Григорий Алексеевич Иовлев
Григорий Алексеевич Иовлев has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
- Alisa Ageeva
Construction of Mining Enterprises and Underground Structures Department, Empress Catherine II Saint-Petersburg Mining University, 199106 St. Petersburg, Russia
1 shared publication - Anatoliy Grigoryevich Protosenya
Saint-Petersburg Mining University
1 shared publication - Andrey M. Katerov
Saint-Petersburg Mining University
1 shared publication - Anna Andreeva
Department of Construction of Mining Enterprises and Underground Structures, Empress Catherine II St. Petersburg Mining University, 21st Line 2, 199106 St. Petersburg, Russia
1 shared publication G. D. Pavlenko
Saint Petersburg Mining University
1 shared publicationN. E. Petrov
Saint Petersburg Mining University
1 shared publication
Latest Publications
- Open Access
- 11 May 2026
- Published by MDPI AG in Geotechnics
- Vol. 6 (2) , 45
Concrete Damage Plasticity Model Application to Predict Stress–Strain Behavior of Impermeable Strata in Deep Rock Salt Deposits
Maintaining the integrity of impermeable strata between mine workings and overlying aquifers is critical, because seepage pathways may cause mine flooding and surface subsidence. In the Upper Kama potash deposit, the impermeable sequence is a 50–140 m thick layered sequence of evaporites and clays overlying mined-out chambers. Under long-term loading, salt rocks tend to creep, soften, and localize damage, which can cause failure in the impermeable strata. In this paper, the Concrete damage-plasticity model, supplemented by the N2PC-MCT viscoplastic creep model, is applied to simulate the initiation and evolution of seepage pathways in the Upper Kama impermeable strata. Model parameters are obtained from published laboratory tests (uniaxial and triaxial compression and tension) and validated using observed ground-surface subsidence. A plane-strain finite-element model incorporates the stratified lithology, interface elements between layers, and sequential excavation. Long-term simulations up to 50 years investigate two operational scenarios: with and without backfilling. The calibrated model reproduces the main stages of surface subsidence and chamber closure. Without backfilling, simulations indicate that tensile damage localizes mainly in a stiff central salt layer of the impermeable strata, with most cracks appearing approximately between 33 and 37 years after the start of mining. With backfill, tensile crack propagation stops and damage remains stable. A hypothetical homogeneous impermeable strata case confirms that the observed central-layer cracking is associated with stiffness contrasts and composite bending in the stratified system. An approximate analytical multilayer beam solution, based on energy minimization, predicts bending stress concentration in stiff intermediate layers and is consistent with the numerical stress distribution. The combined numerical and analytical results provide insight into the mechanisms of long-term conductive fracture initiation in stratified impermeable strata and may serve as a basis for preliminary hazard indication and for planning mitigation measures, including backfilling and focused monitoring of stiff central layers. Because the study is based on a 2D plane-strain model, the quantitative estimates should be regarded as preliminary and require verification by 3D modelling and further field observations.
- 11 May 2026
- Published by MDPI AG in Geotechnics
- Vol. 6 (2) , 45
Open AccessConcrete Damage Plasticity Model Application to Predict Stress–Strain Behavior of Impermeable Strata in Deep Rock Salt Deposits
Maintaining the integrity of impermeable strata between mine workings and overlying aquifers is critical, because seepage pathways may cause mine flooding and surface subsidence. In the Upper Kama potash deposit, the impermeable sequence is a 50–140 m thick layered sequence of evaporites and clays overlying mined-out chambers. Under long-term loading, salt rocks tend to creep, soften, and localize damage, which can cause failure in the impermeable strata. In this paper, the Concrete damage-plasticity model, supplemented by the N2PC-MCT viscoplastic creep model, is applied to simulate the initiation and evolution of seepage pathways in the Upper Kama impermeable strata. Model parameters are obtained from published laboratory tests (uniaxial and triaxial compression and tension) and validated using observed ground-surface subsidence. A plane-strain finite-element model incorporates the stratified lithology, interface elements between layers, and sequential excavation. Long-term simulations up to 50 years investigate two operational scenarios: with and without backfilling. The calibrated model reproduces the main stages of surface subsidence and chamber closure. Without backfilling, simulations indicate that tensile damage localizes mainly in a stiff central salt layer of the impermeable strata, with most cracks appearing approximately between 33 and 37 years after the start of mining. With backfill, tensile crack propagation stops and damage remains stable. A hypothetical homogeneous impermeable strata case confirms that the observed central-layer cracking is associated with stiffness contrasts and composite bending in the stratified system. An approximate analytical multilayer beam solution, based on energy minimization, predicts bending stress concentration in stiff intermediate layers and is consistent with the numerical stress distribution. The combined numerical and analytical results provide insight into the mechanisms of long-term conductive fracture initiation in stratified impermeable strata and may serve as a basis for preliminary hazard indication and for planning mitigation measures, including backfilling and focused monitoring of stiff central layers. Because the study is based on a 2D plane-strain model, the quantitative estimates should be regarded as preliminary and require verification by 3D modelling and further field observations.
- 1 January 2022
- Published by LLC Gornaya Kniga in Mining informational and analytical bulletin
- No. 6-2,p. 60-79
Application of information modeling technologies for surveying support of mining operations
- 1 January 2022
- Published by LLC Gornaya Kniga in Mining informational and analytical bulletin
- No. 6-2,p. 60-79
Application of information modeling technologies for surveying support of mining operations
- 1 April 2021
- Published by Saint Petersburg State University of Architecture and Civil Engineering (SPSUACE)
BIM-технологии при проектировании пересадочного станционного комплекса метрополитена
В работе представлены некоторые возможности и преимущества BIM-технологий при проектировании основных объемно-планировочных и конструктивных решений пересадочных станционных комплексов метрополитена по сравнению с традиционным 2D-проектированием. В программном комплексе Autodesk Revit создана BIM-модель строящейся станции Путиловская Красносельско-Калининской линии и пересадочный узел Путиловская-Кировский завод Санкт-Петербургского метрополитена. В программном комплексе Autodesk Navisworks выполнялось 4D-моделирование участка станции с отслеживанием хода строительства по календарному плану возведения платформенного узла, а также проводилась проверка на коллизии. Установлен ряд особенностей использования BIM-технологии при работе с подземными сооружениями метрополитенов.
- 1 April 2021
- Published by Saint Petersburg State University of Architecture and Civil Engineering (SPSUACE)
BIM-технологии при проектировании пересадочного станционного комплекса метрополитена
В работе представлены некоторые возможности и преимущества BIM-технологий при проектировании основных объемно-планировочных и конструктивных решений пересадочных станционных комплексов метрополитена по сравнению с традиционным 2D-проектированием. В программном комплексе Autodesk Revit создана BIM-модель строящейся станции Путиловская Красносельско-Калининской линии и пересадочный узел Путиловская-Кировский завод Санкт-Петербургского метрополитена. В программном комплексе Autodesk Navisworks выполнялось 4D-моделирование участка станции с отслеживанием хода строительства по календарному плану возведения платформенного узла, а также проводилась проверка на коллизии. Установлен ряд особенностей использования BIM-технологии при работе с подземными сооружениями метрополитенов.