Timothy Vervaet
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Timothy Vervaet has a total of 34 co-authors. Here are the top co-authors by number of shared publications:
- Peter Troch
Department of Civil Engineering, Ghent University, Technologiepark 60, 9052 Ghent, Belgium
6 shared publications Vasiliki Stratigaki
4 shared publicationsNicolas Quartier
3 shared publications- Marc Vantorre
Ghent University
2 shared publications Maximilian Streicher
2 shared publications- Vasiliki Stratigaki
Department of Civil Engineering, Ghent University, Technologiepark 60, 9052 Ghent, Belgium
2 shared publications
Latest Publications
- Open Access
- 29 May 2025
- Published by Coastal Engineering Research Council in Coastal Engineering Proceedings
- No. 38,p. 10
EVALUATION OF THE ACCURACY OF THE GENERATED WAVE FIELDS IN THE COASTAL AND OCEAN BASIN (COB)
The Coastal and Ocean Basin (COB) wave tank facility is located in the Flanders Maritime Laboratory at the Ostend Science Park, Belgium. The COB and its associated testing services are designed (Troch et al. 2016) to facilitate the needs of the offshore renewable energy sector, coastal and offshore engineering community and offer the opportunity to academia, companies and government agencies, to test scale models under combined action of waves and currents in any relative direction, to develop innovative designs. The exploitation is managed by the consortium Ghent University, KU Leuven and Flanders Hydraulics. The COB is operational since March 2023 and has since then successfully completed its first projects on wave energy converters (WECfarm), wave diffraction around a monopile (PhairywinD) and floating offshore photovoltaic islands (MarineSpots).
- 29 May 2025
- Published by Coastal Engineering Research Council in Coastal Engineering Proceedings
- No. 38,p. 10
Open AccessEVALUATION OF THE ACCURACY OF THE GENERATED WAVE FIELDS IN THE COASTAL AND OCEAN BASIN (COB)
The Coastal and Ocean Basin (COB) wave tank facility is located in the Flanders Maritime Laboratory at the Ostend Science Park, Belgium. The COB and its associated testing services are designed (Troch et al. 2016) to facilitate the needs of the offshore renewable energy sector, coastal and offshore engineering community and offer the opportunity to academia, companies and government agencies, to test scale models under combined action of waves and currents in any relative direction, to develop innovative designs. The exploitation is managed by the consortium Ghent University, KU Leuven and Flanders Hydraulics. The COB is operational since March 2023 and has since then successfully completed its first projects on wave energy converters (WECfarm), wave diffraction around a monopile (PhairywinD) and floating offshore photovoltaic islands (MarineSpots).
- Open Access
- 22 February 2025
- Published by Elsevier in Applied Ocean Research
- Vol. 156
Wave basin testing of hydrodynamic interactions in centralized controlled wave energy converter arrays for irregular short- and long-crested waves
- 22 February 2025
- Published by Elsevier in Applied Ocean Research
- Vol. 156
Open AccessWave basin testing of hydrodynamic interactions in centralized controlled wave energy converter arrays for irregular short- and long-crested waves
- Open Access
- 1 May 2024
- Published by TU Delft OPEN Publishing in CoastLab 2024: Physical Modelling in Coastal Engineering and Science
Physical Modelling Of A Centralized Controlled Array Of Five Wecfarm Wave Energy Converters
Point absorber wave energy converters (WECs) closely placed in array hydrodynamically interact through wave radiation and diffraction. The power absorption by these WECs is optimised by altering the WEC dynamics through the control of the Power Take-Off (PTO). As the WEC dynamics are changed, the hydrodynamic interactions change as well. Therefore, the PTO control should be optimized taking all these interactions into account, referred to as centralized control. The ‘WECfarm’ project has been initiated to study WEC arrays, and to address the research gap on available realistic and reliable data on WEC array tests to validate numerical models (Vervaet et al., 2022). This work discusses the experimental design, implementation and testing of a centralized controlled array of five ‘WECfarm’ heaving point absorber WECs, tested at the Coastal and Ocean Basin Ostend.
- 1 May 2024
- Published by TU Delft OPEN Publishing in CoastLab 2024: Physical Modelling in Coastal Engineering and Science
Open AccessPhysical Modelling Of A Centralized Controlled Array Of Five Wecfarm Wave Energy Converters
Point absorber wave energy converters (WECs) closely placed in array hydrodynamically interact through wave radiation and diffraction. The power absorption by these WECs is optimised by altering the WEC dynamics through the control of the Power Take-Off (PTO). As the WEC dynamics are changed, the hydrodynamic interactions change as well. Therefore, the PTO control should be optimized taking all these interactions into account, referred to as centralized control. The ‘WECfarm’ project has been initiated to study WEC arrays, and to address the research gap on available realistic and reliable data on WEC array tests to validate numerical models (Vervaet et al., 2022). This work discusses the experimental design, implementation and testing of a centralized controlled array of five ‘WECfarm’ heaving point absorber WECs, tested at the Coastal and Ocean Basin Ostend.
- Open Access
- 11 October 2022
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 10 (10) , 1480
Experimental Modelling of an Isolated WECfarm Real-Time Controllable Heaving Point Absorber Wave Energy Converter
To offer point absorber wave energy converters (WECs) as a bankable product on the marine renewable energy market, multiple WECs will be installed together in an array configuration. The wave energy community (research and industrial) has identified the urgent need for available realistic and reliable data on WEC array tests in order to perform a better WEC array optimization approach and in order to validate recently developed (non-linear) numerical models. The ‘WECfarm’ project is initiated to cover this scientific gap on necessary experimental data. The ‘WECfarm’ experimental setup consists of an array of five generic heaving point-absorber WECs. The WECs are equipped with a permanent magnet synchronous motor (PMSM), addressing the need for WEC array tests with an accurate and actively controllable power take-off (PTO). The WEC array control and data acquisition are realized with a Speedgoat Performance real-time target machine, offering the possibility to implement advanced WEC array control strategies in the MATLAB-Simulink environment. The presented article describes the experimental setup, the performed tests and the results of the test campaign using a single, isolated ‘WECfarm’ WEC in April 2021 at the wave basin of Aalborg University (AAU), Denmark. A Coulomb and viscous friction model is determined to partly compensate for the drivetrain (motor, gearbox, rack and pinion) friction. A system identification (SID) approach is adopted considering the WEC system to be composed of two single input single output (SISO) models, the radiation and the excitation model. Radiation tests yield the intrinsic impedance. Excitation tests yield the excitation frequency response function. Adopting an impedance matching approach, the control parameters for the resistive and reactive controller are determined from the complex conjugate of the intrinsic impedance. Both controllers are tested for a selection of regular wave conditions. The performed experimental test campaign using an isolated ‘WECfarm’ WEC allows a full evaluation of the WEC design prior to extending the setup to five WECs. Within the ‘WECfarm’ project, an experimental campaign with a five-WEC array in the Coastal and Ocean Basin (COB) in Ostend, Belgium, is under preparation.
- 11 October 2022
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 10 (10) , 1480
Open AccessExperimental Modelling of an Isolated WECfarm Real-Time Controllable Heaving Point Absorber Wave Energy Converter
To offer point absorber wave energy converters (WECs) as a bankable product on the marine renewable energy market, multiple WECs will be installed together in an array configuration. The wave energy community (research and industrial) has identified the urgent need for available realistic and reliable data on WEC array tests in order to perform a better WEC array optimization approach and in order to validate recently developed (non-linear) numerical models. The ‘WECfarm’ project is initiated to cover this scientific gap on necessary experimental data. The ‘WECfarm’ experimental setup consists of an array of five generic heaving point-absorber WECs. The WECs are equipped with a permanent magnet synchronous motor (PMSM), addressing the need for WEC array tests with an accurate and actively controllable power take-off (PTO). The WEC array control and data acquisition are realized with a Speedgoat Performance real-time target machine, offering the possibility to implement advanced WEC array control strategies in the MATLAB-Simulink environment. The presented article describes the experimental setup, the performed tests and the results of the test campaign using a single, isolated ‘WECfarm’ WEC in April 2021 at the wave basin of Aalborg University (AAU), Denmark. A Coulomb and viscous friction model is determined to partly compensate for the drivetrain (motor, gearbox, rack and pinion) friction. A system identification (SID) approach is adopted considering the WEC system to be composed of two single input single output (SISO) models, the radiation and the excitation model. Radiation tests yield the intrinsic impedance. Excitation tests yield the excitation frequency response function. Adopting an impedance matching approach, the control parameters for the resistive and reactive controller are determined from the complex conjugate of the intrinsic impedance. Both controllers are tested for a selection of regular wave conditions. The performed experimental test campaign using an isolated ‘WECfarm’ WEC allows a full evaluation of the WEC design prior to extending the setup to five WECs. Within the ‘WECfarm’ project, an experimental campaign with a five-WEC array in the Coastal and Ocean Basin (COB) in Ostend, Belgium, is under preparation.
- Open Access
- 2 August 2022
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 10 (8) , 1062
Experimental Modelling of Point-Absorber Wave Energy Converter Arrays: A Comprehensive Review, Identification of Research Gaps and Design of the WECfarm Setup
Commercial wave energy exploitation will be realised by placing multiple wave energy converters (WECs) in an array configuration. A point-absorber WEC consists of a floating or submerged body to capture wave energy from different wave directions. This point-absorber WEC acts as an efficient wave absorber that is also an efficient wave generator. Optimising the WEC array layout to obtain constructive interference within the WEC array is theoretically beneficial, whereas for wind farms, it is only important to avoid destructive interference within an array of wind turbines due to wake effects. Moreover, the WEC array layout should be optimised simultaneously with the applied control strategy. This article provides a literature review on the state of the art in physical modelling of point-absorber WEC arrays and the identification of research gaps. To cover the scientific gap of experimental data necessary for the validation of recently developed (nonlinear) numerical models for WEC arrays, Ghent University has introduced the “WECfarm” project. The identified research gaps are translated into design requirements for the “WECfarm” WEC array setup and test matrix. This article presents the design of the “WECfarm” experimental setup, consisting of an array of five generic heaving point-absorber WECs. The WECs are equipped with a permanent magnet synchronous motor (PMSM), addressing the need for WEC array tests with an accurate and actively controllable power take-off (PTO). The WEC array control and data acquisition are realised with a Speedgoat Performance real-time target machine, offering the possibility to implement advanced WEC array control strategies in the MATLAB-Simulink model. Wave basin testing includes long- and short-crested waves and extreme wave conditions, representing real sea conditions. Within the “WECfarm” project, two experimental campaigns were performed at the Aalborg University wave basin: (a) a testing of the first WEC in April 2021 and (b) a testing of a two-WEC array in February 2022. An experimental campaign with a five-WEC array is under preparation at the moment of writing.
- 2 August 2022
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 10 (8) , 1062
Open AccessExperimental Modelling of Point-Absorber Wave Energy Converter Arrays: A Comprehensive Review, Identification of Research Gaps and Design of the WECfarm Setup
Commercial wave energy exploitation will be realised by placing multiple wave energy converters (WECs) in an array configuration. A point-absorber WEC consists of a floating or submerged body to capture wave energy from different wave directions. This point-absorber WEC acts as an efficient wave absorber that is also an efficient wave generator. Optimising the WEC array layout to obtain constructive interference within the WEC array is theoretically beneficial, whereas for wind farms, it is only important to avoid destructive interference within an array of wind turbines due to wake effects. Moreover, the WEC array layout should be optimised simultaneously with the applied control strategy. This article provides a literature review on the state of the art in physical modelling of point-absorber WEC arrays and the identification of research gaps. To cover the scientific gap of experimental data necessary for the validation of recently developed (nonlinear) numerical models for WEC arrays, Ghent University has introduced the “WECfarm” project. The identified research gaps are translated into design requirements for the “WECfarm” WEC array setup and test matrix. This article presents the design of the “WECfarm” experimental setup, consisting of an array of five generic heaving point-absorber WECs. The WECs are equipped with a permanent magnet synchronous motor (PMSM), addressing the need for WEC array tests with an accurate and actively controllable power take-off (PTO). The WEC array control and data acquisition are realised with a Speedgoat Performance real-time target machine, offering the possibility to implement advanced WEC array control strategies in the MATLAB-Simulink model. Wave basin testing includes long- and short-crested waves and extreme wave conditions, representing real sea conditions. Within the “WECfarm” project, two experimental campaigns were performed at the Aalborg University wave basin: (a) a testing of the first WEC in April 2021 and (b) a testing of a two-WEC array in February 2022. An experimental campaign with a five-WEC array is under preparation at the moment of writing.