Nurzhigit Sarybayev
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Nurzhigit Sarybayev has a total of 36 co-authors. Here are the top co-authors by number of shared publications:
- Serik Moldabayev
Satbayev University
6 shared publications - Dmytro Babets
Department of Applied Mathematics, Dnipro University of Technology, 49005 Dnipro, Ukraine
3 shared publications - Olena Sdvyzhkova
Department of Applied Mathematics, Dnipro University of Technology, 49005 Dnipro, Ukraine
3 shared publications - Serik Moldabayev
Department of Mining, Satbayev University, Almaty 050013, Kazakhstan
3 shared publications - Alikhan Khairullayev
Department of Mining, Satbayev University, Almaty 050013, Kazakhstan
2 shared publications - Assel Nurmanova
Satbayev University
2 shared publications
Latest Publications
- 27 October 2026
- Published by Dnipro University of Technology in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
- No. 5,p. 63-73
3D simulation of longwall-gateroad interaction in close coal seams
Purpose. To establish the regularities governing the evolution of the stress–strain state of a rock mass during mining operations in closely spaced coal seams with weak surrounding rocks, typical of the Western Donbas conditions, taking into account the spatial and temporal interaction between longwall faces and development gateroads. Methodology. The stress–strain state of the rock mass surrounding both longwall and development workings is determined using the finite element method (FEM). The study emphasizes the combined use of both two-dimensional and three-dimensional computational schemes, as well as different deformation models. In particular, a three-dimensional elastic FEM model is employed to simulate the spatial interaction between the longwall face and the gateroad; a two-dimensional elastoplastic FEM model based on the generalized Hoek–Brown failure criterion is used to analyze the stress state in the gateroad cross-section. A comprehensive approach is proposed, involving the consistent integration of these models within a unified numerical modeling framework, enabling a more accurate representation of the spatial–temporal evolution of mining operations and the interaction between excavations. Findings. The study reveals the regular patterns of increasing stress concentration within the rock mass located between the advancing faces of the longwall and the gateroad, which move toward each other at different horizontal levels (coal seams). A critical distance between the longwall face and the gateroad face has been identified, at which the destructive influence of the upper seam longwall on the lower seam gateroad begins to manifest. Based on the numerical modeling results, a relationship has been established between the extent of the plastic zone in the roof and the decreasing distance between the advancing faces in closely spaced coal seams. Originality. By combining two-dimensional and three-dimensional computational approaches, as well as integrating elastic and elastoplastic Hoek–Brown models, new regularities of the interaction between a longwall face and an underlying gateroad have been identified. These include the evolution of stress concentration, expansion of plastic zones, increase in displacements, and growth of internal forces in steel arch support elements. Practical value. The established regularities can be applied in the design of mining operations under similar geological conditions, for the development of support design guidelines for development gateroad, and for improving regulatory documents governing mining in closely spaced coal seams.
- 27 October 2026
- Published by Dnipro University of Technology in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
- No. 5,p. 63-73
3D simulation of longwall-gateroad interaction in close coal seams
Purpose. To establish the regularities governing the evolution of the stress–strain state of a rock mass during mining operations in closely spaced coal seams with weak surrounding rocks, typical of the Western Donbas conditions, taking into account the spatial and temporal interaction between longwall faces and development gateroads. Methodology. The stress–strain state of the rock mass surrounding both longwall and development workings is determined using the finite element method (FEM). The study emphasizes the combined use of both two-dimensional and three-dimensional computational schemes, as well as different deformation models. In particular, a three-dimensional elastic FEM model is employed to simulate the spatial interaction between the longwall face and the gateroad; a two-dimensional elastoplastic FEM model based on the generalized Hoek–Brown failure criterion is used to analyze the stress state in the gateroad cross-section. A comprehensive approach is proposed, involving the consistent integration of these models within a unified numerical modeling framework, enabling a more accurate representation of the spatial–temporal evolution of mining operations and the interaction between excavations. Findings. The study reveals the regular patterns of increasing stress concentration within the rock mass located between the advancing faces of the longwall and the gateroad, which move toward each other at different horizontal levels (coal seams). A critical distance between the longwall face and the gateroad face has been identified, at which the destructive influence of the upper seam longwall on the lower seam gateroad begins to manifest. Based on the numerical modeling results, a relationship has been established between the extent of the plastic zone in the roof and the decreasing distance between the advancing faces in closely spaced coal seams. Originality. By combining two-dimensional and three-dimensional computational approaches, as well as integrating elastic and elastoplastic Hoek–Brown models, new regularities of the interaction between a longwall face and an underlying gateroad have been identified. These include the evolution of stress concentration, expansion of plastic zones, increase in displacements, and growth of internal forces in steel arch support elements. Practical value. The established regularities can be applied in the design of mining operations under similar geological conditions, for the development of support design guidelines for development gateroad, and for improving regulatory documents governing mining in closely spaced coal seams.
- 26 September 2026
- Published by Dnipro University of Technology in Mining of Mineral Deposits
- Vol. 20 (3) , 86-96
Innovative solutions for improving energy efficiency in the mining industry
Purpose. To substantiate solutions for improving energy efficiency in the mining industry through the integration of renewable energy sources (RES), energy management systems (EMS), and hybrid energy technologies, considering their energy, environmental, and economic performance. Methods. The study used theoretical analysis, comparative assessment, mathematical calculations, and data processing based on scientific publications and international reports. The main indicators of RES, EMS, and hybrid systems were compared using common energy, environmental, and economic parameters. Calculations were performed using Python with NumPy and Pandas libraries and SMath Solver. Three scenarios were considered: conventional energy consumption, RES integration, and hybrid energy supply. Findings. The results indicate that RES integration can reduce energy consumption by 10-30%, while hybrid systems provide a reduction of 15-35% and reported system-efficiency values of 70-90%. EMS can reduce energy consumption by 8-25%, peak loads by 10-30%, and CO2 emissions by 6-20%. Total investment costs for RES projects were estimated at 57.5-156 million USD. For hybrid systems, the required investment ranges from USD 2.5 to 7.5 million, with annual savings of USD 0.5 to 1.2 million and a payback period of up to 10 years, whereas EMS require substantially lower capital investment and have a payback period of up to 6 years. Originality. A comparative assessment of RES, EMS, and hybrid energy technologies was performed using a common set of energy, environmental, and economic indicators, which made it possible to identify differences in their efficiency, investment requirements, and implementation conditions. Practical implications. The obtained results can be used to support the selection of energy-efficiency solutions for mining enterprises depending on production scale, investment capacity, infrastructure readiness, and expected energy savings.
- 26 September 2026
- Published by Dnipro University of Technology in Mining of Mineral Deposits
- Vol. 20 (3) , 86-96
Innovative solutions for improving energy efficiency in the mining industry
Purpose. To substantiate solutions for improving energy efficiency in the mining industry through the integration of renewable energy sources (RES), energy management systems (EMS), and hybrid energy technologies, considering their energy, environmental, and economic performance. Methods. The study used theoretical analysis, comparative assessment, mathematical calculations, and data processing based on scientific publications and international reports. The main indicators of RES, EMS, and hybrid systems were compared using common energy, environmental, and economic parameters. Calculations were performed using Python with NumPy and Pandas libraries and SMath Solver. Three scenarios were considered: conventional energy consumption, RES integration, and hybrid energy supply. Findings. The results indicate that RES integration can reduce energy consumption by 10-30%, while hybrid systems provide a reduction of 15-35% and reported system-efficiency values of 70-90%. EMS can reduce energy consumption by 8-25%, peak loads by 10-30%, and CO2 emissions by 6-20%. Total investment costs for RES projects were estimated at 57.5-156 million USD. For hybrid systems, the required investment ranges from USD 2.5 to 7.5 million, with annual savings of USD 0.5 to 1.2 million and a payback period of up to 10 years, whereas EMS require substantially lower capital investment and have a payback period of up to 6 years. Originality. A comparative assessment of RES, EMS, and hybrid energy technologies was performed using a common set of energy, environmental, and economic indicators, which made it possible to identify differences in their efficiency, investment requirements, and implementation conditions. Practical implications. The obtained results can be used to support the selection of energy-efficiency solutions for mining enterprises depending on production scale, investment capacity, infrastructure readiness, and expected energy savings.
- Open Access
- 15 September 2026
- Published by MDPI AG in Geosciences
- Vol. 16 (9) , 374
Numerical Simulation of Interlevel Pillar Response During Underground Gold Ore Mining: The Akbakay Deposit Case
Designing interlevel pillars for deep, structurally complex vein deposits requires balancing rock mass stability against ore recovery. This study evaluates the geomechanical response of the Kenzhem area of the Akbakay gold deposit using a three-dimensional finite-element model that reproduces the lithological structure, irregular ore-body geometry, underground workings, and mined-out stopes. Four extraction scenarios were analyzed: complete extraction without pillars and mining with 10, 15, and 20 m inter-stope pillars. Stability was assessed using maximum total displacement, the extent and connectivity of yielded zones predicted by the generalized Hoek–Brown criterion, and numerical convergence. Pillarless extraction produced displacements of 2.6–3.0 m, a continuous yielded zone extending toward the surface, and loss of numerical convergence. A 10 m pillar reduced displacements to 0.50–0.66 m but did not provide a stable equilibrium state. Increasing the pillar thickness to 15 m reduced the maximum displacement to approximately 0.08 m, localized the yielded zones near excavation boundaries, and ensured convergence. A 20 m pillar produced only a minor additional reduction to 0.065–0.070 m without materially changing the failure pattern. Therefore, a 15 m inter-stope pillar provides the most rational balance between geomechanical safety and ore recovery under the investigated conditions.
- 15 September 2026
- Published by MDPI AG in Geosciences
- Vol. 16 (9) , 374
Open AccessNumerical Simulation of Interlevel Pillar Response During Underground Gold Ore Mining: The Akbakay Deposit Case
Designing interlevel pillars for deep, structurally complex vein deposits requires balancing rock mass stability against ore recovery. This study evaluates the geomechanical response of the Kenzhem area of the Akbakay gold deposit using a three-dimensional finite-element model that reproduces the lithological structure, irregular ore-body geometry, underground workings, and mined-out stopes. Four extraction scenarios were analyzed: complete extraction without pillars and mining with 10, 15, and 20 m inter-stope pillars. Stability was assessed using maximum total displacement, the extent and connectivity of yielded zones predicted by the generalized Hoek–Brown criterion, and numerical convergence. Pillarless extraction produced displacements of 2.6–3.0 m, a continuous yielded zone extending toward the surface, and loss of numerical convergence. A 10 m pillar reduced displacements to 0.50–0.66 m but did not provide a stable equilibrium state. Increasing the pillar thickness to 15 m reduced the maximum displacement to approximately 0.08 m, localized the yielded zones near excavation boundaries, and ensured convergence. A 20 m pillar produced only a minor additional reduction to 0.065–0.070 m without materially changing the failure pattern. Therefore, a 15 m inter-stope pillar provides the most rational balance between geomechanical safety and ore recovery under the investigated conditions.
- Open Access
- 3 August 2026
- Published by MDPI AG in Preprints.org
Numerical Simulation of Interlevel Pillar Response During Underground Gold Ore Mining: The Akbakay Deposit Case
Designing interlevel pillars for deep, structurally complex vein deposits requires balancing rock mass stability against ore recovery. This study evaluates the geomechanical response of the Kenzhem area of the Akbakay gold deposit using a three-dimensional finite-element model that reproduces the lithological structure, irregular ore-body geometry, underground workings, and mined-out stopes. Four extraction scenarios were analyzed: complete extraction without pillars and mining with 10, 15, and 20 m inter-stope pillars. Stability was assessed using maximum total displacement, the extent and connectivity of yielded zones predicted by the generalized Hoek–Brown criterion, and numerical convergence. Pillarless extraction produced displacements of 2.6–3.0 m, a continuous yielded zone extending toward the surface, and loss of numerical convergence. A 10 m pillar reduced displacements to 0.50–0.66 m but did not provide a stable equilibrium state. Increasing the pillar thickness to 15 m reduced the maximum displacement to approximately 0.08 m, localized the yielded zones near excavation boundaries, and ensured convergence. A 20 m pillar produced only a minor additional reduction to 0.065–0.070 m without materially changing the failure pattern. Therefore, a 15 m inter-stope pillar provides the most rational balance between geomechanical safety and ore recovery under the investigated conditions.
- 3 August 2026
- Published by MDPI AG in Preprints.org
Open AccessNumerical Simulation of Interlevel Pillar Response During Underground Gold Ore Mining: The Akbakay Deposit Case
Designing interlevel pillars for deep, structurally complex vein deposits requires balancing rock mass stability against ore recovery. This study evaluates the geomechanical response of the Kenzhem area of the Akbakay gold deposit using a three-dimensional finite-element model that reproduces the lithological structure, irregular ore-body geometry, underground workings, and mined-out stopes. Four extraction scenarios were analyzed: complete extraction without pillars and mining with 10, 15, and 20 m inter-stope pillars. Stability was assessed using maximum total displacement, the extent and connectivity of yielded zones predicted by the generalized Hoek–Brown criterion, and numerical convergence. Pillarless extraction produced displacements of 2.6–3.0 m, a continuous yielded zone extending toward the surface, and loss of numerical convergence. A 10 m pillar reduced displacements to 0.50–0.66 m but did not provide a stable equilibrium state. Increasing the pillar thickness to 15 m reduced the maximum displacement to approximately 0.08 m, localized the yielded zones near excavation boundaries, and ensured convergence. A 20 m pillar produced only a minor additional reduction to 0.065–0.070 m without materially changing the failure pattern. Therefore, a 15 m inter-stope pillar provides the most rational balance between geomechanical safety and ore recovery under the investigated conditions.
- Open Access
Assessment of Intact Rock Parameters and Their Conditional Upscaling to the Rock Mass Scale
Lithological, metasomatic, and structural heterogeneity in ore-hosting rocks limits the reliability of applying a single set of mechanical parameters without domain subdivision. This study evaluates intact rock properties, shear resistance along natural discontinuities, and conditional upscaling to the rock mass scale. The database comprised 232 laboratory records from 36 geotechnical borehole identifiers: 73 Brazilian tensile tests, 68 uniaxial compression tests, 49 triaxial compression tests, and 42 direct shear tests. Four domains were defined: D1, beresite-altered granodiorites; D2, diorites; D3, granodiorites; and D4, lamprophyre dikes. The lowest mean uniaxial compressive strength occurred in D1 (91.75 ± 40.65 MPa), whereas D2 showed the highest mean value, although its small sample size precludes confirmation as a domain characteristic. D3 provided the most representative dataset and exhibited intra-domain variability, while D4 showed the greatest variability in Young’s modulus (CV = 82.21%). Mean apparent cohesion along natural discontinuities was 0.125 ± 0.039 MPa for D1 and 0.140 ± 0.083 MPa for D3; D2 and D4 remain preliminary. GSI values of 48–58 were used only in scenario-based Hoek–Brown calculations. A ±5-point change in GSI altered equivalent rock mass strength by approximately −25% to −26% and +33% to +34%. The results support domain-based parameterization but require in situ verification.
Open AccessAssessment of Intact Rock Parameters and Their Conditional Upscaling to the Rock Mass Scale
Lithological, metasomatic, and structural heterogeneity in ore-hosting rocks limits the reliability of applying a single set of mechanical parameters without domain subdivision. This study evaluates intact rock properties, shear resistance along natural discontinuities, and conditional upscaling to the rock mass scale. The database comprised 232 laboratory records from 36 geotechnical borehole identifiers: 73 Brazilian tensile tests, 68 uniaxial compression tests, 49 triaxial compression tests, and 42 direct shear tests. Four domains were defined: D1, beresite-altered granodiorites; D2, diorites; D3, granodiorites; and D4, lamprophyre dikes. The lowest mean uniaxial compressive strength occurred in D1 (91.75 ± 40.65 MPa), whereas D2 showed the highest mean value, although its small sample size precludes confirmation as a domain characteristic. D3 provided the most representative dataset and exhibited intra-domain variability, while D4 showed the greatest variability in Young’s modulus (CV = 82.21%). Mean apparent cohesion along natural discontinuities was 0.125 ± 0.039 MPa for D1 and 0.140 ± 0.083 MPa for D3; D2 and D4 remain preliminary. GSI values of 48–58 were used only in scenario-based Hoek–Brown calculations. A ±5-point change in GSI altered equivalent rock mass strength by approximately −25% to −26% and +33% to +34%. The results support domain-based parameterization but require in situ verification.
- 30 August 2024
- Published by Dnipro University of Technology in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
- No. 4,p. 41-47
Implementation of a mathematical component in the device development for operational control of the dump truck
Purpose. To create a device for weighing mining rock loaded into the body of a dump truck after each cycle of its excavation. To develop a mathematical block for calculating the net mass of the rock without taking into account extraneous factors affecting the accuracy of the obtained result. To provide operational control of the nominal load of the dump truck by the driver and excavator operator. Methodology. The methodological basis for solving the task is a comprehensive approach which includes electronic modeling of technical processes, methods of mathematical statistics, analysis of results in a mathematical package and their applied application. Findings. A functional and principled electrical diagram of the device for weighing the mining rock loaded into the body of a dump truck and transferring the final information to this excavator has been compiled. A mathematical block of the device was created, capable of memorizing the signals received from the primary information sensors before weighing, and subtracting them from the signals received from these sensors after each weighing cycle. As sensors of primary information, it is proposed to use selsyns, which are part of the transformer mode, which are mass-produced by the industry, reliable in operation and easy to maintain. Originality. The proposed device is made at the level of the invention; its priority is determined by the constructive development and technical solution. Namely, the device is equipped with a multistable memory transformer, to the erasing winding of which a tachogenerator (or tachometer generator) is connected through an amplifier, a chain of series-connected trigger, multivibrator waiting and key, whose output is connected to the recording winding of the multistable memory transformer, as well as the transformer connected to the input winding of the multistable memory transformer. Moreover, the storage capacitor is connected to one of the key inputs, and the input windings of the transformer are connected to the weight sensor. Practical value. The use of the presented device allows for operational control of the nominal load of the dump truck, objective accounting of transported cargo and realized labor costs, as well as for applying optimal maintenance of cargo and transport works in quarries. In the future, this device will form the basis of a radio telemetry system for dispatching the operation of dump trucks.
- 30 August 2024
- Published by Dnipro University of Technology in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
- No. 4,p. 41-47
Implementation of a mathematical component in the device development for operational control of the dump truck
Purpose. To create a device for weighing mining rock loaded into the body of a dump truck after each cycle of its excavation. To develop a mathematical block for calculating the net mass of the rock without taking into account extraneous factors affecting the accuracy of the obtained result. To provide operational control of the nominal load of the dump truck by the driver and excavator operator. Methodology. The methodological basis for solving the task is a comprehensive approach which includes electronic modeling of technical processes, methods of mathematical statistics, analysis of results in a mathematical package and their applied application. Findings. A functional and principled electrical diagram of the device for weighing the mining rock loaded into the body of a dump truck and transferring the final information to this excavator has been compiled. A mathematical block of the device was created, capable of memorizing the signals received from the primary information sensors before weighing, and subtracting them from the signals received from these sensors after each weighing cycle. As sensors of primary information, it is proposed to use selsyns, which are part of the transformer mode, which are mass-produced by the industry, reliable in operation and easy to maintain. Originality. The proposed device is made at the level of the invention; its priority is determined by the constructive development and technical solution. Namely, the device is equipped with a multistable memory transformer, to the erasing winding of which a tachogenerator (or tachometer generator) is connected through an amplifier, a chain of series-connected trigger, multivibrator waiting and key, whose output is connected to the recording winding of the multistable memory transformer, as well as the transformer connected to the input winding of the multistable memory transformer. Moreover, the storage capacitor is connected to one of the key inputs, and the input windings of the transformer are connected to the weight sensor. Practical value. The use of the presented device allows for operational control of the nominal load of the dump truck, objective accounting of transported cargo and realized labor costs, as well as for applying optimal maintenance of cargo and transport works in quarries. In the future, this device will form the basis of a radio telemetry system for dispatching the operation of dump trucks.
- Open Access
- 30 June 2024
- Published by Kazakh University of Technology and Business in Вестник КазУТБ
- Vol. 2 (23)
Development and substantiation of rock unloading device with through-passing trucks
Different types of constructions of transshipment devices for combined schemes of automobile-conveyor transport are analyzed. A device of a new design was developed based on the identified shortcomings of known devices. The efficiency of the rock unloading device with through-passing trucks has been checked for the conditions of iron-ore mines in Kazakhstan. New device works because of rock weight force, which rotates bridges, that cover bunker for truck to move above it. Rotating bridges makes it possible to move rock down to bunker. After that, bridges close because of counterweight, which is a fence at the same time. The efficiency criteria of rock unloading device is volume reduce of mining capital works. Parameters were considered: width of the open-cast mine at the top and bottom, design depth of the mine, load capacity, turning radius and width of trucks, as well as the cost of extracting 1 m3 of rock. The dependence of reducing the costs of conducting mining capital works in deep open-cast mines during the construction of a transshipment point of combined automobile-conveyor transport with a through passage when unloading trucks from their carrying capacity have been established.
- 30 June 2024
- Published by Kazakh University of Technology and Business in Вестник КазУТБ
- Vol. 2 (23)
Open AccessDevelopment and substantiation of rock unloading device with through-passing trucks
Different types of constructions of transshipment devices for combined schemes of automobile-conveyor transport are analyzed. A device of a new design was developed based on the identified shortcomings of known devices. The efficiency of the rock unloading device with through-passing trucks has been checked for the conditions of iron-ore mines in Kazakhstan. New device works because of rock weight force, which rotates bridges, that cover bunker for truck to move above it. Rotating bridges makes it possible to move rock down to bunker. After that, bridges close because of counterweight, which is a fence at the same time. The efficiency criteria of rock unloading device is volume reduce of mining capital works. Parameters were considered: width of the open-cast mine at the top and bottom, design depth of the mine, load capacity, turning radius and width of trucks, as well as the cost of extracting 1 m3 of rock. The dependence of reducing the costs of conducting mining capital works in deep open-cast mines during the construction of a transshipment point of combined automobile-conveyor transport with a through passage when unloading trucks from their carrying capacity have been established.
- 25 December 2022
- Published by Dnipro University of Technology in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
- No. 6,p. 5-10
Technology of an open pit refinement under limit stability of sides
Purpose. To establish the feasibility of refining deep open-pit mines below the boundary of the use of combined motor-conveyor transport with an increased slope angles of the pit walls using the developed transport unit for reloading rocks to overlying horizons during the reactivation of pillars under transport berms. Methodology. Preparation of a digital block model of the deposit, the elaboration of 3D geomechanical models for the dynamics of mining, 2D and 3D numerical simulation of the rock stress-strain state of the outcrops of opencast workings, mathematical modeling of stepwise ore reserves and mining schedule, patent research and feasibility study. Findings. It is advisable to carry out mining in terms of the marginal rock state with an increase in the slope of the pit sides below the limit of application of the cyclic and continuous method in ultra-deep open pits. Such design of pit sides is achieved when benches are mined from top to bottom within the boundaries of steeply inclined layers with the use of inter-bench loaders of the developed designed in the completion zone. Provisions for the selection and feasibility of using the loader in the deep zone are formulated based on demarcation of application zones of cyclic (road transport) and cyclic-flow (combined road-conveyor transport) technologies. Originality. Schematization of the mining operation was performed based on the calculated values of safety factor of sides, which allows increasing the slope angles of the pit walls of even ultra-deep open pits in the completion zone. It was found that with deepening of mining, the zones of potential sliding move away from the loose overburden to lower ore benches closer to the final depth of the Kacharsky open pit (760 m), but the safety factor corresponds to the required value according to the design standards. Practical value. An increase in the slope of the pit walls in the completion zone can be achieved using the developed loading installation, the main difference of which is that it can be moved without dismantling under conditions of reactivation of transport pillars (with an increase in lifting height by 1.54.5 times compared to the known equipment).
- 25 December 2022
- Published by Dnipro University of Technology in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
- No. 6,p. 5-10
Technology of an open pit refinement under limit stability of sides
Purpose. To establish the feasibility of refining deep open-pit mines below the boundary of the use of combined motor-conveyor transport with an increased slope angles of the pit walls using the developed transport unit for reloading rocks to overlying horizons during the reactivation of pillars under transport berms. Methodology. Preparation of a digital block model of the deposit, the elaboration of 3D geomechanical models for the dynamics of mining, 2D and 3D numerical simulation of the rock stress-strain state of the outcrops of opencast workings, mathematical modeling of stepwise ore reserves and mining schedule, patent research and feasibility study. Findings. It is advisable to carry out mining in terms of the marginal rock state with an increase in the slope of the pit sides below the limit of application of the cyclic and continuous method in ultra-deep open pits. Such design of pit sides is achieved when benches are mined from top to bottom within the boundaries of steeply inclined layers with the use of inter-bench loaders of the developed designed in the completion zone. Provisions for the selection and feasibility of using the loader in the deep zone are formulated based on demarcation of application zones of cyclic (road transport) and cyclic-flow (combined road-conveyor transport) technologies. Originality. Schematization of the mining operation was performed based on the calculated values of safety factor of sides, which allows increasing the slope angles of the pit walls of even ultra-deep open pits in the completion zone. It was found that with deepening of mining, the zones of potential sliding move away from the loose overburden to lower ore benches closer to the final depth of the Kacharsky open pit (760 m), but the safety factor corresponds to the required value according to the design standards. Practical value. An increase in the slope of the pit walls in the completion zone can be achieved using the developed loading installation, the main difference of which is that it can be moved without dismantling under conditions of reactivation of transport pillars (with an increase in lifting height by 1.54.5 times compared to the known equipment).
- 15 November 2022
- Published by STEF92 Technology
- Vol. 22, 339-346
PROVISIONS FOR CLEANING-UP DEEP ZONE OF OPEN PIT MINES USING LOADING DEVICES
It is advisable to conduct mining operations in the conditions of the ultimate state of the opened massif with an increase in the pit wall slope angles below the limit of effective use of combined motor-conveyor transport in the cleaning-up zone of deep and ultradeep open pit mines to the final depth. Such a design of the pit walls is achieved when mining benches from top to bottom within the boundaries of steep-slope layers with the use of in-bench loaders in the cleaning-up zone. The conditions for the occurrence of irreversible shear deformations in rock layers and the position of the potential sliding surface with an increase in the pit walls slope angle of steeply inclined layers in the conditions of the ultra-deep Kachar iron ore open pit mine to critical values are established. It is advisable to use skips as the load-carrying body of the in-bench loader, the design of the supports of which allows it to be built with a lifting height of more than 30 m with the possibility of moving along the pit wall with variable berm elevations. The main provisions on the selection and justification of the expediency of using a loading device for operation in the deep zone are formulated based on the differentiation of the application zones of cyclic (motor transport) and cyclic and continuous method (combined motor-conveyor transport). In particular, the total costs of transporting rock mass according to the new scheme of combined in-pit transport with the use of a loading device for operation in the deep zone should be less than the costs of transportation according to existing or traditional schemes.
- 15 November 2022
- Published by STEF92 Technology
- Vol. 22, 339-346
PROVISIONS FOR CLEANING-UP DEEP ZONE OF OPEN PIT MINES USING LOADING DEVICES
It is advisable to conduct mining operations in the conditions of the ultimate state of the opened massif with an increase in the pit wall slope angles below the limit of effective use of combined motor-conveyor transport in the cleaning-up zone of deep and ultradeep open pit mines to the final depth. Such a design of the pit walls is achieved when mining benches from top to bottom within the boundaries of steep-slope layers with the use of in-bench loaders in the cleaning-up zone. The conditions for the occurrence of irreversible shear deformations in rock layers and the position of the potential sliding surface with an increase in the pit walls slope angle of steeply inclined layers in the conditions of the ultra-deep Kachar iron ore open pit mine to critical values are established. It is advisable to use skips as the load-carrying body of the in-bench loader, the design of the supports of which allows it to be built with a lifting height of more than 30 m with the possibility of moving along the pit wall with variable berm elevations. The main provisions on the selection and justification of the expediency of using a loading device for operation in the deep zone are formulated based on the differentiation of the application zones of cyclic (motor transport) and cyclic and continuous method (combined motor-conveyor transport). In particular, the total costs of transporting rock mass according to the new scheme of combined in-pit transport with the use of a loading device for operation in the deep zone should be less than the costs of transportation according to existing or traditional schemes.
- 2 July 2021
- Published by Interrin Scientific and Production Enterprise LLP in Горный журнал Казахстана
- No. 6(194),p. 20-24
Циклично-поточная технология добычи угля
This article discusses the current state of the coal industry in the world. The main problems that create barriers to this industry are presented. The importance of coal mining for the developing countries of the world is indicated. The role of coal as one of the main energy resources in modern society is noted. The state of coal mining at domestic mines is discussed. The necessity of using effective mining technologies that will improve the productivity of mining enterprises specializing in coal mining is indicated. The advantages of the introduction of cyclic and continuous method of coal mining are presented on the example of the domestic coal mine Vostochnyi. The main tendencies in the development of cyclic and continuous method in open-pit mining in the countries of the Commonwealth of Independent States are presented. The advantages of the introduction of conveyor transport in mining deep coal and ore deposits are shown. В данной статье обсуждается текущее состояние угольной промышленности мира. Приведены основные проблемы, создающие преграды перед данной отраслью. Обозначена важность добычи угля для развивающихся стран мира. Отмечена роль угля как одного из основных энергетических ресурсов в современном обществе. Обсуждены тенденции добычи угля на отечественных разрезах. Обозначена необходимость применения эффективных технологий добычи, которые позволят улучшить производительность горных предприятий, специализирующихся на добыче угля. На примере отечественного разреза Восточный отмечены преимущества внедрения циклично-поточной технологии при добыче угля. Приведены основные тенденции в развитии циклично-поточной технологии на открытых горных работах в странах Содружества Независимых Государств. Показаны преимущества внедрения конвейерного транспорта при разработке глубоких угольных и рудных месторождений.
- 2 July 2021
- Published by Interrin Scientific and Production Enterprise LLP in Горный журнал Казахстана
- No. 6(194),p. 20-24
Циклично-поточная технология добычи угля
This article discusses the current state of the coal industry in the world. The main problems that create barriers to this industry are presented. The importance of coal mining for the developing countries of the world is indicated. The role of coal as one of the main energy resources in modern society is noted. The state of coal mining at domestic mines is discussed. The necessity of using effective mining technologies that will improve the productivity of mining enterprises specializing in coal mining is indicated. The advantages of the introduction of cyclic and continuous method of coal mining are presented on the example of the domestic coal mine Vostochnyi. The main tendencies in the development of cyclic and continuous method in open-pit mining in the countries of the Commonwealth of Independent States are presented. The advantages of the introduction of conveyor transport in mining deep coal and ore deposits are shown. В данной статье обсуждается текущее состояние угольной промышленности мира. Приведены основные проблемы, создающие преграды перед данной отраслью. Обозначена важность добычи угля для развивающихся стран мира. Отмечена роль угля как одного из основных энергетических ресурсов в современном обществе. Обсуждены тенденции добычи угля на отечественных разрезах. Обозначена необходимость применения эффективных технологий добычи, которые позволят улучшить производительность горных предприятий, специализирующихся на добыче угля. На примере отечественного разреза Восточный отмечены преимущества внедрения циклично-поточной технологии при добыче угля. Приведены основные тенденции в развитии циклично-поточной технологии на открытых горных работах в странах Содружества Независимых Государств. Показаны преимущества внедрения конвейерного транспорта при разработке глубоких угольных и рудных месторождений.