Michiel Christiaan Bekker
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Michiel Christiaan Bekker has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
H. Mulder
University of Pretoria, South Africa
2 shared publicationsC. Marnewick
University of Johannesburg
1 shared publication- Carl Marnewick
University of Johannesburg Department of Applied Information Systems
1 shared publication Colin Gewanial
University of Pretoria
1 shared publicationDanielle Steenkamp
Univ Pretoria, Dept Engn & Technol Management, Pretoria, South Africa
1 shared publicationDavison Murwira
1 shared publication
Latest Publications
- Open Access
- 26 February 2024
- Published by Academy of Science of South Africa in Journal of the Southern African Institute of Mining and Metallurgy
- Vol. 124 (1) , 7-14
Lean construction: Implementing the Last Planner System on mining projects
- 26 February 2024
- Published by Academy of Science of South Africa in Journal of the Southern African Institute of Mining and Metallurgy
- Vol. 124 (1) , 7-14
Open AccessLean construction: Implementing the Last Planner System on mining projects
- 1 January 2024
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 35 (4) , 13-26
ANALYSING ORGANISATIONAL ROBUSTNESS IN THE APPLICATION OF PROJECT PORTFOLIO MANAGEMENT
Project portfolio management (PPM) has become a popular practice among organisations in effectively driving a collection of projects and/or programmes to align with and meet their strategic objectives. PPM is still considered a new concept, and is in the early days of its implementation. Even the best-performing organisations are still not excelling in executing best practices in PPM. This research reviews the literature on the robustness of portfolio governance controls. A semi-structured technique entailing a questionnaire and qualitative interviews to access best practices was used with a population of PPM professionals from various industries. The paper reviews the impact of higher levels of compliance on a model and/or framework in more mature environments in order to prevent or minimise the influence of external elements such as executive veto on PPM practices. Keywords: Portfolio management, portfolio governance, project leadership
- 1 January 2024
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 35 (4) , 13-26
ANALYSING ORGANISATIONAL ROBUSTNESS IN THE APPLICATION OF PROJECT PORTFOLIO MANAGEMENT
Project portfolio management (PPM) has become a popular practice among organisations in effectively driving a collection of projects and/or programmes to align with and meet their strategic objectives. PPM is still considered a new concept, and is in the early days of its implementation. Even the best-performing organisations are still not excelling in executing best practices in PPM. This research reviews the literature on the robustness of portfolio governance controls. A semi-structured technique entailing a questionnaire and qualitative interviews to access best practices was used with a population of PPM professionals from various industries. The paper reviews the impact of higher levels of compliance on a model and/or framework in more mature environments in order to prevent or minimise the influence of external elements such as executive veto on PPM practices. Keywords: Portfolio management, portfolio governance, project leadership
- 1 December 2022
- Published by Serbian Project Management Association
THE IMPACT OF THE RELATIONAL CHARTER ON THE PROJECT PRINCIPAL–AGENT RELATIONSHIP
This paper aims to identify variables that define the agency […] This paper aims to identify variables that define the agency relationship and the relational charter, and the likelihood of the relational charter affecting the agency relationship. However, the link between the two constructs remains unclear. The results from the literature identified the variables that define the agency relationship and the relational charter. Results from a
- 1 December 2022
- Published by Serbian Project Management Association
THE IMPACT OF THE RELATIONAL CHARTER ON THE PROJECT PRINCIPAL–AGENT RELATIONSHIP
This paper aims to identify variables that define the agency […] This paper aims to identify variables that define the agency relationship and the relational charter, and the likelihood of the relational charter affecting the agency relationship. However, the link between the two constructs remains unclear. The results from the literature identified the variables that define the agency relationship and the relational charter. Results from a
- Open Access
- 31 October 2022
- Published by Academy of Science of South Africa in Journal of the Southern African Institute of Mining and Metallurgy
- Vol. 122 (9) , 1-8
Towards a generalizable project readiness assessment methodology for the mining industry: A literature review
- 31 October 2022
- Published by Academy of Science of South Africa in Journal of the Southern African Institute of Mining and Metallurgy
- Vol. 122 (9) , 1-8
Open AccessTowards a generalizable project readiness assessment methodology for the mining industry: A literature review
- 22 August 2022
- Published by Academy of Science of South Africa in Journal of the Southern African Institute of Mining and Metallurgy
- Vol. 122 (7) , 1-10
A review of readiness assessments for mining projects
The objective of this paper is to describe the research followed in creating a generalized, readiness assessment tool for mining projects. We start by highlighting the need for the assessment tool and then progress towards explaining the methodology followed during the study. The selection and finalization of the list of elements, sections, and categories that make up the unweighted values are described, followed by a summary of the weighting process applied. The outcome of this process is a weighted readiness assessment tool for mining project studies. The main benefits of the tool are that it will guide decision-makers and project managers through the definition phases of the project and improve the likelihood of project success.
- 22 August 2022
- Published by Academy of Science of South Africa in Journal of the Southern African Institute of Mining and Metallurgy
- Vol. 122 (7) , 1-10
A review of readiness assessments for mining projects
The objective of this paper is to describe the research followed in creating a generalized, readiness assessment tool for mining projects. We start by highlighting the need for the assessment tool and then progress towards explaining the methodology followed during the study. The selection and finalization of the list of elements, sections, and categories that make up the unweighted values are described, followed by a summary of the weighting process applied. The outcome of this process is a weighted readiness assessment tool for mining project studies. The main benefits of the tool are that it will guide decision-makers and project managers through the definition phases of the project and improve the likelihood of project success.
- Open Access
- 1 January 2022
- Published by Journal of Contemporary Management in Journal of Contemporary Management
- Vol. 19 (1) , 362-380
Projectification within a developing country: The case of South Africa
Background: Projectification is becoming a topic of interest within the project management community. Various authors discuss and debate the concept of projectification but little information is available about the level of projectification.Purpose of ...
- 1 January 2022
- Published by Journal of Contemporary Management in Journal of Contemporary Management
- Vol. 19 (1) , 362-380
Open AccessProjectification within a developing country: The case of South Africa
Background: Projectification is becoming a topic of interest within the project management community. Various authors discuss and debate the concept of projectification but little information is available about the level of projectification.Purpose of ...
- Open Access
- 31 May 2021
- Published by Academy of Science of South Africa in Journal of the Southern African Institute of Mining and Metallurgy
- Vol. 121 (5) , 217-226
Projectification in the South African mining industry
Projects or project-orientated approaches have become a common form of work in nearly all sectors of economies. This has led to concepts such as 'projectified' and 'project orientated' organizations. By defining projectification of a company, industry, or economy as the share of project work in total work, one can reasonably determine the impact that project management, and by default projectification, has had on that company, industry, or economy in terms of staff optimization and allocation. This paper presents the results for such a projectification study of the South African mining industry. This sector has long been a significant contributor to the country's economy from a gross value added (GVA) and employment point of view. Understanding the impact of projectification and the project management way of work on this industry may potentially add significant value to both the mining and project management knowledge areas. We show that although the mining industry is considered by some to operate in archaic ways, the level of projectification has increased over time, and now represents approximately one third of all work conducted.
- 31 May 2021
- Published by Academy of Science of South Africa in Journal of the Southern African Institute of Mining and Metallurgy
- Vol. 121 (5) , 217-226
Open AccessProjectification in the South African mining industry
Projects or project-orientated approaches have become a common form of work in nearly all sectors of economies. This has led to concepts such as 'projectified' and 'project orientated' organizations. By defining projectification of a company, industry, or economy as the share of project work in total work, one can reasonably determine the impact that project management, and by default projectification, has had on that company, industry, or economy in terms of staff optimization and allocation. This paper presents the results for such a projectification study of the South African mining industry. This sector has long been a significant contributor to the country's economy from a gross value added (GVA) and employment point of view. Understanding the impact of projectification and the project management way of work on this industry may potentially add significant value to both the mining and project management knowledge areas. We show that although the mining industry is considered by some to operate in archaic ways, the level of projectification has increased over time, and now represents approximately one third of all work conducted.
- Open Access
- 1 May 2018
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 29 (1) , 74-85
VALIDATING A PROJECT LIFE-CYCLE REVIEW FRAMEWORK FOR MINING PROJECTS AT EXXARO
Independent formal reviews against validated project frameworks aim to ensure that pre-specified phase deliverables are completed and validated before the next project phase begins. Through various internal initiatives, Exxaro established a project framework to develop and implement capital projects. However, to date, this framework has not been validated. The intent of this research was, through a case study approach, to validate the project framework for Exxaro (a holistic case). Semi-structured interviews were conducted with sixteen key role players across the organisation on four different projects (embedded cases). Results from the embedded cases were compared to identify common themes emerging from the research. Although the research identified areas for improvement for certain aspects of the framework, the common themes correspond with the main aspects of the proposed framework, thus validating the framework.
- 1 May 2018
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 29 (1) , 74-85
Open AccessVALIDATING A PROJECT LIFE-CYCLE REVIEW FRAMEWORK FOR MINING PROJECTS AT EXXARO
Independent formal reviews against validated project frameworks aim to ensure that pre-specified phase deliverables are completed and validated before the next project phase begins. Through various internal initiatives, Exxaro established a project framework to develop and implement capital projects. However, to date, this framework has not been validated. The intent of this research was, through a case study approach, to validate the project framework for Exxaro (a holistic case). Semi-structured interviews were conducted with sixteen key role players across the organisation on four different projects (embedded cases). Results from the embedded cases were compared to identify common themes emerging from the research. Although the research identified areas for improvement for certain aspects of the framework, the common themes correspond with the main aspects of the proposed framework, thus validating the framework.
- Open Access
- 1 January 2018
- Published by Academy of Science of South Africa in South African Journal of Agricultural Extension (SAJAE)
- Vol. 46 (1) , 83-91
A critical review of agricultural related construction project failures at the Department of Agricultural, Rural Development and Environmental Affairs (DARDLEA): Mpumalanga
The aim of the study was to determine the causes of construction project failures in the Department of Agriculture, Rural Development and Environmental Affairs (DARDLEA). A detailed literature review was carried out on construction projects that failed due to cost and time overruns. A list of construction project failure factors was identified and later categorised into contractor, client and owner-related causes. A five-point Likert scale was used to collect data from the contractors and owners and the same questionnaire was used to interview the clients or beneficiaries telephonically. The data were analysed using the Relative Importance Index (RII) and Correlation Testing. The key causes of construction project failure as per their rankings were poor communication, lack of monitoring and evaluation, lack of client or beneficiary involvement, lack of project planning, financial difficulties, poor project scheduling, incomplete project drawing, conflict, poor technical performance, and changing client requirements. The Spearman correlation concluded that relationships existed amongst the owner, client and contractor responses. From the results, the main recommendation is that all project planning, design and scheduling should be approved by the contractor, client and owner before construction commences. Secondly, all project stakeholders should be involved during the planning of projects to enhance project sustainability, and thirdly, projects should only commence when there is a guarantee that all plans, budgets and schedules are realistic, and funds are available for access. With regards to extension, the results indicate specific areas of stakeholder engagement prior and during construction to assist in managing expectations.
- 1 January 2018
- Published by Academy of Science of South Africa in South African Journal of Agricultural Extension (SAJAE)
- Vol. 46 (1) , 83-91
Open AccessA critical review of agricultural related construction project failures at the Department of Agricultural, Rural Development and Environmental Affairs (DARDLEA): Mpumalanga
The aim of the study was to determine the causes of construction project failures in the Department of Agriculture, Rural Development and Environmental Affairs (DARDLEA). A detailed literature review was carried out on construction projects that failed due to cost and time overruns. A list of construction project failure factors was identified and later categorised into contractor, client and owner-related causes. A five-point Likert scale was used to collect data from the contractors and owners and the same questionnaire was used to interview the clients or beneficiaries telephonically. The data were analysed using the Relative Importance Index (RII) and Correlation Testing. The key causes of construction project failure as per their rankings were poor communication, lack of monitoring and evaluation, lack of client or beneficiary involvement, lack of project planning, financial difficulties, poor project scheduling, incomplete project drawing, conflict, poor technical performance, and changing client requirements. The Spearman correlation concluded that relationships existed amongst the owner, client and contractor responses. From the results, the main recommendation is that all project planning, design and scheduling should be approved by the contractor, client and owner before construction commences. Secondly, all project stakeholders should be involved during the planning of projects to enhance project sustainability, and thirdly, projects should only commence when there is a guarantee that all plans, budgets and schedules are realistic, and funds are available for access. With regards to extension, the results indicate specific areas of stakeholder engagement prior and during construction to assist in managing expectations.
- Open Access
- 30 November 2017
- Published by University of the Free State in Acta Structilia 23(2)
- Vol. 24 (2) , 128-145
Building an infrastructure project performance in the North-West Province Department of Public Works and Roads
Building and infrastructure projects at the North-West Province Department of Public Works and Roads (NW DPWR) often perform poorly in terms of overrunning both the original approved timeline and the budget. Adding to poor time and cost performances, these projects often do not meet the desired functional requirements. This article reports on findings of a study which investigated the causes of these poor performances in the NW DPWR. Fifty potential causes of poor performance were identified from literature. These factors were grouped under three main related categories of owner-related, contractor-related and consultant-related and were subjected to a questionnaire survey to identify the most critical causes of failure. The results were analysed using the Relative Importance Index (RII) and Spearman’s Rank Correlation Coefficients. The results indicated that the most significant causes of poor building and infrastructure project performance in the NW DPWR include underestimation of project cost, the lack of experience in executing projects, contractor’s cash-flow constraints, corruption and bribery during the bidding and contract award phase, as well as poor site management and supervision. Recommendations are made to prevent similar causes of projects failure in the NW DPWR in future.
- 30 November 2017
- Published by University of the Free State in Acta Structilia 23(2)
- Vol. 24 (2) , 128-145
Open AccessBuilding an infrastructure project performance in the North-West Province Department of Public Works and Roads
Building and infrastructure projects at the North-West Province Department of Public Works and Roads (NW DPWR) often perform poorly in terms of overrunning both the original approved timeline and the budget. Adding to poor time and cost performances, these projects often do not meet the desired functional requirements. This article reports on findings of a study which investigated the causes of these poor performances in the NW DPWR. Fifty potential causes of poor performance were identified from literature. These factors were grouped under three main related categories of owner-related, contractor-related and consultant-related and were subjected to a questionnaire survey to identify the most critical causes of failure. The results were analysed using the Relative Importance Index (RII) and Spearman’s Rank Correlation Coefficients. The results indicated that the most significant causes of poor building and infrastructure project performance in the NW DPWR include underestimation of project cost, the lack of experience in executing projects, contractor’s cash-flow constraints, corruption and bribery during the bidding and contract award phase, as well as poor site management and supervision. Recommendations are made to prevent similar causes of projects failure in the NW DPWR in future.