Reinhard Perner
Research Subjects
Reinhard Perner has a total of 2 co-authors. Here are the top co-authors by number of shared publications:
- Georg Atzl
C consulenten ZT GmbH, Schönbrunner Str. 297, 1120 Vienna, Austria
1 shared publication - Roland Schorn
Porr Tunnelbau Seedorferstrasse 56 6460 Altdorf Switzerland
1 shared publication
Latest Publications
- 4 August 2021
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 14 (4) , 377-389
Neubau Albulatunnel II – Erfahrungen mit Stahlfaserspritzbeton
The new construction of the 5860 m long Albula Tunnel was mainly carried out by blasting from the Preda and Spinas portals. Due to the exposed location in the high mountains, mixing plants were installed on both portal sides for the concrete supply; the concrete aggregate was largely produced from the excavated material, with a gravel plant being built in Preda for this purpose. The planned tunnel lining provides for a single‐shell shotcrete construction for the most part. In the course of the excavation work, the excavation support was optimised so that the reinforcement mesh in the main support class in the single‐shell area were replaced by steel fibre shotcrete.
- 4 August 2021
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 14 (4) , 377-389
Neubau Albulatunnel II – Erfahrungen mit Stahlfaserspritzbeton
The new construction of the 5860 m long Albula Tunnel was mainly carried out by blasting from the Preda and Spinas portals. Due to the exposed location in the high mountains, mixing plants were installed on both portal sides for the concrete supply; the concrete aggregate was largely produced from the excavated material, with a gravel plant being built in Preda for this purpose. The planned tunnel lining provides for a single‐shell shotcrete construction for the most part. In the course of the excavation work, the excavation support was optimised so that the reinforcement mesh in the main support class in the single‐shell area were replaced by steel fibre shotcrete.