Numerical Stability Analysis of Large Section Tunnels Using the Double-Side Heading Method: A Case Study of Xiamen Haicang Evacuate-Channel
Open Access
- 28 December 2022
- journal article
- research article
- Published by MDPI AG in Applied Sciences
- Vol. 13 (1) , 406
Abstract
Large section tunnels have huge excavation spans, complex excavation procedures, mutual influence among various procedures, multiple disturbances of the surrounding rock, and discontinuous connection among linings under different procedures, which bring great difficulties to their construction. The Caijianwei Mountain No. 2 tunnel of the Xiamen Haicang Evacuate-channel project in China belongs to a super large section tunnel. The tunnel’s maximum excavation section span reaches 30.52 m, and the excavation area reaches 421.73 m2. Its excavation sequence, the timing of the second primary lining support, temporary support disassembly, and secondary lining support of the double-side heading method were analyzed using numerical methods. The excavation sequence of the double side-heading method from the right pilot tunnel to the left pilot tunnel and then to the middle pilot tunnel can avoid a large horizontal displacement at the arch waist and control the deformation of the lining. The excavation sequence from the middle pilot tunnel to the two side pilot tunnels was conducive to the bearing performance of the concrete at the arch crown. The excavation sequence from the two side pilot tunnels to the middle pilot tunnel can better protect the concrete safety at the arch waist. The timing of the second primary lining support, temporary support removal, and secondary lining support have different effects on the deformation and stress of the surrounding rock and support structures. In the construction process, the timing of the second primary lining support, temporary support disassembly, and secondary lining support should be determined according to the actual deformation and stress of the site section. The research results can provide a reference for the construction design of the double-side heading method for large section tunnels.Keywords
Funding Information
- Shanghai Municipal Science and Technology Project (18DZ1201301, 19DZ1200900, XM2017-TZ0151, XM2017-TZ0117, CJ202101, 2021SHZDZX0100, KLLSMP202101, KLLSMP202201, SURT01YJ1S10002, CR15CG-XLDYH7-2019-GC01)
- Xiamen Road and Bridge Group (18DZ1201301, 19DZ1200900, XM2017-TZ0151, XM2017-TZ0117, CJ202101, 2021SHZDZX0100, KLLSMP202101, KLLSMP202201, SURT01YJ1S10002, CR15CG-XLDYH7-2019-GC01)
- project of Key Laboratory of Impact and Safety Engineering (Ningbo University), Ministry of Education (18DZ1201301, 19DZ1200900, XM2017-TZ0151, XM2017-TZ0117, CJ202101, 2021SHZDZX0100, KLLSMP202101, KLLSMP202201, SURT01YJ1S10002, CR15CG-XLDYH7-2019-GC01)
- Shanghai Municipal Science and Technology Major Project (18DZ1201301, 19DZ1200900, XM2017-TZ0151, XM2017-TZ0117, CJ202101, 2021SHZDZX0100, KLLSMP202101, KLLSMP202201, SURT01YJ1S10002, CR15CG-XLDYH7-2019-GC01)
- Fundamental Research Funds for the Central Universities (18DZ1201301, 19DZ1200900, XM2017-TZ0151, XM2017-TZ0117, CJ202101, 2021SHZDZX0100, KLLSMP202101, KLLSMP202201, SURT01YJ1S10002, CR15CG-XLDYH7-2019-GC01)
- Key Laboratory of Land Subsidence Monitoring and Prevention, Ministry of Natural Resources of the People’s Republic of China (18DZ1201301, 19DZ1200900, XM2017-TZ0151, XM2017-TZ0117, CJ202101, 2021SHZDZX0100, KLLSMP202101, KLLSMP202201, SURT01YJ1S10002, CR15CG-XLDYH7-2019-GC01)
- Suzhou Rail Transit Line 1 Co., Ltd. (18DZ1201301, 19DZ1200900, XM2017-TZ0151, XM2017-TZ0117, CJ202101, 2021SHZDZX0100, KLLSMP202101, KLLSMP202201, SURT01YJ1S10002, CR15CG-XLDYH7-2019-GC01)
- China Railway 15 Bureau Group Co., Ltd. (18DZ1201301, 19DZ1200900, XM2017-TZ0151, XM2017-TZ0117, CJ202101, 2021SHZDZX0100, KLLSMP202101, KLLSMP202201, SURT01YJ1S10002, CR15CG-XLDYH7-2019-GC01)
This publication has 16 references indexed in Scilit:
- Study on mechanism of macro failure and micro fracture of local nearly horizontal stratum in super-large section and deep buried tunnelGeomechanics and Engineering, 2016
- Numerical Analysis of Construction Method in Shallow-Buried Large-Section Loess TunnelApplied Mechanics and Materials, 2014
- The Monitoring and Analysis of Surface Subsidence of Soft Soil Rock Large Section of Subway Tunnel Shield ConstructionAdvanced Materials Research, 2013
- Instability Mechanism of Surrounding Rock for Super-Large Cross Section at High-Speed Railway Tunnel PortalApplied Mechanics and Materials, 2013
- Numerical Simulation Analysis and Engineering Applications on the Double-Side-Wall Heading Step Bench Excavation of Large-Cross Section and Shallow TunnelAdvanced Materials Research, 2012
- Design and Application of Secondary High-Capacity Support to Large-Section Tunnel Excavated in High-Stress Condition with Fractured Surrounding RockApplied Mechanics and Materials, 2012
- The Study on a New Loads Calculation Method of Multi-Arch and Extra Large Cross Section TunnelsApplied Mechanics and Materials, 2011
- Study on Optimization of Core Pillar in Large-Span Tunnel Excavated with Double-Side Heading MethodAdvanced Materials Research, 2011
- Influence analysis of core rock construction in super large section and span tunnel2010
- Large rectangular cross-section tunneling by the multi-micro shield tunneling (MMST) methodTunnelling and Underground Space Technology, 2005