Ida Purwanti
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Ida Purwanti has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Aris Fanani
UIN Sunan Ampel Surabaya
2 shared publications - Luluk Wulandari
UIN Sunan Ampel Surabaya
2 shared publications - Nanida Jenahara Zaen
UIN Sunan Ampel Surabaya
2 shared publications - Yuniar Farida
UIN Sunan Ampel Surabaya
2 shared publications
Latest Publications
- Open Access
- 10 October 2020
- Published by Universitas Pattimura in BAREKENG: Jurnal Ilmu Matematika dan Terapan
- Vol. 14 (3) , 389-398
P PEMODELAN ARUS LALU LINTAS DAN WAKTU TUNGGU TOTAL OPTIMAL DI PERSIMPANGAN JL. JEMUR ANDAYANI – AHMAD YANI SEBAGAI UPAYA MENGURAI KEMACETAN
One crossroad of Surabaya whose high level of congestion is the crossing of Jemur Andayani – Ahmad Yani Street. It needs to Improve traffic management, geometric, and signal time to obtain optimal traffic performance. The purpose of this study is to make a model of traffic flow and determine the optimal total waiting time at the crossing of Jemur Andayani – Ahmad Yani using Compatible Graph. Compatible graphs are two sets where vertices indicate objects to be arranged and edges indicate compatible pairs of objects. Compatible traffic flow is two traffic flows which if both of them run simultaneously can run safely and not collide. The results of the optimal waiting time calculation using a compatible graph assuming the left turn following the lamp is 75 seconds. While the optimal total waiting time by assuming the left turn not following the lights is 60 seconds. The optimal total waiting time is smaller than the actual total waiting time currently applied at Frontage Ahmad Yani street, which is 170 seconds by assuming turn left following the lights.
- 10 October 2020
- Published by Universitas Pattimura in BAREKENG: Jurnal Ilmu Matematika dan Terapan
- Vol. 14 (3) , 389-398
Open AccessP PEMODELAN ARUS LALU LINTAS DAN WAKTU TUNGGU TOTAL OPTIMAL DI PERSIMPANGAN JL. JEMUR ANDAYANI – AHMAD YANI SEBAGAI UPAYA MENGURAI KEMACETAN
One crossroad of Surabaya whose high level of congestion is the crossing of Jemur Andayani – Ahmad Yani Street. It needs to Improve traffic management, geometric, and signal time to obtain optimal traffic performance. The purpose of this study is to make a model of traffic flow and determine the optimal total waiting time at the crossing of Jemur Andayani – Ahmad Yani using Compatible Graph. Compatible graphs are two sets where vertices indicate objects to be arranged and edges indicate compatible pairs of objects. Compatible traffic flow is two traffic flows which if both of them run simultaneously can run safely and not collide. The results of the optimal waiting time calculation using a compatible graph assuming the left turn following the lamp is 75 seconds. While the optimal total waiting time by assuming the left turn not following the lights is 60 seconds. The optimal total waiting time is smaller than the actual total waiting time currently applied at Frontage Ahmad Yani street, which is 170 seconds by assuming turn left following the lights.
- Open Access
- 1 September 2020
- Published by Universitas Pattimura in BAREKENG: Jurnal Ilmu Matematika dan Terapan
- Vol. 14 (3) , 387-396
PEMODELAN ARUS LALU LINTAS DAN WAKTU TUNGGU TOTAL OPTIMAL DI PERSIMPANGAN JL. JEMUR ANDAYANI AHMAD YANI SEBAGAI UPAYA MENGURAI KEMACETAN
One crossroad of ​​Surabaya whose high level of congestion is the crossing of Jemur Andayani – Ahmad Yani Street. It needs to Improve traffic management, geometric, and signal time to obtain optimal traffic performance. The purpose of this study is to make a model of traffic flow and determine the optimal total waiting time at the crossing of Jemur Andayani – Ahmad Yani using Compatible Graph. Compatible graphs are two sets where vertices indicate objects to be arranged and edges indicate compatible pairs of objects. Compatible traffic flow is two traffic flows which if both of them run simultaneously can run safely and not collide. The results of the optimal waiting time calculation using a compatible graph assuming the left turn following the lamp is 75 seconds. While the optimal total waiting time by assuming the left turn not following the lights is 60 seconds. The optimal total waiting time is smaller than the actual total waiting time currently applied at Frontage Ahmad Yani street, which is 170 seconds by assuming turn left following the lights.
- 1 September 2020
- Published by Universitas Pattimura in BAREKENG: Jurnal Ilmu Matematika dan Terapan
- Vol. 14 (3) , 387-396
Open AccessPEMODELAN ARUS LALU LINTAS DAN WAKTU TUNGGU TOTAL OPTIMAL DI PERSIMPANGAN JL. JEMUR ANDAYANI AHMAD YANI SEBAGAI UPAYA MENGURAI KEMACETAN
One crossroad of ​​Surabaya whose high level of congestion is the crossing of Jemur Andayani – Ahmad Yani Street. It needs to Improve traffic management, geometric, and signal time to obtain optimal traffic performance. The purpose of this study is to make a model of traffic flow and determine the optimal total waiting time at the crossing of Jemur Andayani – Ahmad Yani using Compatible Graph. Compatible graphs are two sets where vertices indicate objects to be arranged and edges indicate compatible pairs of objects. Compatible traffic flow is two traffic flows which if both of them run simultaneously can run safely and not collide. The results of the optimal waiting time calculation using a compatible graph assuming the left turn following the lamp is 75 seconds. While the optimal total waiting time by assuming the left turn not following the lights is 60 seconds. The optimal total waiting time is smaller than the actual total waiting time currently applied at Frontage Ahmad Yani street, which is 170 seconds by assuming turn left following the lights.