Nursultan Baltabekov
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Nursultan Baltabekov has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Shyngys Zharassov
L.N. Gumilyov Eurasian National University
2 shared publications - Aleksej Aniskin
Department of Civil Engineering, University North, 42000 Varaždin, Croatia
1 shared publication - Ramil Timirkhanov
Department of Civil Engineering, L.N. Gumilyov Eurasian National University, 010008, Satpayev str., 2, Nur-Sultan, Kazakhstan
1 shared publication - Timur Zhussupov
Department of Civil Engineering, L.N. Gumilyov Eurasian National University, Astana 010008, Kazakhstan
1 shared publication - Yelbek Utepov
Department of Civil Engineering, L.N. Gumilyov Eurasian National University, Astana 010008, Kazakhstan
1 shared publication
Latest Publications
- Open Access
- 1 September 2022
- Published by Technobius in Technobius
- Vol. 2 (3) , 0021
Computer-aided calculation of the volume of soil masses using Civil 3D
Accuracy and automation of processes in all areas of human activity play a significant role, so new technologies are increasingly replacing human labor. In all this variety of IT solutions, the logic is more and more rarely traced in the absence of calculation methodology with a combination of necessary tools. This article describes one way of calculating the volume of soil masses using Civil 3D software. As a result of comparison of traditional and automated methods of calculation of volume of earth masses, the essential difference both in total values, and in the time spent for calculations has been revealed. A parallel between surplus volumes and freight transport logistics was drawn. The described method of calculating the volume of soil masses makes it possible to visually estimate the work front, select a suitable method of excavation works, develop production organization, take into account the need for soil removal and filling, determine the cost and duration of excavation works.
- 1 September 2022
- Published by Technobius in Technobius
- Vol. 2 (3) , 0021
Open AccessComputer-aided calculation of the volume of soil masses using Civil 3D
Accuracy and automation of processes in all areas of human activity play a significant role, so new technologies are increasingly replacing human labor. In all this variety of IT solutions, the logic is more and more rarely traced in the absence of calculation methodology with a combination of necessary tools. This article describes one way of calculating the volume of soil masses using Civil 3D software. As a result of comparison of traditional and automated methods of calculation of volume of earth masses, the essential difference both in total values, and in the time spent for calculations has been revealed. A parallel between surplus volumes and freight transport logistics was drawn. The described method of calculating the volume of soil masses makes it possible to visually estimate the work front, select a suitable method of excavation works, develop production organization, take into account the need for soil removal and filling, determine the cost and duration of excavation works.
- Open Access
- 30 September 2021
- Published by Technobius in Technobius
- Vol. 1 (3) , 0004
BIM for construction clash detection process after design stage: a case study of high residential complex in Nur-Sultan city
The construction industry is one of the most unpredictable and human-dependent sectors of production. This is due to the large flow of information during construction, which requires clear organizational activities. Traditionally established methods of communication on construction sites require modernization. That is why the concept for practitioners "Building Description System and Construction Product Modeling" was developed in 1970. The building society supported this concept and called it "Building Information Modeling" - BIM. The new wave of digital design required a strong material and technical base, the analysis of existing documentation and the creation of design tools began. The authors of the article use the highly specialized NavisWorks software to analyze possible losses as a result of combining the existing design documentation into BIM models on the example of one of the Nur-Sultan projects. The residential complex located in Nur-Sultan was chosen as the object under study. The residential apartment building was chosen because of the scale of the project and its full implementation in the BIM system. The article makes a comparative analysis on finding the intersections on the principle of combinatorics. The section of structural and space-planning solutions is checked for intersections with the sections of heating and ventilation, water supply and sewerage, then the logic is repeated. Exceptional combinations are selected to check for conflicts (collisions).
- 30 September 2021
- Published by Technobius in Technobius
- Vol. 1 (3) , 0004
Open AccessBIM for construction clash detection process after design stage: a case study of high residential complex in Nur-Sultan city
The construction industry is one of the most unpredictable and human-dependent sectors of production. This is due to the large flow of information during construction, which requires clear organizational activities. Traditionally established methods of communication on construction sites require modernization. That is why the concept for practitioners "Building Description System and Construction Product Modeling" was developed in 1970. The building society supported this concept and called it "Building Information Modeling" - BIM. The new wave of digital design required a strong material and technical base, the analysis of existing documentation and the creation of design tools began. The authors of the article use the highly specialized NavisWorks software to analyze possible losses as a result of combining the existing design documentation into BIM models on the example of one of the Nur-Sultan projects. The residential complex located in Nur-Sultan was chosen as the object under study. The residential apartment building was chosen because of the scale of the project and its full implementation in the BIM system. The article makes a comparative analysis on finding the intersections on the principle of combinatorics. The section of structural and space-planning solutions is checked for intersections with the sections of heating and ventilation, water supply and sewerage, then the logic is repeated. Exceptional combinations are selected to check for conflicts (collisions).