RARita Awwad

Rita Awwad

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Rita Awwad has a total of 24 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Rapid Pre-construction Forecasting of Schedule Overruns: A Machine Learning Regression Approach

    by Caesar Abi Shdid, Rita Awwad, Joshua Nasr

    Introduction/Objective: This study developed and validated a parsimonious machine-learning regression model that estimates schedule overruns for building construction projects prior to project start. Methods: Using a dataset of 60 completed building projects in Lebanon, each with 11 pre-project predictors, an XGBoost regression model was trained and tested on an independent dataset, with repeated cross-validation and hyperparameter tuning. Results: Averaged over repeated randomized train/test partitions, the trained and tuned model achieved an R 2 = 79.6% (adjusted R 2 = 74.3%), a mean absolute error of 4.36 ± 0.48 percentage points (95% CI: 3.42–5.30), and a median coverage near the nominal 90% for empirical prediction intervals. Discussion: The regression-based approach extends existing delay-risk assessment by estimating delay magnitude rather than only the risk class, while factor-importance analysis identified owner/client performance, legal/permit issues, design quality, and project manager experience as the major drivers of delay. Conclusion: The model provides a practical decision-support tool for project managers to estimate the expected magnitude of delay and its uncertainty before construction initiation, requiring only eleven readily obtainable pre-project inputs.

  • Owner’s Perspective on Evolution of Bid Prices under Various Price-Driven Bid Selection Methods

    by Rita Awwad, Michael Ammoury

    In the construction industry, it is crucial for owners to select the appropriate contract delivery method to achieve best performance on their projects. The low-bid method has been the most common competitive bid selection approach used for public projects in the US construction industry and worldwide. Although awarding the project to the lowest bid promises transparency in the selection process by considering only one objective criterion (the bid price), it often leads to adversarial relationships, less cooperation among different parties involved in the project, and potential compromise of the project quality. Furthermore, it is often accompanied by a significant number of claims and disputes that often result in cost overruns and schedule delays. Thus, there is a need to explore alternative competitive price-driven bidding methods which can preserve the transparency of the low-bid method and at the same time remedy the inconvenience of unrealistic low bids. This paper uses agent-based modeling to simulate the bidding process dynamics and to observe the long-term evolution of tendered prices and market equilibrium under different competitive tendering approaches including the second low, average, below-average, truncated average, and truncated below-average bidding methods. Whereas most previous bidding literature focused on the contractor’s bidding decisions, this is the first study that addresses the owner’s concern of choosing the most suitable bidding method for its current project and market conditions. This is achieved by analyzing how the bid criterion defined by each of the aforementioned bidding methods impacts the interaction among competing contractors and their bid price adaptation in the long term. Simulation results show that the below-average bid method is most favored for less-competitive projects, whereas the second low bid and average-bid methods are preferred when the level of competition is high.


  • Comparison of Various Competitive Bidding Methods from an Owner’s Perspective

    by Rita Awwad, Michael Ammoury

    In the construction industry, it is crucial for owners to select the appropriate contract delivery method in order to achieve best performance on their projects. The low bid method has been the most common competitive bid selection approach used for public projects in the U.S. construction industry. Although the latter method ensures transparency in the selection process through considering only one objective criterion which is the bid price, it often leads to adversarial relationships, less cooperation among different parties involved in the project, and potential compromise on the project quality. Furthermore, it is often accompanied with a significant number of claims and disputes that often result in cost overruns and schedule delays. Thus, there is a need to explore alternative competitive price-driven bidding methods which can preserve the transparency of the low bid method and at the same time remedy the inconvenience of unrealistic low bids. This paper uses agent based modelling to simulate the interactions among contractors with varying risk behaviour under different competitive tendering approaches including the second low, average, and below-average bidding methods. The conducted simulations revealed that under low competition, the below-average bid method is recommended to owners whereas the second low bid method is more adequate under high competition. The developed platform allows the observation of emergent market patterns such as the evolution of bid prices and capital growth of contractors under each of the simulated bidding methods, which helps owners choose the most suitable method for their current project and market conditions.


  • Agent-Based Model for Simulating Construction Safety Climate in a Market Environment

    by Rita Awwad, Caesar Abi Shdid, Ralph Tayeh

    A strong construction safety climate is sought after by governments, owners, and insurance providers. When making safety policy changes, legislative bodies and construction stakeholders alike try to successfully predict the impact such reformative actions will have on emergent safety patterns. Identifying optimal strategies for improving the market’s safety climate is a difficult task to achieve given the complex interactions between the various parties involved. An agent-based model is developed and presented in this case study that mimics the interactions among project stakeholders at the market level within the context of construction safety during both bidding and construction phases. In addition to incorporating various behavioral patterns and financial attributes of contractors and owners, the model makes use of insurance premium models and government fines to simulate safety climate patterns at the project and market levels. The model is shown to be capable of realistically depicting emergi...


  • Understanding Dispute Resolution in the Middle East Region from Perspectives of Different Stakeholders

    by Rita Awwad, Boushra Barakat, Carol Menassa

    The construction industry in the Middle East (ME) is witnessing continuous growth that attracts international contractors and investors to its large-scale projects. However, this growth is accompanied by an inevitable increase in claims and disputes, which consequently leads to significant delays and additional costs to the project. Alternative dispute resolution (ADR) methods are often used to address these conflicts, but different issues and backgrounds of stakeholders in the ME affect which ADR is used if any. In light of this, the main aim of this study is to explore dispute causes and resolution practices in the ME as perceived by the different stakeholders involved. Based on extensive literature review, a comprehensive questionnaire survey was conducted involving 177 professionals from different sectors of the ME construction industry. The responses were analyzed from three distinct perspectives, namely contractors, owners, and claim advisors. Findings revealed that contractual causes are th...


  • An Agent-Based Framework for Simulating Contractors’ Safety Behavior

    by Ralph Tayeh, Rita Awwad, Caesar Abi Shdid

    A contractor’s attitude towards construction safety, and the subsequently implemented safety program, are complex phenomena that are affected by a wide array of factors. These factors can range from government policy and insurance companies’ builder’s risk models on one end of the spectrum, to social and cultural factors on the other end. Predicting the safety behavior of contractors is a difficult task, even when government labor safety policies and builder’s risk insurance programs are well established. In regions where government safety legislation is non-existent, insurance companies lack the mechanisms to track the safety performance of contractors, and the cultural climate promotes safety negligence; predicting the safety behavior of contractors requires intricate and complex modeling of the entire environment in which these contractors operate and evolve. A conceptual framework for an agent-based model is presented that allows the analysis of how initiatives taken by different stakeholders in the construction environment can affect the safety behavior of contractors. The model is tested on a case study, and the behavior of various agents and their interactions are summarized. The resulting model is shown to be promising for use by decision makers to find optimal strategies aiming at improving the construction market’s safety performance.

  • Top Cited Papers

    Construction safety practices and challenges in a Middle Eastern developing country

    by Rita Awwad, Omar El Souki, Melanie Jabbour