Ebrahim Safa
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Ebrahim Safa has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Javad Majrouhi Sardroud
Associate Professor, Department of Civil Engineering, Central Tehran Branch, Islamic Azad University, Tehran, Iran
1 shared publication - Naser Mansour Sharifloo
Ayatollah Hashemi Complex, Department of Civil and Construction Engineering, Central Tehran Branch, Islamic Azad University, Tehran 1469669191, Iran
1 shared publication - Reza Mohajeri Borje Ghaleh
Ayatollah Hashemi Complex, Department of Civil and Construction Engineering, Central Tehran Branch, Islamic Azad University, Tehran 1469669191, Iran
1 shared publication - Towhid Pourrostam
Department of Civil Engineering, Central Tehran Branch, Islamic Azad University, Tehran, Iran
1 shared publication
Latest Publications
- Open Access
- 20 September 2021
- Published by MDPI AG in Infrastructures
- Vol. 6 (9) , 135
Delays in the Road Construction Projects from Risk Management Perspective
Delays in the execution stage of road construction projects are one of the significant challenges. The incapability of finishing projects according to schedule has attracted many researchers’ attention to this issue. This study has been formed to investigate delays in road construction projects from a risk management perspective. In this study, risks have been identified by structured interviews with experts. Qualitative risk analysis by a survey of experts and quantitative risk analysis by analytical hierarchy process (AHP) technique have been performed. Research results show that financial and credit problems, lands’ funding, management problems, technical problems, and natural disasters have the highest risk among the main criteria. Among the subcriteria of the risk, incomplete funding with a weight of 0.188, gardens and land price with 0.114 are the most critical risk, and ground operations with 0.017, asphalt problems with 0.009, and accident insurance with a weight of 0.006 are the least essential risk. In the following, critical criteria analysis has been performed, and solutions to reduce or eliminate these delays in road construction projects are presented.
- 20 September 2021
- Published by MDPI AG in Infrastructures
- Vol. 6 (9) , 135
Open AccessDelays in the Road Construction Projects from Risk Management Perspective
Delays in the execution stage of road construction projects are one of the significant challenges. The incapability of finishing projects according to schedule has attracted many researchers’ attention to this issue. This study has been formed to investigate delays in road construction projects from a risk management perspective. In this study, risks have been identified by structured interviews with experts. Qualitative risk analysis by a survey of experts and quantitative risk analysis by analytical hierarchy process (AHP) technique have been performed. Research results show that financial and credit problems, lands’ funding, management problems, technical problems, and natural disasters have the highest risk among the main criteria. Among the subcriteria of the risk, incomplete funding with a weight of 0.188, gardens and land price with 0.114 are the most critical risk, and ground operations with 0.017, asphalt problems with 0.009, and accident insurance with a weight of 0.006 are the least essential risk. In the following, critical criteria analysis has been performed, and solutions to reduce or eliminate these delays in road construction projects are presented.