Xiaotian Liu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Xiaotian Liu has a total of 14 co-authors. Here are the top co-authors by number of shared publications:
- Jianxiu Wang
College of Civil Engineering, Tongji University, Shanghai, China
4 shared publications - Yanxia Long
College of Civil Engineering, Tongji University, Shanghai 200092, China
3 shared publications - Ansheng Cao
College of Civil Engineering, Tongji University, Shanghai 200092, China
2 shared publications - Huboqiang Li
College of Civil Engineering, Tongji University, Shanghai 200092, China
2 shared publications - Jianxun Qu
Shanghai Tunnel Engineering Company Co., Ltd., Shanghai 200082, China
2 shared publications - Lihua Lin
Xiamen Road and Bridge Construction Group Company Ltd., Xiamen 361026, China
2 shared publications
Latest Publications
- Open Access
- 1 January 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (1) , 601
Numerical Simulation of Forming MICP Horizontal Seepage Reducing Body in Confined Aquifer for Deep Excavation
The drawdown outside of a deep foundation pit has to be controlled during excavation. However, the vertical curtain cannot cutoff a deep and thick confined aquifer during deep excavation. In this study, a microbial-induced carbonate precipitation (MICP) horizontal seepage reducing body (HSRB) was proposed to control drawdown combined with a partially penetrating curtain. MICP HSRB is formed by using the seepage field generated by the recharge wells to drive the migration of a Sporosarcina pasteurii solution, stationary solution, and cementation solution into the deep confined aquifer. The migration of each solution was numerically simulated to study the HSRB formation process. The influence of different factors on solute migration was studied. The results show that the solutes in the fixed fluid and cementation fluid can reach the area under the driving of the seepage field, which proves that MICP HSRB can be formed. The calcium ions and urea in the cementation solution are more likely to migrate to the designated area than the bacterial solution. Increasing the injection rate of bacterial solution and adding recharge wells both made the bacterial solution migrate more quickly to the designated area. In the case of multiple grouting, the solute migration in the later stage will be hindered by the plugging of pores caused by calcium carbonate generated in the earlier stage. Therefore, different grouting methods need to be designed to drive the seepage field so that the solute injected in the later stage can continue to migrate. The MICP HSRB grouting technology can be used in foundation pit dewatering, providing reference for similar engineering.
- 1 January 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (1) , 601
Open AccessNumerical Simulation of Forming MICP Horizontal Seepage Reducing Body in Confined Aquifer for Deep Excavation
The drawdown outside of a deep foundation pit has to be controlled during excavation. However, the vertical curtain cannot cutoff a deep and thick confined aquifer during deep excavation. In this study, a microbial-induced carbonate precipitation (MICP) horizontal seepage reducing body (HSRB) was proposed to control drawdown combined with a partially penetrating curtain. MICP HSRB is formed by using the seepage field generated by the recharge wells to drive the migration of a Sporosarcina pasteurii solution, stationary solution, and cementation solution into the deep confined aquifer. The migration of each solution was numerically simulated to study the HSRB formation process. The influence of different factors on solute migration was studied. The results show that the solutes in the fixed fluid and cementation fluid can reach the area under the driving of the seepage field, which proves that MICP HSRB can be formed. The calcium ions and urea in the cementation solution are more likely to migrate to the designated area than the bacterial solution. Increasing the injection rate of bacterial solution and adding recharge wells both made the bacterial solution migrate more quickly to the designated area. In the case of multiple grouting, the solute migration in the later stage will be hindered by the plugging of pores caused by calcium carbonate generated in the earlier stage. Therefore, different grouting methods need to be designed to drive the seepage field so that the solute injected in the later stage can continue to migrate. The MICP HSRB grouting technology can be used in foundation pit dewatering, providing reference for similar engineering.
- Open Access
- 28 December 2022
- Published by MDPI AG in Applied Sciences
- Vol. 13 (1) , 406
Numerical Stability Analysis of Large Section Tunnels Using the Double-Side Heading Method: A Case Study of Xiamen Haicang Evacuate-Channel
Large section tunnels have huge excavation spans, complex excavation procedures, mutual influence among various procedures, multiple disturbances of the surrounding rock, and discontinuous connection among linings under different procedures, which bring great difficulties to their construction. The Caijianwei Mountain No. 2 tunnel of the Xiamen Haicang Evacuate-channel project in China belongs to a super large section tunnel. The tunnel’s maximum excavation section span reaches 30.52 m, and the excavation area reaches 421.73 m2. Its excavation sequence, the timing of the second primary lining support, temporary support disassembly, and secondary lining support of the double-side heading method were analyzed using numerical methods. The excavation sequence of the double side-heading method from the right pilot tunnel to the left pilot tunnel and then to the middle pilot tunnel can avoid a large horizontal displacement at the arch waist and control the deformation of the lining. The excavation sequence from the middle pilot tunnel to the two side pilot tunnels was conducive to the bearing performance of the concrete at the arch crown. The excavation sequence from the two side pilot tunnels to the middle pilot tunnel can better protect the concrete safety at the arch waist. The timing of the second primary lining support, temporary support removal, and secondary lining support have different effects on the deformation and stress of the surrounding rock and support structures. In the construction process, the timing of the second primary lining support, temporary support disassembly, and secondary lining support should be determined according to the actual deformation and stress of the site section. The research results can provide a reference for the construction design of the double-side heading method for large section tunnels.
- 28 December 2022
- Published by MDPI AG in Applied Sciences
- Vol. 13 (1) , 406
Open AccessNumerical Stability Analysis of Large Section Tunnels Using the Double-Side Heading Method: A Case Study of Xiamen Haicang Evacuate-Channel
Large section tunnels have huge excavation spans, complex excavation procedures, mutual influence among various procedures, multiple disturbances of the surrounding rock, and discontinuous connection among linings under different procedures, which bring great difficulties to their construction. The Caijianwei Mountain No. 2 tunnel of the Xiamen Haicang Evacuate-channel project in China belongs to a super large section tunnel. The tunnel’s maximum excavation section span reaches 30.52 m, and the excavation area reaches 421.73 m2. Its excavation sequence, the timing of the second primary lining support, temporary support disassembly, and secondary lining support of the double-side heading method were analyzed using numerical methods. The excavation sequence of the double side-heading method from the right pilot tunnel to the left pilot tunnel and then to the middle pilot tunnel can avoid a large horizontal displacement at the arch waist and control the deformation of the lining. The excavation sequence from the middle pilot tunnel to the two side pilot tunnels was conducive to the bearing performance of the concrete at the arch crown. The excavation sequence from the two side pilot tunnels to the middle pilot tunnel can better protect the concrete safety at the arch waist. The timing of the second primary lining support, temporary support removal, and secondary lining support have different effects on the deformation and stress of the surrounding rock and support structures. In the construction process, the timing of the second primary lining support, temporary support disassembly, and secondary lining support should be determined according to the actual deformation and stress of the site section. The research results can provide a reference for the construction design of the double-side heading method for large section tunnels.
- Open Access
- 25 December 2022
- Published by MDPI AG in Applied Sciences
- Vol. 13 (1) , 254
Mechanical Behavior and Excavation Optimization of a Small Clear-Distance Tunnel in an Urban Super Large and Complex Underground Interchange Hub
Close excavation section spacing, the mutual influence and interpenetration of various processes, and the multiple disturbances of the middle rock pillar in a small clear-distance tunnel pose great difficulty to construction. This study adopted the small clear-distance tunnel of Xiamen Haicang Evacuate Channel as the research object. The tunnel belonged to a small clear-distance tunnel in an urban super large and complex underground interchange hub where complex adjacent small clear-distance tunnels were adopted. ABAQUS was used to analyze the influence of different excavation schemes, lithological grades, and footage lengths for tunnel stability. The deformation and stress characteristics of the tunnel’s surrounding rock and lining structure in different excavation schemes (full section method, bench method, center diaphragm (CD) method, and double wall heading method), lithological grades (III, IV and V), and footage lengths (3 m, 4 m and 5 m) were introduced. The results showed that the double wall heading method could effectively control the horizontal displacement of the hance, and the overall stress state of the lining in the CD and double wall heading methods were reasonable. The vertical displacement of the surface and vault was positively correlated with the elastic modulus of the rock mass. When no temporary support was present in the grade V rock mass, the area from the hance to the arch foot was prone to large deformation. Reducing the footage was beneficial to controlling the deformation of the vault and hance. This study can provide a reference for the on-site construction of small clear-distance tunnels.
- 25 December 2022
- Published by MDPI AG in Applied Sciences
- Vol. 13 (1) , 254
Open AccessMechanical Behavior and Excavation Optimization of a Small Clear-Distance Tunnel in an Urban Super Large and Complex Underground Interchange Hub
Close excavation section spacing, the mutual influence and interpenetration of various processes, and the multiple disturbances of the middle rock pillar in a small clear-distance tunnel pose great difficulty to construction. This study adopted the small clear-distance tunnel of Xiamen Haicang Evacuate Channel as the research object. The tunnel belonged to a small clear-distance tunnel in an urban super large and complex underground interchange hub where complex adjacent small clear-distance tunnels were adopted. ABAQUS was used to analyze the influence of different excavation schemes, lithological grades, and footage lengths for tunnel stability. The deformation and stress characteristics of the tunnel’s surrounding rock and lining structure in different excavation schemes (full section method, bench method, center diaphragm (CD) method, and double wall heading method), lithological grades (III, IV and V), and footage lengths (3 m, 4 m and 5 m) were introduced. The results showed that the double wall heading method could effectively control the horizontal displacement of the hance, and the overall stress state of the lining in the CD and double wall heading methods were reasonable. The vertical displacement of the surface and vault was positively correlated with the elastic modulus of the rock mass. When no temporary support was present in the grade V rock mass, the area from the hance to the arch foot was prone to large deformation. Reducing the footage was beneficial to controlling the deformation of the vault and hance. This study can provide a reference for the on-site construction of small clear-distance tunnels.
- Open Access
- 22 December 2022
- Published by MDPI AG in Applied Sciences
- Vol. 13 (1) , 104
Laboratory Experiment on Formation of MICP Horizontal Seepage-Reducing Body in Confined Aquifer for Deep Excavation
Using a soil improvement biotechnology based on microbial-induced carbonate precipitation (MICP) to form a horizontal water barrier in foundation pit dewatering can not only achieve a good dewatering control effect, but also control the cost and obtain good economic and environmental benefits. In this study, taking the Shanghai layer ⑨ sand as the research object, the solution injected into the layer ⑨ sand by MICP grouting technology includes bacterial solution (Sporosarcina pasteurii) and cementation solution (urea and CaCl2 solution). The migration mechanism of the bacterial solution and cementation solution in groundwater was analyzed through batch experiment and column test, and the mathematical model of migration was established. The dynamic adsorption characteristics of the S. pasteurii, Ca2+, and urea were obtained by dynamic adsorption test. Through isothermal adsorption test, the Freundlich isotherm was used to describe the isothermal adsorption of S. pasteurii onto fine sand, and the partition coefficient of the S. pasteurii was found to be 1.5 × 10−7 L/mg. The Langmuir isotherm can be used truly reflect the isothermal adsorption of Ca2+ onto fine sand. The distribution coefficient of the Ca2+ was 7 × 10−8 L/mg. The maximum adsorption capacity of the solute was 2404.8 mg/kg. The adsorption capacity of the urea was very small. According to the sand column test, the vertical dispersion was 11.5 cm. Due to the obvious size effect of dispersion, the sensitivity of dispersion in actual working conditions should be analyzed in a subsequent numerical simulation. The determined solute transport parameters provide support for the further study of the numerical simulation of the solute transport process of the HSRB formed by MICP grouting technology and provide a basis for further field application.
- 22 December 2022
- Published by MDPI AG in Applied Sciences
- Vol. 13 (1) , 104
Open AccessLaboratory Experiment on Formation of MICP Horizontal Seepage-Reducing Body in Confined Aquifer for Deep Excavation
Using a soil improvement biotechnology based on microbial-induced carbonate precipitation (MICP) to form a horizontal water barrier in foundation pit dewatering can not only achieve a good dewatering control effect, but also control the cost and obtain good economic and environmental benefits. In this study, taking the Shanghai layer ⑨ sand as the research object, the solution injected into the layer ⑨ sand by MICP grouting technology includes bacterial solution (Sporosarcina pasteurii) and cementation solution (urea and CaCl2 solution). The migration mechanism of the bacterial solution and cementation solution in groundwater was analyzed through batch experiment and column test, and the mathematical model of migration was established. The dynamic adsorption characteristics of the S. pasteurii, Ca2+, and urea were obtained by dynamic adsorption test. Through isothermal adsorption test, the Freundlich isotherm was used to describe the isothermal adsorption of S. pasteurii onto fine sand, and the partition coefficient of the S. pasteurii was found to be 1.5 × 10−7 L/mg. The Langmuir isotherm can be used truly reflect the isothermal adsorption of Ca2+ onto fine sand. The distribution coefficient of the Ca2+ was 7 × 10−8 L/mg. The maximum adsorption capacity of the solute was 2404.8 mg/kg. The adsorption capacity of the urea was very small. According to the sand column test, the vertical dispersion was 11.5 cm. Due to the obvious size effect of dispersion, the sensitivity of dispersion in actual working conditions should be analyzed in a subsequent numerical simulation. The determined solute transport parameters provide support for the further study of the numerical simulation of the solute transport process of the HSRB formed by MICP grouting technology and provide a basis for further field application.