Siqi Liu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Siqi Liu has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
Daozhuo Jiang
3 shared publications- Pengfei Hu
School of Electrical Engineering, Zhejiang University, Hangzhou 310027, China
3 shared publications Yiqiao Liang
School of Information & Electrical Engineering Zhejiang University City College Hangzhou Zhejiang Province People's Republic of China
2 shared publicationsJinwu Zhuang
College of Electrical Engineering Naval University of Engineering Wuhan People's Republic of China
1 shared publicationNaixuan Zhu
1 shared publication- Naixuan Zhu
College of Electrical Engineering Zhejiang University Hangzhou People's Republic of China
1 shared publication
Latest Publications
- Open Access
- 5 January 2023
- Published by Elsevier in Energy Reports
- Vol. 9, 255-262
A double-break current injection vacuum DCCB: Principle and analysis
- 5 January 2023
- Published by Elsevier in Energy Reports
- Vol. 9, 255-262
Open AccessA double-break current injection vacuum DCCB: Principle and analysis
- Open Access
- 23 September 2021
- Published by Institution of Engineering and Technology (IET) in IET Generation, Transmission & Distribution
- Vol. 16 (2) , 305-318
Emergency reserve constrained optimal allocation of energy storage in a novel honeycomb‐like microgrid cluster with volatile renewable energy resources
With the increasing penetration of large‐scale distributed renewable energies, the electricity distribution network is growing more complex with challenges brought by the intermittency and uncertainty of renewable energies. Microgrid (MG), one of feasible solutions to integrating renewable energies, has shortages because of limited capacity. Therefore, MG cluster (MGC) was proposed as an improved solution. To efficiently and friendly integrate renewable energies, a novel honeycomb‐like MG cluster (H‐MGC) is proposed in this paper. Considering the uncertainty of renewable energies, a robust optimisation method of the siting and sizing of energy storage system (ESS) constrained by emergency reserve is proposed. Combining the column‐and‐constraint generation algorithm and big‐M method, the proposed optimisation model is decomposed into mixed integer second‐order cone programming master problem and sub‐problems, which are alternately solved. Based on the optimal results of study case, the siting and sizing results of ESS are analysed, as well as the operating characteristics of H‐MGC. Compared to existing MGC system, the proposed H‐MGC has a more flexible operation mode. The related costs of ESS are reduced, and the operational life is relatively extended, under the condition that the emergency reserve of system is satisfied.
- 23 September 2021
- Published by Institution of Engineering and Technology (IET) in IET Generation, Transmission & Distribution
- Vol. 16 (2) , 305-318
Open AccessEmergency reserve constrained optimal allocation of energy storage in a novel honeycomb‐like microgrid cluster with volatile renewable energy resources
With the increasing penetration of large‐scale distributed renewable energies, the electricity distribution network is growing more complex with challenges brought by the intermittency and uncertainty of renewable energies. Microgrid (MG), one of feasible solutions to integrating renewable energies, has shortages because of limited capacity. Therefore, MG cluster (MGC) was proposed as an improved solution. To efficiently and friendly integrate renewable energies, a novel honeycomb‐like MG cluster (H‐MGC) is proposed in this paper. Considering the uncertainty of renewable energies, a robust optimisation method of the siting and sizing of energy storage system (ESS) constrained by emergency reserve is proposed. Combining the column‐and‐constraint generation algorithm and big‐M method, the proposed optimisation model is decomposed into mixed integer second‐order cone programming master problem and sub‐problems, which are alternately solved. Based on the optimal results of study case, the siting and sizing results of ESS are analysed, as well as the operating characteristics of H‐MGC. Compared to existing MGC system, the proposed H‐MGC has a more flexible operation mode. The related costs of ESS are reduced, and the operational life is relatively extended, under the condition that the emergency reserve of system is satisfied.
- Open Access
- 25 June 2021
- Published by Institution of Engineering and Technology (IET) in IET Generation, Transmission & Distribution
- Vol. 15 (21) , 3058-3065
A fast LVDC vacuum hybrid circuit breaker: Dielectric recovery and design consideration
Aiming at the fast protection requirements of electrical ships LVDC distribution system, this paper studies a topology of unidirectional vacuum hybrid circuit breaker. The hybrid circuit breaker is an improved current injection LVDC breaker based on precharged capacitor, which improves the dielectric recovery capability of vacuum interrupter after artificial current zero by using a freewheel diode. A synthetic test platform is built to study the dielectric strength recovery characteristics of a 45 mm diameter CuCr50 butt contact vacuum interrupter (driven by Thomson coil actuator, average opening speed of about 3 m/s)under high current(about 20 kA) and small gap(about 1 mm). The experimental results indicate that the dielectric strength of the contact can recover at a very fast speed within the arc time of 100 µs; when the arc time is increased to 320 µs, the dielectric strength of the contact cannot recover for a long time. Therefore, the design principle of the circuit breaker is obtained: within the arc time of 100 µs, by increasing the arc time can increase the contact distance, so the transient interruption voltage tolerance margin of the circuit breaker can be improved. Based on the results of the test, this paper also proposes a calculation method of forced commutation circuit parameters, which is verified by the simulation. The research results show that the DC circuit breaker can realise the rapid breaking of 20 kA fault current within 2 ms, and has a good application prospect in the LVDC distribution system.
- 25 June 2021
- Published by Institution of Engineering and Technology (IET) in IET Generation, Transmission & Distribution
- Vol. 15 (21) , 3058-3065
Open AccessA fast LVDC vacuum hybrid circuit breaker: Dielectric recovery and design consideration
Aiming at the fast protection requirements of electrical ships LVDC distribution system, this paper studies a topology of unidirectional vacuum hybrid circuit breaker. The hybrid circuit breaker is an improved current injection LVDC breaker based on precharged capacitor, which improves the dielectric recovery capability of vacuum interrupter after artificial current zero by using a freewheel diode. A synthetic test platform is built to study the dielectric strength recovery characteristics of a 45 mm diameter CuCr50 butt contact vacuum interrupter (driven by Thomson coil actuator, average opening speed of about 3 m/s)under high current(about 20 kA) and small gap(about 1 mm). The experimental results indicate that the dielectric strength of the contact can recover at a very fast speed within the arc time of 100 µs; when the arc time is increased to 320 µs, the dielectric strength of the contact cannot recover for a long time. Therefore, the design principle of the circuit breaker is obtained: within the arc time of 100 µs, by increasing the arc time can increase the contact distance, so the transient interruption voltage tolerance margin of the circuit breaker can be improved. Based on the results of the test, this paper also proposes a calculation method of forced commutation circuit parameters, which is verified by the simulation. The research results show that the DC circuit breaker can realise the rapid breaking of 20 kA fault current within 2 ms, and has a good application prospect in the LVDC distribution system.