loads given in the federal set of rules has been carried out. Based on the results of statistical processing of a sample of multi-unit residential buildings with a height of up to 10 floors, the dependence of the maximum specific power on the number of apartments in multi-unit residential buildings was determined with a trend line that clearly illustrates the trends in the studied dependence. Changes to the regulatory document SP 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules" for calculating the electrical loads of multi-unit residential buildings up to 10 floors in Moscow.
- Open Access
- 22 December 2022
- Published by FSEI HPE Murmansk State Technical University in Vestnik MGTU
- Vol. 25 (4)
Calculation of specific electrical loads of residential buildings based on actual measurements
Updating the development of specific electrical loads of residential buildings of clusters 1 (up to 5 floors) and 2 (6-11 floors) based on actual measurements (with amendments to the Code of Rules 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules") contributes reducing the cost of technological connection in residential construction, as well as reducing the actual unused "locked power" at the same time as reducing electricity losses in power transformers. In the course of the study, an analysis has been made of the actual electrical loads of residential buildings in Moscow for the periods from November 1 to November 30, 2021 and from December 25, 2021 to January 31, 2022. The number of the studied sample for cluster 1 is 91 houses, for cluster 2 - 58 houses. When determining the maximum specific power of a sample set of multi-apartment residential buildings in Moscow in clusters 1 and 2, an average value and a confidence interval have been established, which "covers" the average of the general population with a probability of 95 %; a comparative analysis of the actual specific electrical loads of a residential building with the loads given in the Code of Rules has been carried out. Based on the results of statistical processing of a sample of multi-apartment buildings in clusters 1 and 2, the dependence of the maximum specific power on the number of apartments in a residential building has been determined with a trend line that clearly illustrates the trend in the studied dependence.
- 22 December 2022
- Published by FSEI HPE Murmansk State Technical University in Vestnik MGTU
- Vol. 25 (4)
Open AccessCalculation of specific electrical loads of residential buildings based on actual measurements
Updating the development of specific electrical loads of residential buildings of clusters 1 (up to 5 floors) and 2 (6-11 floors) based on actual measurements (with amendments to the Code of Rules 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules") contributes reducing the cost of technological connection in residential construction, as well as reducing the actual unused "locked power" at the same time as reducing electricity losses in power transformers. In the course of the study, an analysis has been made of the actual electrical loads of residential buildings in Moscow for the periods from November 1 to November 30, 2021 and from December 25, 2021 to January 31, 2022. The number of the studied sample for cluster 1 is 91 houses, for cluster 2 - 58 houses. When determining the maximum specific power of a sample set of multi-apartment residential buildings in Moscow in clusters 1 and 2, an average value and a confidence interval have been established, which "covers" the average of the general population with a probability of 95 %; a comparative analysis of the actual specific electrical loads of a residential building with the loads given in the Code of Rules has been carried out. Based on the results of statistical processing of a sample of multi-apartment buildings in clusters 1 and 2, the dependence of the maximum specific power on the number of apartments in a residential building has been determined with a trend line that clearly illustrates the trend in the studied dependence.
- 13 November 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 80-83
Monitoring of Electrical Consumption, Including Self-Isolation During the COVID-19 Pandemic
To date, one of the most relevant tasks is a justified calculation of the electrical capacity of residential buildings and public facilities. Studies conducted by the “Roselectromontazh” Association have shown a significant difference between the actual and calculated electrical capacity, which is further confirmed by the reports of electric grid companies. In some cases, there is a 3-fold difference. This occurs due to the emergence of a sustainable culture of electricity consumption and the use of highly energy-efficient devices. In 2019, the results of the research work were taken into account in the regional urban planning standards of the Republic of Tatarstan. On average, the normative values have been reduced by 2 times. This enabled a significant reduction in the difference between the actual and calculated electrical capacity. From 2020 onwards, leading construction companies in the Republic of Tatarstan are applying up-to-date values to decrease utility services’ construction costs. For power grid companies the savings consist of reduction of electrical energy losses and “locked electrical capacity” and the elimination of inefficient investments. It is important to note that specific values of electrical load were calculated taking into account summer and winter peaks in order to exclude the emergencies. However, it was impossible to predict a time when people would need to stay self-isolated at home to prevent the spread of severe acute respiratory syndrome–related coronavirus SARS-CoV-2 (COVID-2019). Corresponding diagrams relative to 2019 were constructed to determine the impact of the electricity consumption of residential buildings during lockdown.
- 13 November 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 80-83
Monitoring of Electrical Consumption, Including Self-Isolation During the COVID-19 Pandemic
To date, one of the most relevant tasks is a justified calculation of the electrical capacity of residential buildings and public facilities. Studies conducted by the “Roselectromontazh” Association have shown a significant difference between the actual and calculated electrical capacity, which is further confirmed by the reports of electric grid companies. In some cases, there is a 3-fold difference. This occurs due to the emergence of a sustainable culture of electricity consumption and the use of highly energy-efficient devices. In 2019, the results of the research work were taken into account in the regional urban planning standards of the Republic of Tatarstan. On average, the normative values have been reduced by 2 times. This enabled a significant reduction in the difference between the actual and calculated electrical capacity. From 2020 onwards, leading construction companies in the Republic of Tatarstan are applying up-to-date values to decrease utility services’ construction costs. For power grid companies the savings consist of reduction of electrical energy losses and “locked electrical capacity” and the elimination of inefficient investments. It is important to note that specific values of electrical load were calculated taking into account summer and winter peaks in order to exclude the emergencies. However, it was impossible to predict a time when people would need to stay self-isolated at home to prevent the spread of severe acute respiratory syndrome–related coronavirus SARS-CoV-2 (COVID-2019). Corresponding diagrams relative to 2019 were constructed to determine the impact of the electricity consumption of residential buildings during lockdown.