Mohammed Bennekrouf
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Mohammed Bennekrouf has a total of 9 co-authors. Here are the top co-authors by number of shared publications:
- Lamia Triqui-Sari
Abou Bekr Belkaid University of Tlemcen
3 shared publications - Fayçal Belkaid
Manufacturing Engineering Laboratory of Tlemcen, University of Tlemcen, Tlemcen, Algeria
2 shared publications Abdelkader Hadri
Manufacturing Engineering Laboratory of Tlemcen, University of Tlemcen, Tlemcen, Algeria
1 shared publication- Abdennour Ilyas Benfriha
University of Batna2,Laboratory of Automation and Manufacturing Engineering,Department of industrial Engineering,Batna,Algeria
1 shared publication - Abderrahmane Bensmaine
INRIA Nancy Grand-Est, ISGMP Bat. A, Ile du Saulcy, 57000 Metz, France
1 shared publication Aimed Eddine Bougloula
University of Batna2,Laboratory of Automation and Manufacturing Engineering,Department of industrial Engineering,Batna,Algeria
1 shared publication
Latest Publications
- 31 August 2024
- Published by Springer Nature in OPSEARCH
- p. 1-35
Operational planning of the production and the processing of chickens in multi-products slaughter unit
- 31 August 2024
- Published by Springer Nature in OPSEARCH
- p. 1-35
Operational planning of the production and the processing of chickens in multi-products slaughter unit
- 3 March 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Products exchange in a multi-level multi-period distribution network with limited storage capacity
Cooperation in distribution network has attracted the interest of researchers. In this study we analyse an inventory problem in distribution network, where we propose a cooperative platform that allow the members of the network to share and use local inventory of other members to meet their local demand. We develop a MIP models representing the traditional network and the network with the cooperative platform. Then we solve it using LINGO solver. We found that the proposed approach has reduced the total cost of the network and reduce the overstock and stock-out situation, which lead to improve the quality of service.
- 3 March 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Products exchange in a multi-level multi-period distribution network with limited storage capacity
Cooperation in distribution network has attracted the interest of researchers. In this study we analyse an inventory problem in distribution network, where we propose a cooperative platform that allow the members of the network to share and use local inventory of other members to meet their local demand. We develop a MIP models representing the traditional network and the network with the cooperative platform. Then we solve it using LINGO solver. We found that the proposed approach has reduced the total cost of the network and reduce the overstock and stock-out situation, which lead to improve the quality of service.
- 1 July 2020
- Published by IGI Global Scientific Publishing in International Journal of Applied Logistics
- Vol. 10 (2) , 25-44
An Efficient Approach for Solving Integrated Production and Distribution Planning Problems
The increasing customer expectations for customized products of high quality in short delays and the worldwide competition in terms of quality and costs have pushed industries to implement new strategies to manage their supply chain decisions. In this context, the integrated planning is becoming the most dominant over the operational research field because of its efficiency and its ability to cover the different aspects of the problem. Production routing problem is one of the problems of the integrated planning that is of interest in optimizing simultaneously production, inventory, and distribution planning. This paper has the purpose of developing two mono-objective models for the production-routing problem; one of them minimizes the total costs, while the other one minimizes the energy consumed by the production system. Finally, a bi-objective model is proposed to combine the two objectives mentioned previously using the LP-metric method in the context of a sustainable supply chain. Experimental results are also presented and discussed through the different scenarios.
- 1 July 2020
- Published by IGI Global Scientific Publishing in International Journal of Applied Logistics
- Vol. 10 (2) , 25-44
An Efficient Approach for Solving Integrated Production and Distribution Planning Problems
The increasing customer expectations for customized products of high quality in short delays and the worldwide competition in terms of quality and costs have pushed industries to implement new strategies to manage their supply chain decisions. In this context, the integrated planning is becoming the most dominant over the operational research field because of its efficiency and its ability to cover the different aspects of the problem. Production routing problem is one of the problems of the integrated planning that is of interest in optimizing simultaneously production, inventory, and distribution planning. This paper has the purpose of developing two mono-objective models for the production-routing problem; one of them minimizes the total costs, while the other one minimizes the energy consumed by the production system. Finally, a bi-objective model is proposed to combine the two objectives mentioned previously using the LP-metric method in the context of a sustainable supply chain. Experimental results are also presented and discussed through the different scenarios.
- 1 June 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Routing Planning of the Different Harvester for Organizing the Harvesting of Sugar Beet
This article proposes a planning of the routing path of the different beet lifters for the organization of the beet sugar harvest. The start of the production for sugar extraction is related to replenishment of the sugar beet, its synchronization with the date of operation of a set of harvesters is very critical. However, sugar beet is a biennial plant. Which gives more constraint for sugar production, which requires a thorough and precise study on the transport and storage of beet sugar in this study, our approach consists in proposing a harvesting circuit between the different places of cultivation of the sugar beet in the western region of Algeria. Our objective is to determine the necessary number of harvesters, in order to reduce the Investment cost relative to harvesters. In a second part, we compare two scenarios for replenishment of sugar beet. In the first scenario, the transfer of sugar beet is send directly to the production unit. In the second scenario, sugar beet is stored in zone storage cooperatives. Certainly this planning can help policy makers and farmers to work together to optimize transport, cost and time for the harvesting and processing areas
- 1 June 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Routing Planning of the Different Harvester for Organizing the Harvesting of Sugar Beet
This article proposes a planning of the routing path of the different beet lifters for the organization of the beet sugar harvest. The start of the production for sugar extraction is related to replenishment of the sugar beet, its synchronization with the date of operation of a set of harvesters is very critical. However, sugar beet is a biennial plant. Which gives more constraint for sugar production, which requires a thorough and precise study on the transport and storage of beet sugar in this study, our approach consists in proposing a harvesting circuit between the different places of cultivation of the sugar beet in the western region of Algeria. Our objective is to determine the necessary number of harvesters, in order to reduce the Investment cost relative to harvesters. In a second part, we compare two scenarios for replenishment of sugar beet. In the first scenario, the transfer of sugar beet is send directly to the production unit. In the second scenario, sugar beet is stored in zone storage cooperatives. Certainly this planning can help policy makers and farmers to work together to optimize transport, cost and time for the harvesting and processing areas
- 1 April 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. 0021266798, 158-163
Efficient Approach for Parallel Machine Scheduling Problem
In this paper, we consider a parallel machine scheduling problem with non-renewable resources. Each job consumes several components and must be processed in one stage composed of identical parallel machines. Resources availability operations, jobs assignment and sequencing are considered and optimized simultaneously. In order to find an optimal solution, an exact method is applied to optimize the total completion time. Due to the problem complexity and prohibitive computational time to obtain an exact solution, a metaheuristic approach based genetic algorithm is proposed and several heuristics are adapted to solve it. Moreover, the impact of non-renewable resources procurement methods on production scheduling is analyzed. The system performances are evaluated in terms of measures such as the solution quality and the execution time. The simulation results show that the proposed genetic algorithm gives the same results as the exact method for small instances and performs the best compared to heuristics for medium and large instances.
- 1 April 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. 0021266798, 158-163
Efficient Approach for Parallel Machine Scheduling Problem
In this paper, we consider a parallel machine scheduling problem with non-renewable resources. Each job consumes several components and must be processed in one stage composed of identical parallel machines. Resources availability operations, jobs assignment and sequencing are considered and optimized simultaneously. In order to find an optimal solution, an exact method is applied to optimize the total completion time. Due to the problem complexity and prohibitive computational time to obtain an exact solution, a metaheuristic approach based genetic algorithm is proposed and several heuristics are adapted to solve it. Moreover, the impact of non-renewable resources procurement methods on production scheduling is analyzed. The system performances are evaluated in terms of measures such as the solution quality and the execution time. The simulation results show that the proposed genetic algorithm gives the same results as the exact method for small instances and performs the best compared to heuristics for medium and large instances.