SMSaba Mani

Saba Mani

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Saba Mani has a total of 11 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Building circularity performance model: a weighted multi-level assessment framework aligned with ISO standards

    by Saba Mani, Gayani Karunasena, M. Reza Hosseini, Abid Hasan

    Purpose: This paper proposes the building circularity performance (BCP) model to address fragmentation in existing building circularity assessments, which lack comprehensive coverage of circular economy (CE) aspects, standardized KPI weightings and multi-level evaluation across buildings. Design/methodology/approach: Using a design science research approach, a holistic and weighted assessment framework spanning five building levels (material, subcomponent, component, system and building) was developed. The BCP integrates 52 validated and weighted key performance indicators (KPIs) covering material flows, waste, energy, water, CO2 emissions and design strategies, aligned with ISO 20887 and ISO 59020. The model was demonstrated through a single case study, and evaluated through an expert focus group, four design scenarios and sensitivity analyses of KPIs and weights. Findings: Results show that circularity performance improves most through strategies extending building lifespan, promoting modularity and optimizing renewable resource use. The findings reveal that circularity emerges from the interaction of material, environmental and design strategies rather than isolated interventions. Sensitivity analyses confirm that the model is both responsive and robust, with bounded variations in outputs and consistent scenario rankings under input and weight changes. Originality/value: The novelty of BCP lies in its systematic integration and weighting of multiple KPIs in various CE dimensions through a five-level structure. BCP advances existing approaches by integrating previously overlooked dimensions, including locality, hazardous content, environmental performance and design strategies such as repairability and take-back systems, within a single building assessment framework. It also contributes to the Sustainable Development Goals by supporting climate-resilient, resource-efficient and circular building practices.

  • Open Access

    What to assess in circular buildings: key performance indicators for circular transformation

    by Saba Mani, Gayani Karunasena, Abid Hasan, M. Reza Hosseini

    Purpose: This study addresses the critical gap in evaluating building circularity by developing a comprehensive framework of key performance indicators (KPIs). While circular economy (CE) principles are increasingly emphasized in building design, their adoption is hindered by the absence of standardized and prioritized KPIs across the building lifecycle. Design/methodology/approach: A two-stage research design was employed. First, a systematic meta-synthesis of literature identified micro-level KPIs. Second, industry and academic experts validated and ranked them using a two-round fuzzy Delphi method and fuzzy analytical hierarchy process. Findings: The study developed the Building Circularity KPI Framework (building circularity KPIs framework [BCKPIF]), comprising 52 KPIs across six domains: material, waste, energy, water, CO2 emissions and design. Findings highlight the need to incorporate overlooked circularity aspects such as energy, water, CO2 emissions and design. BCKPIF shows a clear KPI prioritization: disassembly, refusing unnecessary new construction and material durability ranked highest overall. It also reveals prioritizations across different categories, reflecting preferred CE strategies for each category – for instance, reuse received the greatest weight for the material and waste categories. Research limitations/implications: This study focuses on technical and environmental dimensions of building circularity. Economic and social aspects are excluded to allow a more focused and measurable assessment of circularity in buildings as CE focuses more narrowly on resource efficiency, material loops and system innovation. Practical implications: Weighted KPIs guide practitioners in prioritizing interventions and selecting materials, technologies and design strategies. For policymakers, the results provide an evidence base for translating circular design strategies, such as reuse, modularity and deconstruction into regulatory benchmarks, procurement requirements and incentive mechanisms. The framework also supports progress toward multiple sustainable development goals. Originality/value: This study advances the field by consolidating fragmented micro-level circularity KPIs into a comprehensive and weighted framework, integrating overlooked aspects such as energy, water and CO2 emissions alongside design strategies.


  • Open Access

    Socio-Technical and Political Complexities: Findings from Two Case Studies of Large IT Project-Based Organizations

    by Navid Ahmadi Eftekhari, Saba Mani, Javad Bakhshi, Larissa Statsenko, Leila Moslemi Naeni

    Information technology (IT) projects are becoming more complex due to technological advancements, increased sociopolitical demand, and competition. In recent years, the project complexity field has attracted increasing attention with diverse strategies and methods proposed to identify, evaluate, and respond to various complexities. This study aims to identify and prioritize factors contributing to complexity in IT projects by reporting two case studies conducted on large IT organizations. The literature on project complexity informed and guided this exploratory research. The data were collected through 21 semi-structured interviews and analyzed by applying open and axial coding content analysis. Underpinned by complexity theories, 19 factors contributing to the complexity of IT projects were identified, and their importance was highlighted using the Friedman test. The top five factors contributing to IT project complexity were identified as follows: the diversity of stakeholders; technological newness of the project; conflicting goals of stakeholders; variety of product sub-systems and components; and uncertainty of project objectives. This study’s findings contribute to the project management literature and inform practitioners about how to achieve more effective management of complex IT projects.


  • Open Access

    Project Manager Competencies for Dealing with Socio-Technical Complexity: A Grounded Theory Construction

    by Navid Ahmadi Eftekhari, Saba Mani, Javad Bakhshi, Sahar Mani

    An ongoing question is what constitutes the characteristics of a project manager. This is the subject of many studies. The characteristics, skills, abilities and knowledge of project managers—essential factors in a project’s success—describe their level of competency. This study aims to assess the relationship between project manager competencies and project complexity in the information technology (IT) sector. In total, 21 semi-structured interviews were conducted with senior practitioners associated with complex IT projects in the private and public sectors. All transcripts were analysed through grounded theory and content analysis, with experts approving the results. Our study identified 41 competencies within project complexity, with these grouped under the following 10 dimensions: project management (PM) knowledge; management skills; interpersonal skills and attributes; professionalism; expertise; emotional skills; contextual skills; influencing skills; team working; and cognitive skills. According to this research, leadership is the core competency of a project manager, while project management knowledge is the most essential of these competency dimensions. This study’s findings can assist both academics and practitioners in simplifying the complexity of projects and helping to achieve a project’s objectives.


  • Open Access

    A Bid/Mark-Up Decision Support Model in Contractor’s Tender Strategy Development Phase Based on Project Complexity Measurement in the Downstream Sector of Petroleum Industry

    by Amir Faraji, Maria Rashidi, Navid Ahmadi Eftekhari, Srinath Perera, Saba Mani

    The tender process is an inseparable step of the contract award process in the public sector, and from the other point of view, it is one of the crucial elements of the core business of construction contractors. Reviewing previous research reveals a gap in the application of a project’s detailed features and historical data to support the bid/no-bid decision and to determine the cost and time contract mark-ups. In this study, a prescriptive project complexity-based model is proposed to support the bid decision in the tender strategy development phase of a contractor for the downstream sector of the petroleum industry in Iran. For this purpose, regression analysis of historical data is adopted to configure the model and to infer from previous actual trends by exploring relationships between the contractor’s bid decision and proposed mark-ups with the project’s inherent and surrounding complexity factors. Hence, using experts’ opinions and historical data from 139 previous contracts as training and test data, a model was developed to make a decision on a bid and mark-up problem. The results of the model validation show that the credibility of the model is 74.67% and 75.36% for time and cost, respectively, and the reliability of model outputs is approximately 90% overall in predicting the bid mark-ups in accordance with the project complexity index (PCI). The main contribution of this research to current knowledge has two aspects: utilizing the complexity concept for the tender problem in the form of a project complexity index (PCI) and considering both time and cost mark-ups (TMU–CMU) in the contractor’s bid simultaneously. In addition, the results show that the more complex the project is, the higher the bid rate is.