    Predicting the Time Impact and Identifying the Practical Responses to Claim Causes in Building Projects

    by Sang Quang Van, Veerasak Likhitruangsilp, Photios G. Ioannou

    Construction claims are inevitable and usually result in negative impacts on the project performance, and especially the project delays. This study aims to predict the time impacts and identify the practical responses to claim causes in building projects. Firstly, potential claim causes were identified through an extensive literature review and verified by a group of nine claim experts. Face-to-face interviews were conducted with these experts to establish the causal relationships among the identified claim causes. These relationships were then used to structure a Bayesian Network (BN) model for predicting the time impacts of each claim cause. The BN model comprised 13 claim causes of which only one claim cause (i.e. change orders) was independent. Subsequently, the historical data on the claim causes were collected from 112 actual building projects via a structured questionnaire survey. The data were then encoded and used as input to the model. A real case study project was used to demonstrate the predictive capability of the model. The results showed that the BN model is capable of effectively predicting the time impact levels of the claim causes. Next, twelve claim experts were invited to identify response strategies for each claim cause. It was found that the five response strategies commonly adopted for addressing claim causes are the: acceptance, avoidance, mitigation, contingency plan/reserve, and transfer. The present study also identified practical response methods for dealing with such claim causes. This study contributes a practical approach for forecasting the potential time impacts of the claim causes and formulating practical responses, thereby enhancing the claim management practices in building projects.

  • Risk-Sensitive Competitive Bidding Model and Impact of Risk Aversion and Cost Uncertainty on Optimum Bid

    by Photios G. Ioannou

    A decision analysis model is presented that can be used by a contractor to determine the optimum lump-sum bid that maximizes expected utility for an upcoming job. Required inputs include the contractor’s utility curve, the distribution of the opponents’ low bid-to-cost ratio, and the distribution of the project cost. Closed-form expressions for expected utility are developed for an exponential utility curve and normally distributed project cost that can also be used as approximations for other models. Any appropriate bidding model can be used to estimate the probability to win. Important concepts introduced include the certain equivalent and the risk premium for a project profit lottery, corporate indifferent buying price (CIBP), and risk-adjusted cost (RAC). Parametric curves from the maximization of expected utility over a total of 21,462 combinations of the contractor’s risk tolerance and the standard deviation of project cost illustrate the considerable impact of risk aversion and cost uncertainty on the optimal bid-to-cost ratio, on the probability of losing money on the job, and on the certain equivalent and risk premium for profit. This sensitivity analysis shows that maximizing expected utility can result in an optimal bid-to-cost ratio that can be significantly different (smaller or larger) than the bid-to-cost ratio found by only maximizing expected profit and ignoring the significant impact of uncertainty in project cost σ . The presented procedure allows contractors to use any appropriate model for the probability of winning (such as those proposed by Friedman, Gates, Carr, or Ioannou), assess their risk tolerance and the standard deviation of project cost, and select an optimal bid price that maximizes their expected utility for profit.


  • A BIM-Enabled System for Evaluating Impacts of Construction Change Orders

    by Veerasak Likhitruangsilp, Tantri N. Handayani, Photios G. Ioannou, Nobuyoshi Yabuki

    Change orders lead to the modification of construction works, which has a direct impact on various aspects of construction projects, including scope, budget, and schedule. The traditional change order process involves the production and communication of a significant amount of information, usually in the form of paper-based documents that are mostly narrative and not well organized. It is therefore difficult for all project participants to understand the physical changes to the construction work and identify the information necessary for determining the resulting time and cost impacts. These challenges point to the need for an integrated decision support system that can assist project stakeholders to visualize the physical alterations, to manage the pertinent information, to perform quantity takeoff, and to assess the impacts of construction changes, all of which can be facilitated by building information modeling (BIM). This paper develops a BIM-based system that can be used to evaluate the impacts of construction change orders. The proposed system focuses on quantifying three major impacts of change orders in construction projects, namely, physical conditions, schedule, and budget. The system architecture and integration of several BIM-enabled tools, including Autodesk Revit, Dynamo, Microsoft Excel, and VBA are presented. Given a particular construction change order, the system automatically detects the altered building elements and evaluates the schedule and cost impacts of the proposed change. This system can assist all project participants in visualizing and quantifying the impacts of construction change. It can also enhance the accuracy of time-cost impact evaluations as well as facilitate the overall change management process.


  • Repetitive Scheduling Method: Requirements, Modeling, and Implementation

    by Photios G. Ioannou, I-Tung Yang

    Projects with repeating activities, such as multistory buildings and highways, present unique scheduling challenges. This paper presents the necessary requirements that scheduling systems should address to meet the needs and complexities of repetitive projects in practice. The repetitive scheduling method (RSM) provides a unified scheduling framework that applies to all types of repetitive projects. In RSM, projects are classified as discrete (vertical) or continuous (horizontal or linear) and then as uniform and nonuniform, depending on whether progress is measured using a counting scale or a dominant-attribute scale. RSM modeling elements include three types of activities (line, block, and bar) and 10 types of relationships (links) between activities. RP2, a computer program developed by the authors to validate the proposed scheduling approach, is used to develop the production diagrams and tabular reports of the target schedule for a complex of four-story apartment buildings for a low-income ho...


  • Mapping Work Process and Information Exchange of Construction Entities for BIM Implementation: Case Study of an Academic Institute

    by Veerasak Likhitruangsilp, Photios G. Ioannou, Sarawuth Leeladejkul

    Building Information Modeling (BIM) represents modern construction management concepts that can be integrated in every phase throughout the facility lifecycle. Not only can BIM enhance the performance and efficacy of the construction project delivery process, but it can also improve the quality of the delivered products and reduce various forms of project waste. The principal concept of BIM is the collaboration among all stakeholders in different phases of the facility lifecycle to manage relevant information efficiently. However, this data sharing concept is extremely challenging for the construction industry where the project delivery process is unstructured and fragmented. Thus, the primary step for implementing BIM in any construction entity is to assimilate current organizational conditions, especially its work processes and information exchange. This paper investigates the work process and information exchange in construction projects by focusing on the project owner. The Office of Physical Resources Management (OPRM) at Chulalongkorn University (Thailand), which is responsible for developing the university's construction projects, was chosen as a case study to illustrate an application of the proposed methodology. General information about the OPRM as it relates to facility design and construction was first gathered, including organizational structure, the stakeholders involved, their roles and responsibilities, and current information exchange. The phases of a construction project were defined by adapting from those in the OmniClass Construction Classification System (OCCS), which is used widely in the construction industry. The collected information was analyzed and organized to map important work processes and information exchanges among the stakeholders throughout the project lifecycle. Due to the complexity of workflows, the Business Process Model and Notation (BPMN) was adopted to illustrate and communicate the results. A key feature of the BMPN is the formal documentation of information exchange requirements among the stakeholders in terms of paper and electronic documents. The results of this formal mapping has proven instrumental in helping all parties, especially project owners, comprehend the project delivery process thoroughly so that the appropriate elements can be modified to support and accommodate the transition to BIM implementation.


  • Conceptual Framework of the Green Building Information Management System

    by Veerasak Likhitruangsilp, Wanida Putthividhya, Photios G. Ioannou

    This paper presents the conceptual framework by which we developed the Green Building Information Management System (GBIMS). GBIMS is a web-based client-server system designed to assist all project participants in accessing and retrieving information necessary for the planning and control of green building projects. Its schema includes two main components: project life cycle and information. The life cycle of a green building project was broken down into the three hierarchical levels of stages, processes, and activities using an adaptation of the OmniClass Construction Classification System. Important information concerning green building project management was compiled from the LEED rating system, including credits, project participants and their roles, certification documents, design and construction standards, and green materials. The design of GBIMS follows a three-tiered software architecture, which consists of three independent modules, namely, the user-interface module, the functional process logic module, and the data access and storage module. The relations among objects (entities) in GBIMS are illustrated through a class diagram. The GBIMS conceptual framework provides the foundation for the development of a comprehensive web-based green building project management system.


  • A Risk-Sensitive Markup Decision Model

    by Rita Awwad, Photios Ioannou

    Construction risk can be associated with different factors such as the size and complexity of the project, the experience of the contractor with similar type of work, unexpected weather conditions, unexpected ground conditions, or even unanticipated market changes. Failure to estimate the uncertainties that accompany a specific project often leads to a delayed project with cost overruns and compromised quality. Therefore, when bidding on a certain project, a contractor has to consider the possibility and the magnitude of construction risks involved, and then decide on its optimum markup accordingly. Cost uncertainty is not only an issue at the conceptual phase of a project but continues even into the construction phase. In addition to the uncertainty in the final project cost, the attitude of the contractor towards risk taking is of equal or even more importance in choosing the optimum markup and the resulting bid price for a project. This paper uses established principles of decision analysis and utility theory to develop a risk-sensitive bidding model that aims at determining the contractor's optimal markup value for a project given his risk attitude and his uncertainty about the final project cost. A sensitivity analysis is then conducted through a numerical example to illustrate the effect of risk aversion and cost variance on the optimum markup for the competitive low bid method.


  • Analysis of Risk-Response Measures for Tunneling Projects

    by Veerasak Likhitruangsilp, Photios G. Ioannou

    Tunnel construction involves complex projects that encompass various types of risk. To achieve project goals, contractors need to adopt appropriate risk management strategies from project inception to project completion. In this paper, we present and analyze the risk-response measures employed by tunneling contractors in Thailand and their major criteria for choosing such measures. Thirty-nine risk factors proposed by previous research as borne by tunneling contractors were compiled and verified by experienced tunneling engineers. Alternative risk-response measures for each risk factor employed by tunneling contractors were identified, including risk-retention, risk-reduction, risk-transfer, risk-avoidance, and contingency allowance. It was found that the most commonly used risk-response measures were risk-reduction, risk-retention, risk-transfer, and risk-avoidance, in that order. We also identified the major criteria that contractors consider when choosing the appropriate risk-response measures for each risk factor, such as cost, project delivery system, and project payment method. Tunneling contractors can use these results as a guideline for developing appropriate risk management plans for future projects.


  • Study of Less Than Average Bid Method

    by Rita E. Awwad, Photios G. Ioannou

    The low bid method is the most frequently used competitive bidding method in the construction industry. However, its main disadvantage is awarding projects to irresponsive extremely low bids which leads to disputes and claims between the owner and the contractor. To remedy this issue, some countries use the average bid method which awards the job to the contractor who submits the closest bid to the average of all submitted bids. A comparison between Friedman's low bid method and the average bid method was conducted by Ioannou and Leu (1993), and showed mat although the average bid method protects the owner against extremely low bids, it does not promote fierce competition as is the case in a low bid awarding system. Thus, they suggested another variation of the average bid method which is awarding the job to the contractor whose price is closest to but lower than the average of all submitted bids. This paper uses Monte Carlo simulation to model the less than average bidding method. It explores its merits relative to the other two bidding methods, and proves it to be a compromising middle ground between the low bid method and the regular average bid method.

  • Risk Allocation in Standard Forms of General Conditions for Tunneling Contracts

    by Veerasak Likhitruangsilp, Photios G. Ioannou

    A construction contract is the primary tool for allocating risk among the contracting parties in the project, especially the owner and the contractor. Presently, many tunneling contracts are prepared by adopting or modifying standard forms of general conditions, which were not designed primarily for tunneling work, leading to contractual disputes among the parties. This paper examines risk allocation in standard forms of general conditions as applied to tunneling projects. Tunneling risk factors were first identified based on literature, analyses, and interviews with experienced tunnel engineers. We then investigated the general conditions of actual tunneling contracts, including the standard forms of general conditions prepared by the International Federation of Consulting Engineers (FIDIC) in order to analyze and compare their risk allocation schemes. The results show that some tunneling risk factors are not included, whereas some are not clearly or appropriately allocated in such contracts. The paper finally discusses some important considerations on improving the risk allocation in the standard forms of tunneling contracts based on the International Tunneling Association (ITA) recommendations.