Yunita Nugrahaini Safrudin
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Yunita Nugrahaini Safrudin has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
- Ayudita Oktafiani
School of Industrial Engineering, Telkom University, Jl. Telekomunikasi No. 1, Terusan Buahbatu-Bojongsoang, Sukapura, Kec. Dayeuhkolot, Kabupaten Bandung, Jawa Barat 40257, Indonesia
2 shared publications - Boon Kian Lim
Faculty of Engineering and Technology, Multimedia University, Jalan Ayer Keroh Lama, Bukit Beruang, Melaka 75450, Malaysia
2 shared publications - Kia Wai Liew
Faculty of Engineering and Technology, Multimedia University, Jalan Ayer Keroh Lama, Bukit Beruang, Melaka 75450, Malaysia
2 shared publications - Murman Dwi Prasetio
Telkom University
2 shared publications - Poh Kiat Ng
Faculty of Engineering & Technology, Multimedia University, Melaka, Malaysia
2 shared publications - Sheila Amalia Salma
Telkom University
2 shared publications
Latest Publications
- Open Access
- 4 July 2024
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Ranah Research : Journal of Multidisciplinary Research and Development
- Vol. 6 (5) , 1795-1805
Perancangan Sistem Pengendalian Risiko Menggunakan Simplified Bowtie Analysis pada Fasilitas FSO Federal II di PT XYZ
The oil and gas industry in Indonesia, including PT XYZ which manages domestic oil and gas, faces high complexity and risk. PT XYZ's operations are supported by several offshore platforms and facilities which have various potential risks. Process safety is a top priority to prevent major incidents or major accidents. PT XYZ uses Process Hazard Analysis (PHA) which needs to be revalidated every five years to ensure procedures comply with current conditions. This research focuses on the FSO Federal II facility owned by PT XYZ, a 200 thousand barrel capacity crude oil storage vessel with a high potential risk of major incidents. PT XYZ uses the HAZOP and HAZID methods in PHA to identify risks. However, PT XYZ does not yet have a direct control system for workers. This research aims to create a risk control system that can be used by Federal II FSO workers as a work guide. This work guide will help in handling undesirable events that have the potential to cause major incidents. Proposed improvements include creating a work guidance document based on risk identification using Bowtie Analysis, which produces a mapping diagram of causes, peak events, hazards and consequences. The bowtie diagram will be simplified to make things easier for workers, considering the large number of processes in FSO Federal II. This guideline will help workers prevent major incidents from occurring.
- 4 July 2024
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Ranah Research : Journal of Multidisciplinary Research and Development
- Vol. 6 (5) , 1795-1805
Open AccessPerancangan Sistem Pengendalian Risiko Menggunakan Simplified Bowtie Analysis pada Fasilitas FSO Federal II di PT XYZ
The oil and gas industry in Indonesia, including PT XYZ which manages domestic oil and gas, faces high complexity and risk. PT XYZ's operations are supported by several offshore platforms and facilities which have various potential risks. Process safety is a top priority to prevent major incidents or major accidents. PT XYZ uses Process Hazard Analysis (PHA) which needs to be revalidated every five years to ensure procedures comply with current conditions. This research focuses on the FSO Federal II facility owned by PT XYZ, a 200 thousand barrel capacity crude oil storage vessel with a high potential risk of major incidents. PT XYZ uses the HAZOP and HAZID methods in PHA to identify risks. However, PT XYZ does not yet have a direct control system for workers. This research aims to create a risk control system that can be used by Federal II FSO workers as a work guide. This work guide will help in handling undesirable events that have the potential to cause major incidents. Proposed improvements include creating a work guidance document based on risk identification using Bowtie Analysis, which produces a mapping diagram of causes, peak events, hazards and consequences. The bowtie diagram will be simplified to make things easier for workers, considering the large number of processes in FSO Federal II. This guideline will help workers prevent major incidents from occurring.
- Open Access
A TRIZ-Supported Concept and Protocol Development for Roof Tile Transportation and Inspection Systems
Currently, the use of manual labour in the transportation and inspection systems of leading roof tile manufacturing companies in Indonesia is still prevalent. Manual labour is usually labour-intensive, has higher risks of musculoskeletal disorders, and produces frequent occurrences of errors and losses. Furthermore, the current studies of suitable concepts and test protocols for roof tile transportation at the manufacturing stage as well as their inspection systems are not practicable in Indonesia. There is also no study that has used the theory of inventive problem-solving (TRIZ) in the development of concepts and protocols for roof tile transportation and inspection systems. Using TRIZ as a supporting tool, this study investigated the development of a transportation system to be employed during the manufacturing of the roof tile and a test protocol for their usability in Indonesian companies to overcome this concern. The study included screening and scoring concepts and usability test protocols identified from the existing literature, with the support of TRIZ tools such as the engineering contradiction, contradiction matrix, and inventive principles. Thus, the finalised concept comprised a belt conveyor system (Inventive Principle 20: Continuity of Useful Action) with a flipping mechanism for transportation and a vision-based camera for inspection. Results of the study showed that the concept excelled in cost, durability, reliability, versatility, low risk to the product, efficiency, and safety. The t-test protocol (Inventive Principle 23: Feedback) was selected based on the results due to its versatility in testing efficiency, reliability, and productivity. It was concluded that this concept has the potential to alleviate roof tile workers of physical work and reduce the prevalence of musculoskeletal disorders.
Open AccessA TRIZ-Supported Concept and Protocol Development for Roof Tile Transportation and Inspection Systems
Currently, the use of manual labour in the transportation and inspection systems of leading roof tile manufacturing companies in Indonesia is still prevalent. Manual labour is usually labour-intensive, has higher risks of musculoskeletal disorders, and produces frequent occurrences of errors and losses. Furthermore, the current studies of suitable concepts and test protocols for roof tile transportation at the manufacturing stage as well as their inspection systems are not practicable in Indonesia. There is also no study that has used the theory of inventive problem-solving (TRIZ) in the development of concepts and protocols for roof tile transportation and inspection systems. Using TRIZ as a supporting tool, this study investigated the development of a transportation system to be employed during the manufacturing of the roof tile and a test protocol for their usability in Indonesian companies to overcome this concern. The study included screening and scoring concepts and usability test protocols identified from the existing literature, with the support of TRIZ tools such as the engineering contradiction, contradiction matrix, and inventive principles. Thus, the finalised concept comprised a belt conveyor system (Inventive Principle 20: Continuity of Useful Action) with a flipping mechanism for transportation and a vision-based camera for inspection. Results of the study showed that the concept excelled in cost, durability, reliability, versatility, low risk to the product, efficiency, and safety. The t-test protocol (Inventive Principle 23: Feedback) was selected based on the results due to its versatility in testing efficiency, reliability, and productivity. It was concluded that this concept has the potential to alleviate roof tile workers of physical work and reduce the prevalence of musculoskeletal disorders.
- Open Access
- 1 January 2023
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2693 (1)
Design of proposed improvement of calendering process on cotton carded 24S production at PT XYZ with the DMAI approach
PT. XYZ is a company engaged in the field of Textile and Textile Product (TPT) which focuses on the dyeing process. Based on data obtained from January 2017 – June 2019 so there is 11 months of production exceeded the defect tolerance, while the tolerance was set at 2% by the company. So, it can be assumed that the process has not proceeded properly. One of the process stages on produce cotton carded 24S is the calendering process. This research is focusing on providing a proposed improvement plan for the calendering process with the DMAI approach. The first stage is the Define stage, which identifies the Critical to Quality product, Process Flow, Critical to process so that the requirements that have not been met can be identified. The second stage is the Measure stage which calculates the performance of the production process, and it is resulting the sigma level for the Cotton Carded 24S product is 4.496 sigma. The third stage is the analysis stage using several tools such as Fishbone Diagrams, 5 Why’s, and continued by calculating the Risk Priority Number (RPN) on the Failure Mode Effect Analysis (FMEA). The fourth stage is the Improve stage where the proposed improvement is designed based on the Risk Priority Number. The design of the proposed improvements to the calendering process is carried out in an integrated manner, namely making a steam temperature warning alarm system, work instructions with visual displays, and check sheets for Zigar tools.
- 1 January 2023
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2693 (1)
Open AccessDesign of proposed improvement of calendering process on cotton carded 24S production at PT XYZ with the DMAI approach
PT. XYZ is a company engaged in the field of Textile and Textile Product (TPT) which focuses on the dyeing process. Based on data obtained from January 2017 – June 2019 so there is 11 months of production exceeded the defect tolerance, while the tolerance was set at 2% by the company. So, it can be assumed that the process has not proceeded properly. One of the process stages on produce cotton carded 24S is the calendering process. This research is focusing on providing a proposed improvement plan for the calendering process with the DMAI approach. The first stage is the Define stage, which identifies the Critical to Quality product, Process Flow, Critical to process so that the requirements that have not been met can be identified. The second stage is the Measure stage which calculates the performance of the production process, and it is resulting the sigma level for the Cotton Carded 24S product is 4.496 sigma. The third stage is the analysis stage using several tools such as Fishbone Diagrams, 5 Why’s, and continued by calculating the Risk Priority Number (RPN) on the Failure Mode Effect Analysis (FMEA). The fourth stage is the Improve stage where the proposed improvement is designed based on the Risk Priority Number. The design of the proposed improvements to the calendering process is carried out in an integrated manner, namely making a steam temperature warning alarm system, work instructions with visual displays, and check sheets for Zigar tools.
- Open Access
A TRIZ-Inspired Conceptual Development of a Roof Tile Transportation and Inspection System
The Indonesian roof tile manufacturing industry relies heavily on manual operations, specifically in transportation and inspection processes, which creates multiple issues, such as fatigue, injuries, human error, and reduced productivity. Various industries in the Indonesian industrial landscape have begun embracing a problem-solving approach known as the theory of inventive problem-solving (TRIZ) to mine solutions for industrial issues. Nevertheless, its application in the Indonesian roof tile manufacturing industry remains unaddressed. The study aims to solve manual handling issues in the roof tile manufacturing industry using TRIZ. Three observations were outlined from manual roof tile transportation and inspection, followed by the formulation of engineering contradictions (ECs). The ECs were linked with system parameters, which were used as indicators within the contradiction matrix to extract inventive principles as solution models for conceptual development. The concept included an automated system with a conveyor belt (#15: dynamics) for effective transportation, automated image capture (#28: mechanics substitution) for effective inspection, and a flipping conveyor (#25: self-service) to eliminate manual contact. Although the study addressed several issues stemming from manual operations, mechanical analysis, prototyping, and usability testing still require improvements.
Open AccessA TRIZ-Inspired Conceptual Development of a Roof Tile Transportation and Inspection System
The Indonesian roof tile manufacturing industry relies heavily on manual operations, specifically in transportation and inspection processes, which creates multiple issues, such as fatigue, injuries, human error, and reduced productivity. Various industries in the Indonesian industrial landscape have begun embracing a problem-solving approach known as the theory of inventive problem-solving (TRIZ) to mine solutions for industrial issues. Nevertheless, its application in the Indonesian roof tile manufacturing industry remains unaddressed. The study aims to solve manual handling issues in the roof tile manufacturing industry using TRIZ. Three observations were outlined from manual roof tile transportation and inspection, followed by the formulation of engineering contradictions (ECs). The ECs were linked with system parameters, which were used as indicators within the contradiction matrix to extract inventive principles as solution models for conceptual development. The concept included an automated system with a conveyor belt (#15: dynamics) for effective transportation, automated image capture (#28: mechanics substitution) for effective inspection, and a flipping conveyor (#25: self-service) to eliminate manual contact. Although the study addressed several issues stemming from manual operations, mechanical analysis, prototyping, and usability testing still require improvements.