YSYuanwei Sun

Yuanwei Sun

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Yuanwei Sun has a total of 28 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Improved Surrounding Rock Classification Method for the Middle Rock Pillar of a Small Clear-Distance Tunnel

    by Jianxiu Wang, Ansheng Cao, Zhao Wu, Xuezeng Liu, Zonghai Li, Lihua Lin, Xiaotian Liu, Huboqiang Li, Yuanwei Sun

    In tunnel design and construction, proper and accurate classification of rock surrounding tunnels is needed to ensure tunnel construction safety, guarantee construction quality, and reduce project costs. With rapid urbanization, numerous small clear-distance tunnels have been constructed in dense urban road networks. Compared with ordinarily separated tunnels, the construction scale and difficulty of small clear-distance tunnels are greater, and the requirements for the classification of rock surrounding tunnels are accordingly higher. A small clear-distance tunnel in an urban super large and complex underground interchange hub of the Xiamen Haicang Evacuation Channel was selected as the background, and the classification method of the middle rock pillar in a small clear-distance tunnel is presented based on the general classification standard of surrounding rocks. Based on the geometric, physical, and mechanical factors of the middle rock pillar, six indices affecting the stability and quality of the middle rock pillar were selected, and the classification index system of the middle rock pillar was established from the two dimensions of the basic and auxiliary indices. The basic and auxiliary indices were scored using the scoring method, and the different grades of the middle rock pillar were divided according to different scores. The middle rock pillar classification standard was applied to the quality assessment of the middle rock pillar, which provided a basis for the on-site assessment of the quality of the middle rock pillar and proved the accuracy and superiority of the improved classification standard. The newly established classification standard can provide a reference for selecting the correct construction method and supporting structure type for small clear-distance tunnels.


  • Open Access

    Three-Dimensional Stability Analysis of Ridge Slope Using Strength Reduction Method Based on Unified Strength Criterion

    by Jianxiu Wang, Pengfei Liu, Pengfei Si, Huboqiang Li, Fan Wu, Yuxin Su, Yanxia Long, Ansheng Cao, Yuanwei Sun, Qianyuan Zhang

    Ridge slopes often occur in highway or railway engineering. The initial stress distribution of a ridge slope is important for the original slope and an excavation slope. In this paper, a wire-frame model of ridge slope was established. Numerical simulations on the 3D stability analysis were performed using the strength reduction method based on unified strength theory. The influences of ridgeline dip angle α, flank slope angle β, and slope height H on the deformation and failure mode of ridgeline slopes were analyzed. When α was small, cracking failure easily occurred at the front edge of the ridge slope and the area near the ridge line. When α was large, shear failure was prone to occur at the trailing edge of the ridge slope. Under the same reduction coefficient, the larger the flank slope angle β, the larger the slope displacement of the ridge. The plastic zone gradually concentrated near the ridge. When H was small, the displacement mainly occurred at the trailing edge of the slope, and the slopes were generally prone to cracking damage at the trailing edge. The front edge of the slope experienced a large displacement when the height of the ridge slope increased. The bottom of the flank slope was also displaced, and a plastic zone was observed at the foot of the slope. When the excavation slope ratio of the ridge slope was small, the plastic zone was mainly located on the side slope. When the excavation rate increased, the plastic zone appeared on the excavation slope surface, and its stability decreased significantly.


  • Open Access

    Mechanism of Detecting the Construction Quality of a Diaphragm Wall by an Infrared Thermal Field and Engineering Application

    by Jianxiu Wang, Pengfei Liu, Jian Hu, Weiqiang Pan, Yanxia Long, Ansheng Cao, Huboqiang Li, Yuanwei Sun

    During underground space exploitation in the urbanization process, numerous foundation pits were constructed where a diaphragm wall was often used as a retaining structure and waterproof curtain. Due to complicated engineering geological conditions or improper construction, diaphragm walls and wall joints often exhibit quality defects. Groundwater leaked from these quality defects to foundation pits during excavation, endangering the safety of the pit and surrounding facilities. The current leakage identification of the underground retaining structure was performed by artificial visual detection, which cannot satisfy the engineering requirement. The temperature field in the leakage area of the diaphragm wall was different from other areas. The leakage wall imaging system using a thermal imager was efficient in visualizing leaking, which was not visible to the naked eye. In this study, infrared thermal imaging technology was introduced in potential leakage detection for the diaphragm wall of a foundation pit. The infrared radiation characteristics of the diaphragm wall leakage and the potential leakage parts were studied through laboratory simulation tests and on-site detection methods. The maximum temperature appeared at the water outlet and the surface of the defect with hidden defect, and the temperature field was symmetrically distributed along the cross-section direction. In the potential leakage area, the temperature difference at the penetration point was 23.4 °C when the initial water pressure was 10 kPa. The temperature difference at the penetration point was 21.8 °C when the initial water pressure was 30 kPa. In the field test, the maximum temperature difference between the leakage area and the surrounding wall was 4.5 °C. The study can provide a reference for similar engineering.


  • Open Access

    Conceptual Model, Experiment and Numerical Simulation of Diaphragm Wall Leakage Detection Using Distributed Optical Fiber

    by Jianxiu Wang, Pengfei Liu, Rui Xue, Weiqiang Pan, Ansheng Cao, Yanxia Long, Huboqiang Li, Yuanwei Sun

    Leakage in the diaphragm wall is difficult to detect in deep foundation pits. In this study, the conceptual model of active and passive thermal leak detection methods was proposed according to the occurrence of temperature field anomalies caused by seepage. Experiments were performed using a heating system and an optical fiber temperature measurement system to verify the thermal leakage detection systems. Numerical simulations were performed to understand the mechanism of the detecting method. Results indicated that the optical cable could detect the low-temperature anomaly in the active temperature field leak detection. The arrangement method of the leakage detection system was also presented in actual engineering.


  • Open Access

    Numerical Stability Analysis of Large Section Tunnels Using the Double-Side Heading Method: A Case Study of Xiamen Haicang Evacuate-Channel

    by Jianxiu Wang, Ansheng Cao, Zhao Wu, Lihua Lin, Zonghai Li, Xiaotian Liu, Huboqiang Li, Yanxia Long, Yuanwei Sun

    Large section tunnels have huge excavation spans, complex excavation procedures, mutual influence among various procedures, multiple disturbances of the surrounding rock, and discontinuous connection among linings under different procedures, which bring great difficulties to their construction. The Caijianwei Mountain No. 2 tunnel of the Xiamen Haicang Evacuate-channel project in China belongs to a super large section tunnel. The tunnel’s maximum excavation section span reaches 30.52 m, and the excavation area reaches 421.73 m2. Its excavation sequence, the timing of the second primary lining support, temporary support disassembly, and secondary lining support of the double-side heading method were analyzed using numerical methods. The excavation sequence of the double side-heading method from the right pilot tunnel to the left pilot tunnel and then to the middle pilot tunnel can avoid a large horizontal displacement at the arch waist and control the deformation of the lining. The excavation sequence from the middle pilot tunnel to the two side pilot tunnels was conducive to the bearing performance of the concrete at the arch crown. The excavation sequence from the two side pilot tunnels to the middle pilot tunnel can better protect the concrete safety at the arch waist. The timing of the second primary lining support, temporary support removal, and secondary lining support have different effects on the deformation and stress of the surrounding rock and support structures. In the construction process, the timing of the second primary lining support, temporary support disassembly, and secondary lining support should be determined according to the actual deformation and stress of the site section. The research results can provide a reference for the construction design of the double-side heading method for large section tunnels.


  • Open Access

    Mechanical Behavior and Excavation Optimization of a Small Clear-Distance Tunnel in an Urban Super Large and Complex Underground Interchange Hub

    by Jianxiu Wang, Ansheng Cao, Zonghai Li, Zhao Wu, Lihua Lin, Xiaotian Liu, Huboqiang Li, Yuanwei Sun

    Close excavation section spacing, the mutual influence and interpenetration of various processes, and the multiple disturbances of the middle rock pillar in a small clear-distance tunnel pose great difficulty to construction. This study adopted the small clear-distance tunnel of Xiamen Haicang Evacuate Channel as the research object. The tunnel belonged to a small clear-distance tunnel in an urban super large and complex underground interchange hub where complex adjacent small clear-distance tunnels were adopted. ABAQUS was used to analyze the influence of different excavation schemes, lithological grades, and footage lengths for tunnel stability. The deformation and stress characteristics of the tunnel’s surrounding rock and lining structure in different excavation schemes (full section method, bench method, center diaphragm (CD) method, and double wall heading method), lithological grades (III, IV and V), and footage lengths (3 m, 4 m and 5 m) were introduced. The results showed that the double wall heading method could effectively control the horizontal displacement of the hance, and the overall stress state of the lining in the CD and double wall heading methods were reasonable. The vertical displacement of the surface and vault was positively correlated with the elastic modulus of the rock mass. When no temporary support was present in the grade V rock mass, the area from the hance to the arch foot was prone to large deformation. Reducing the footage was beneficial to controlling the deformation of the vault and hance. This study can provide a reference for the on-site construction of small clear-distance tunnels.


  • Open Access

    Numerical Simulation on the Response of Adjacent Underground Pipelines to Super Shallow Buried Large Span Double-Arch Tunnel Excavation

    by Jianxiu Wang, Ansheng Cao, Zhao Wu, Zhipeng Sun, Xiao Lin, Lei Sun, Xiaotian Liu, Huboqiang Li, Yuanwei Sun

    The excavation of a shallow buried tunnel may cause stress redistribution in surrounding rock, and cause deformation, damage, and even destruction of adjacent underground pipelines. The land part of the Haicang undersea tunnel in Xiamen of China was a super shallow buried large span double-arch tunnel. Its construction was restricted by both underground excavation safe and adjacent pipeline protection. Multiple groups of working conditions were designed considering the relative position of pipe and tunnel, pipeline and tunnel construction parameters. Numerical simulation was used to study the influence of pipeline horizontal distance, buried depth, pipeline diameter, pipeline wall thickness, pipeline shape, pipeline material and excavation method on the response of adjacent underground pipelines. The results show that the relative position of pipe and tunnel, and the construction method of the double-arch tunnel have a great influence on pipeline deformation. Pipeline material, pipeline diameter and excavation method have a great influence on pipeline stress. The construction method was the key factor affecting the stress and deformation of the pipeline. The three-step reserved core soil method can effectively control the stress and deformation of underground pipelines. The research results can provide a reference for similar projects.


  • Open Access

    Numerical Simulation of Ultra-Shallow Buried Large-Span Double-Arch Tunnel Excavated under an Expressway

    by Jianxiu Wang, Ansheng Cao, Zhao Wu, Zhipeng Sun, Xiao Lin, Lei Sun, Xiaotian Liu, Huboqiang Li, Yuanwei Sun

    The temporal and spatial effects of a complicated excavation process are vital for an ultra-shallow buried large-span double-arch tunnel excavated under an expressway in service. Numerical simulations are urgent and necessary to understand the effect of the total construction process. Taking Xiamen Haicang tunnel as a research object, the total excavation process of three pilot tunnels and the three-bench reserved core soil method of an ultra-shallow buried large-span double-arch tunnel with a fault fracture zone under an expressway was simulated using software FLAC3D. The deformation of the surface, surrounding rock, underground pipelines, tunnel support structure and partition wall of the three pilot tunnels and the main tunnel was analyzed, and the dangerous areas and time nodes were obtained. When the tunnel was excavated to the fault fracture zone, the deformation of the surface and surrounding rock increased significantly. The rock and soil within 20 m behind the excavation surface of the pilot tunnel were greatly disturbed by the excavation. During the excavation of the main tunnel, the horizontal displacement of the middle partition wall moved slightly towards the main tunnel excavated first. The research results can provide a reference for the construction design of double-arch tunnels.


  • Open Access

    Dynamic Risk Assessment of Ultra-Shallow-Buried and Large-Span Double-Arch Tunnel Construction

    by Jianxiu Wang, Ansheng Cao, Zhao Wu, Zhipeng Sun, Xiao Lin, Lei Sun, Wuji Liu, Xiaotian Liu, Huboqiang Li, Yuanwei Sun, et al.

    Ultra-shallow-buried and large-span double-arch tunnels face complex risks during construction. The risk sources are hidden, complicated, and diverse. The dynamic risk assessment problem cannot be solved satisfactorily by using the static method as an insufficient amount of research has been conducted. The land part of the Xiamen Haicang double-arch tunnel was selected as the background for the dynamic risk assessment of ultra-shallow-buried and large-span double-arch tunnel construction. The construction process was divided into five stages: pre-construction preparation; ground and surrounding rock reinforcement; pilot tunnel excavation; and the single-and the double-tunnel excavations of the main tunnel. Through consultation with tunnel experts, six first-level and thirty second-level risk evaluation indexes were proposed. The benchmark weight of the dynamic risk assessment index was determined by using the analytic hierarchy process. The weight of the risk evaluation index was revised according to the monitoring data and the construction stage. The fuzzy evaluation matrix of the construction risk membership degree was obtained by using the fuzzy comprehensive assessment method, and the calculation results were analyzed using the subsection assignment method. Control measures were suggested according to the risk assessment results. The risk assessment result of the double tunnel excavation stage of the main tunnel was level II, and the risk level was the highest among the five construction stages. The risk assessment result of the ground and surrounding rock reinforcement stage was level IV, and the risk level was the lowest. The dynamic construction safety risk assessment based on the fuzzy comprehensive assessment method is more timely, accurate, and reasonable than the traditional assessment method. The method can be adopted in similar engineering projects.


  • Open Access

    Numerical Simulation of Rock Mass Structure Effect on Tunnel Smooth Blasting Quality: A Case Study

    by Jianxiu Wang, Ansheng Cao, Jiaxing Liu, Huanran Wang, Xiaotian Liu, Huboqiang Li, Yuanwei Sun, Yanxia Long, Fan Wu

    Taking the Zigaojian tunnel, Hangzhou–Huangshan high-speed railway, China, as background, the rock mass structure effect on smooth blasting quality was studied. Four rock mass structures were determined on the basis of the information collected on the tunnel site. Smooth blasting finite element models were established using LS-DYNA. The accuracy of the numerical calculation model was verified by comparing the overbreak and underbreak between the numerical simulation and monitoring. Orthogonal numerical test was used to study the rock mass structure effect through single factor and main effect analysis methods. With the decrease in rock mass integrity, the smooth blasting overbreak of tunnels with massive integrity structure, massive structure, layered structure, and cataclastic structure increased. For massive integrity structure and cataclastic structure, the peripheral hole spacing should be emphatically considered. Meanwhile, in massive structure and layered structure, the included angle and spacing of structural planes had a great influence on the smooth blasting quality. The research results could provide a reference to improve the quality of similar tunnel smooth blasting.