Towhid Pourrostam
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Towhid Pourrostam has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
- Hamidreza Abbasianjahromi
Department of Civil Engineering, K. N. Toosi University of Technology, Tehran, Iran
2 shared publications - Amir Mohammad Maleki Toulabi
Department of Civil Engineering, Qeshm Branch, Islamic Azad University, Qeshm, Iran
1 shared publication - Arash Gorgin Karaji
Department of Civil Engineering, Faculty of Civil and Earth Resources Engineering, Central Tehran Branch, Islamic Azad University, Tehran, Iran
1 shared publication - Babak Aminnejad
Department of Civil Engineering, Ro.C., Islamic Azad University, Roudehen, Iran
1 shared publication - Ebrahim Safa
Shahid Kalantari Complex, Department of Road and Transportation, South Tehran Branch, Islamic Azad University, Tehran 1777613651, Iran
1 shared publication Elham Moballeghi
Department of Civil Engineering, Centeral Tehran Branch, Islamic Azad University, Tehran, Iran
1 shared publication
Latest Publications
- 3 December 2022
- Published by Springer Nature in Asian Journal of Civil Engineering
- Vol. 24 (3) , 869-883
Predict a model of the reliability engineering approach to estimating, risk management, and cost predicting for private residential projects in Iran
- 3 December 2022
- Published by Springer Nature in Asian Journal of Civil Engineering
- Vol. 24 (3) , 869-883
Predict a model of the reliability engineering approach to estimating, risk management, and cost predicting for private residential projects in Iran
- 15 November 2022
- Published by Springer Nature in Iranian Journal of Science and Technology, Transactions of Civil Engineering
- Vol. 47 (3) , 1871-1891
Assessing the Effect of Building Information Modeling System (BIM) Capabilities on Lean Construction Performance in Construction Projects Using Hybrid Fuzzy Multi-criteria Decision-Making Methods
- 15 November 2022
- Published by Springer Nature in Iranian Journal of Science and Technology, Transactions of Civil Engineering
- Vol. 47 (3) , 1871-1891
Assessing the Effect of Building Information Modeling System (BIM) Capabilities on Lean Construction Performance in Construction Projects Using Hybrid Fuzzy Multi-criteria Decision-Making Methods
- Open Access
- 20 September 2021
- Published by MDPI AG in Infrastructures
- Vol. 6 (9) , 135
Delays in the Road Construction Projects from Risk Management Perspective
Delays in the execution stage of road construction projects are one of the significant challenges. The incapability of finishing projects according to schedule has attracted many researchers’ attention to this issue. This study has been formed to investigate delays in road construction projects from a risk management perspective. In this study, risks have been identified by structured interviews with experts. Qualitative risk analysis by a survey of experts and quantitative risk analysis by analytical hierarchy process (AHP) technique have been performed. Research results show that financial and credit problems, lands’ funding, management problems, technical problems, and natural disasters have the highest risk among the main criteria. Among the subcriteria of the risk, incomplete funding with a weight of 0.188, gardens and land price with 0.114 are the most critical risk, and ground operations with 0.017, asphalt problems with 0.009, and accident insurance with a weight of 0.006 are the least essential risk. In the following, critical criteria analysis has been performed, and solutions to reduce or eliminate these delays in road construction projects are presented.
- 20 September 2021
- Published by MDPI AG in Infrastructures
- Vol. 6 (9) , 135
Open AccessDelays in the Road Construction Projects from Risk Management Perspective
Delays in the execution stage of road construction projects are one of the significant challenges. The incapability of finishing projects according to schedule has attracted many researchers’ attention to this issue. This study has been formed to investigate delays in road construction projects from a risk management perspective. In this study, risks have been identified by structured interviews with experts. Qualitative risk analysis by a survey of experts and quantitative risk analysis by analytical hierarchy process (AHP) technique have been performed. Research results show that financial and credit problems, lands’ funding, management problems, technical problems, and natural disasters have the highest risk among the main criteria. Among the subcriteria of the risk, incomplete funding with a weight of 0.188, gardens and land price with 0.114 are the most critical risk, and ground operations with 0.017, asphalt problems with 0.009, and accident insurance with a weight of 0.006 are the least essential risk. In the following, critical criteria analysis has been performed, and solutions to reduce or eliminate these delays in road construction projects are presented.