Dong-Yeon Kim
Dong-Yeon Kim has a total of 16 co-authors. Here are the top co-authors by number of shared publications:
- Chul-Hyung Lee
Space R&D Center, Hanwha Systems, Gyeonggidong-ro, Namsa-eup, Cheoin-gu, Yongin-si 17121, Republic of Korea
1 shared publication - Dong-Geon Kim
Satellite Mechanical Team, Hanwha Systems, 491-23, Gyeonggidong-ro, Namsa-myeon, Cheoin-gu, Yongin-si 17121, Republic of Korea
1 shared publication - GyeongHun Bae
Satellite Mechanical Team, Hanwha Systems, 491-23, Gyeonggidong-ro, Namsa-myeon, Cheoin-gu, Yongin-si 17121, Republic of Korea
1 shared publication - Han-Sol Choi
Department of Mechanical Engineering, Jeonbuk National University, 567 Baekje-daero, Deokjin-gu, Jeonju-si 54896, Jeollabuk-do, Korea
1 shared publication - Hyun-Guk Kim
Satellite Mechanical Team, Hanwha Systems, 491-23, Gyeonggidong-ro, Namsa-myeon, Cheoin-gu, Yongin-si 17121, Republic of Korea
1 shared publication - Jae Hyuk Lim
Department of Mechanical Engineering Kyung Hee University 1732 Deogyeong-daero Giheung-gu Yongin-si 17104 Gyeonggi-do Republic of Korea
1 shared publication
Latest Publications
- Open Access
- 17 March 2026
- Published by MDPI AG in Applied Sciences
- Vol. 16 (6) , 2869
Development of Deployable Reflector Antenna for SAR-Satellite, Part 5: Experimental Verification of Qualification Model of Space-Grade 5 m-Class Deployable Reflector Antenna
Synthetic aperture radar (SAR), which appeared in the early 1990s, refers to a technology that creates a virtual large aperture by receiving/combining signals from various locations while moving with a fixed antenna. Using SAR-based image acquisition technology, a reconnaissance satellite can obtain high-quality images regardless of the weather and day/night conditions. In this study, the qualification tests of a space-grade 5m-class deployable reflector antenna for satellites, which is the primary payload of a SAR-based satellite, were conducted. In order to ensure the electrical performance of the reflector antenna, an alignment verification test was performed using a laser tracker system during the assembly and integration process. Generally, the satellite experiences a considerable amount of structural load under the launch condition and is exposed to extremely low- and high-temperature thermal environments under the orbital condition. For the space mission, environmental tests should be conducted to verify the structural/thermal stability for the launch and orbital conditions. A deployment repeatability test was conducted to ensure that the deployment mechanism operated properly before/after each test. The qualification process and philosophy proposed in this work could be applied to the development of the space-grade deployable reflector antenna.
- 17 March 2026
- Published by MDPI AG in Applied Sciences
- Vol. 16 (6) , 2869
Open AccessDevelopment of Deployable Reflector Antenna for SAR-Satellite, Part 5: Experimental Verification of Qualification Model of Space-Grade 5 m-Class Deployable Reflector Antenna
Synthetic aperture radar (SAR), which appeared in the early 1990s, refers to a technology that creates a virtual large aperture by receiving/combining signals from various locations while moving with a fixed antenna. Using SAR-based image acquisition technology, a reconnaissance satellite can obtain high-quality images regardless of the weather and day/night conditions. In this study, the qualification tests of a space-grade 5m-class deployable reflector antenna for satellites, which is the primary payload of a SAR-based satellite, were conducted. In order to ensure the electrical performance of the reflector antenna, an alignment verification test was performed using a laser tracker system during the assembly and integration process. Generally, the satellite experiences a considerable amount of structural load under the launch condition and is exposed to extremely low- and high-temperature thermal environments under the orbital condition. For the space mission, environmental tests should be conducted to verify the structural/thermal stability for the launch and orbital conditions. A deployment repeatability test was conducted to ensure that the deployment mechanism operated properly before/after each test. The qualification process and philosophy proposed in this work could be applied to the development of the space-grade deployable reflector antenna.
- Open Access
- 4 January 2022
- Published by MDPI AG in Applied Sciences
- Vol. 12 (1) , 451
Modeling and Validation of a Passive Truss-Link Mechanism for Deployable Structures Considering Friction Compensation with Response Surface Methods
In this study, a passive truss-link mechanism applicable to large-scale deployable structures was designed to achieve successful deployment in space. First, we simplified the selected truss-link mechanisms to the two-dimensional geometry and calculated the degrees of freedom (DOF) to determine whether a kinematic over-constraint occurs. The dimensions of the truss-link structure were determined through a deployment kinematic analysis. Second, a deployment simulation with the truss-link was conducted using multibody dynamics (MBD) software. Finally, a deployment test was performed considering gravity compensation, and the results were compared with those of MBD simulation. The results of the deployment simulations were confirmed to be slightly faster than those of the deployment test due to friction effects existing in the joints and gravity compensation devices. To address this issue, inverse identification of the equivalent frictional torque (EFT) at the revolute joints in the deployment test was conducted through response surface methods (RSM) combined with the central composite design technique. As a result, we confirmed that the deployment angle history of the deployment simulation was similar to that of the deployment test.
- 4 January 2022
- Published by MDPI AG in Applied Sciences
- Vol. 12 (1) , 451
Open AccessModeling and Validation of a Passive Truss-Link Mechanism for Deployable Structures Considering Friction Compensation with Response Surface Methods
In this study, a passive truss-link mechanism applicable to large-scale deployable structures was designed to achieve successful deployment in space. First, we simplified the selected truss-link mechanisms to the two-dimensional geometry and calculated the degrees of freedom (DOF) to determine whether a kinematic over-constraint occurs. The dimensions of the truss-link structure were determined through a deployment kinematic analysis. Second, a deployment simulation with the truss-link was conducted using multibody dynamics (MBD) software. Finally, a deployment test was performed considering gravity compensation, and the results were compared with those of MBD simulation. The results of the deployment simulations were confirmed to be slightly faster than those of the deployment test due to friction effects existing in the joints and gravity compensation devices. To address this issue, inverse identification of the equivalent frictional torque (EFT) at the revolute joints in the deployment test was conducted through response surface methods (RSM) combined with the central composite design technique. As a result, we confirmed that the deployment angle history of the deployment simulation was similar to that of the deployment test.