Ayoub Abdullah Senan Qahtan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Ayoub Abdullah Senan Qahtan has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
- Di Wang
School of Civil Engineering, Central South University, Changsha 410075, China
2 shared publications - Houdou Saidi Boumedienne
School of Civil Engineering, Central South University, Changsha 410075, China
2 shared publications - Weidong Wang
School of Civil Engineering, Central South University, Changsha 410075, China
2 shared publications - Weidong Yuan
School of Civil Engineering, Central South University, Changsha 410075, China
2 shared publications - Xudong Huang
School of Civil Engineering, Central South University, Changsha 410075, China
2 shared publications - Zhiping Zeng
School of Civil Engineering, Central South University, Changsha 410083, China
2 shared publications
Latest Publications
- Open Access
- 16 October 2022
- Published by MDPI AG in Applied Sciences
- Vol. 12 (20) , 10441
Research on Optimization Design of Geometric Parameters of a Novel Frame-Embedded Track (NFET)
A novel frame-embedded track (NFET) with additional beams between the prefabricated rail seats before was proposed, but its geometric parameters need to be further optimized, in order to solve the problem of difficulty in adjustment, due to the independence of the two prefabricated rail seats during the construction of tram. Based on the finite element method, the geometric parameters of the NFET structure are systematically studied and optimized. The research shows: (1) As the width of the beams and the thickness of the lower slab increases, the mechanical characteristics of the NFET structure does not change significantly; therefore, the recommended design reference value for these two are 240 and 80 mm, respectively. (2) When considering the cable and the drainage facilities, the stress state of the NFET structure is less affected (or even improved), which proves that the layout of the cable and the drainage facilities is feasible. (3) According to the analysis during different construction stages, the stress of the NFET rail seats is generally greater than the stress of the cast-in-place concrete. It is recommended that the intensity of the cast-in-place concrete should be greater than that of the prefabricated frame structure.
- 16 October 2022
- Published by MDPI AG in Applied Sciences
- Vol. 12 (20) , 10441
Open AccessResearch on Optimization Design of Geometric Parameters of a Novel Frame-Embedded Track (NFET)
A novel frame-embedded track (NFET) with additional beams between the prefabricated rail seats before was proposed, but its geometric parameters need to be further optimized, in order to solve the problem of difficulty in adjustment, due to the independence of the two prefabricated rail seats during the construction of tram. Based on the finite element method, the geometric parameters of the NFET structure are systematically studied and optimized. The research shows: (1) As the width of the beams and the thickness of the lower slab increases, the mechanical characteristics of the NFET structure does not change significantly; therefore, the recommended design reference value for these two are 240 and 80 mm, respectively. (2) When considering the cable and the drainage facilities, the stress state of the NFET structure is less affected (or even improved), which proves that the layout of the cable and the drainage facilities is feasible. (3) According to the analysis during different construction stages, the stress of the NFET rail seats is generally greater than the stress of the cast-in-place concrete. It is recommended that the intensity of the cast-in-place concrete should be greater than that of the prefabricated frame structure.
- Open Access
- 1 September 2022
- Published by MDPI AG in Applied Sciences
- Vol. 12 (17) , 8807
Numerical Simulation Research on Mechanical Optimization of a Novel Fastener Type Ballastless Track (NFTBT) for Tram
In view of the problems present in the construction process of the embedded track structure of modern tram, we have designed a Novel Fastener Type Ballastless Track (NFTBT) for tram. To optimize the size of the NFTBT’s structure, the finite element model of the NFTBT’s structure in the tram running stage is built, the mechanical characteristics of the NFTBT’s structure are calculated, and the geometric parameters of the NFTBT’s structure are systematically studied. The research results are as follows: (1) As the size of the track slab increases, the displacement differences of the middle part of the NFTBT are similar, and the size of the track slab has little effect on the displacement. (2) The stress difference of the NFTBT’s structure under the different distances between the centers of the adjacent grouting holes’ conditions is small. Although a larger distance between the centers of the adjacent grouting holes can reduce the number of grouting holes in the track slab, the distance should not be too large to reduce the peak stress at the bottom of the NFTBT. (3) When the distance between the adjacent fasteners of the NFTBT changes within a certain range, the rail is greatly affected by the uneven settlement of the subgrade, and the track irregularity will be aggravated. (4) The NFTBT does not require the implementation of cable passages at intervals, which facilitates the passage and fixation of the cables in the tram operation section and can reduce the difficulty of adjusting the geometry of the track structure, thus accelerating the construction progress.
- 1 September 2022
- Published by MDPI AG in Applied Sciences
- Vol. 12 (17) , 8807
Open AccessNumerical Simulation Research on Mechanical Optimization of a Novel Fastener Type Ballastless Track (NFTBT) for Tram
In view of the problems present in the construction process of the embedded track structure of modern tram, we have designed a Novel Fastener Type Ballastless Track (NFTBT) for tram. To optimize the size of the NFTBT’s structure, the finite element model of the NFTBT’s structure in the tram running stage is built, the mechanical characteristics of the NFTBT’s structure are calculated, and the geometric parameters of the NFTBT’s structure are systematically studied. The research results are as follows: (1) As the size of the track slab increases, the displacement differences of the middle part of the NFTBT are similar, and the size of the track slab has little effect on the displacement. (2) The stress difference of the NFTBT’s structure under the different distances between the centers of the adjacent grouting holes’ conditions is small. Although a larger distance between the centers of the adjacent grouting holes can reduce the number of grouting holes in the track slab, the distance should not be too large to reduce the peak stress at the bottom of the NFTBT. (3) When the distance between the adjacent fasteners of the NFTBT changes within a certain range, the rail is greatly affected by the uneven settlement of the subgrade, and the track irregularity will be aggravated. (4) The NFTBT does not require the implementation of cable passages at intervals, which facilitates the passage and fixation of the cables in the tram operation section and can reduce the difficulty of adjusting the geometry of the track structure, thus accelerating the construction progress.