LWLuluk Wulandari

Luluk Wulandari

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Luluk Wulandari has a total of 6 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    UTILIZATION OF EDUCATION MANAGEMENT INFORMATION SYSTEM (EMIS) AS AN ANTI-CORRUPTION EFFORT IN MADRASAS

    by Alfita Choirun Amalia, Luluk Wulandari, Evi Fatimatur Rusydiyah

    This study aims to determine the use of the Education Management Information System (EMIS) within the Madrasah to implement anti-corruption education. This research belongs to the type of descriptive qualitative research by describing the facts or findings in the field. The data collection technique is done through interviews, observation methods, and documentation. The instrument used in this research is the instrument using a questionnaire. The results show that the use of the education management system (EMIS) as the implementation of anti-corruption education is quite effective because the distribution of Education Operational Costs (BOP) to madrasas no longer has to pass through various parties but is directly channeled through school accounts, so there are no more deductions in the distribution process. The use of EMIS is also inseparable from internal and external constraints. From the inner aspect, it includes human resources who do not understand EMIS operations. Meanwhile, external factors include the EMIS central server, which requires further improvement to comfort and convenience for madrasas.

  • Open Access

    P PEMODELAN ARUS LALU LINTAS DAN WAKTU TUNGGU TOTAL OPTIMAL DI PERSIMPANGAN JL. JEMUR ANDAYANI – AHMAD YANI SEBAGAI UPAYA MENGURAI KEMACETAN

    by Yuniar Farida, Aris Fanani, Ida Purwanti, Luluk Wulandari, Nanida Jenahara Zaen

    One crossroad of ​​Surabaya whose high level of congestion is the crossing of Jemur Andayani – Ahmad Yani Street. It needs to Improve traffic management, geometric, and signal time to obtain optimal traffic performance. The purpose of this study is to make a model of traffic flow and determine the optimal total waiting time at the crossing of Jemur Andayani – Ahmad Yani using Compatible Graph. Compatible graphs are two sets where vertices indicate objects to be arranged and edges indicate compatible pairs of objects. Compatible traffic flow is two traffic flows which if both of them run simultaneously can run safely and not collide. The results of the optimal waiting time calculation using a compatible graph assuming the left turn following the lamp is 75 seconds. While the optimal total waiting time by assuming the left turn not following the lights is 60 seconds. The optimal total waiting time is smaller than the actual total waiting time currently applied at Frontage Ahmad Yani street, which is 170 seconds by assuming turn left following the lights.


  • Open Access

    PEMODELAN ARUS LALU LINTAS DAN WAKTU TUNGGU TOTAL OPTIMAL DI PERSIMPANGAN JL. JEMUR ANDAYANI AHMAD YANI SEBAGAI UPAYA MENGURAI KEMACETAN

    by Yuniar Farida, Aris Fanani, Ida Purwanti, Luluk Wulandari, Nanida Jenahara Zaen

    One crossroad of ​​Surabaya whose high level of congestion is the crossing of Jemur Andayani – Ahmad Yani Street. It needs to Improve traffic management, geometric, and signal time to obtain optimal traffic performance. The purpose of this study is to make a model of traffic flow and determine the optimal total waiting time at the crossing of Jemur Andayani – Ahmad Yani using Compatible Graph. Compatible graphs are two sets where vertices indicate objects to be arranged and edges indicate compatible pairs of objects. Compatible traffic flow is two traffic flows which if both of them run simultaneously can run safely and not collide. The results of the optimal waiting time calculation using a compatible graph assuming the left turn following the lamp is 75 seconds. While the optimal total waiting time by assuming the left turn not following the lights is 60 seconds. The optimal total waiting time is smaller than the actual total waiting time currently applied at Frontage Ahmad Yani street, which is 170 seconds by assuming turn left following the lights.