Grigor Gabayan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Grigor Gabayan has a total of 17 co-authors. Here are the top co-authors by number of shared publications:
- Vache Tokmajyan
Institute of Water Problems and Hydro-Engineering Named After I.V. Yeghiazarov
3 shared publications - Eleonora Avanesyan
National University of Architecture and Construction of Armenia
2 shared publications - Gagik Martirosyan
Institute of Water Problems and Hydro-Engineering Named After I.V. Yeghiazarov
2 shared publications - Hovhannes Tokmajyan
Institute of Water Problems and Hydro-Engineering Named After I.V. Yeghiazarov
2 shared publications - Albert Margaryan
Institute of Water Problems and Hydro-Engineering Named After I.V. Yeghiazarov
1 shared publication - Armen Babayan
Institute of Water Problems and Hydro-Engineering Named After I.V. Yeghiazarov
1 shared publication
Latest Publications
- 29 July 2025
- Published by Armenian National Association of Hydraulic Research NGO in BULLETIN OF HIGH TECHNOLOGY
- p. 3-26
ECONOMIC DAMAGE FROM ACCIDENTS AT HYDRAULIC STRUCTURES – WORLD EXPERIENCE AND PREVENTIVE METHODS OF PROTECTION IN THE REPUBLIC OF ARMENIA
Hydraulic failures are a global problem where engineering, ecology, economics and social responsibility intersect. Development of monitoring technologies, improvement of design solutions and implementation of international safety standards are the key to reducing risks and protecting the population. Given the large number of dams existing in the world, the safe operation of these structures takes on important social, economic and environmental significance. A dam failure can have extremely negative consequences, including large human casualties. For countries with a large number of dams, the issue of ensuring their safety becomes especially acute. The failure of dams and other hydraulic structures causes enormous economic losses, including the costs of rebuilding infrastructure, eliminating the consequences of floods, compensating for damage to property and businesses, as well as long-term environmental costs and the costs of economic recovery. Physical modelling is a powerful tool that can be used at the end of the design phase to check that all the design criteria have been met and thus guarantee the long-term structural soundness of the structures and ensure that they will function efficiently from the hydraulic standpoint, whatever the conditions. Physical modeling is also very useful in the rehabilitation of hydraulic structures after accidents.
- 29 July 2025
- Published by Armenian National Association of Hydraulic Research NGO in BULLETIN OF HIGH TECHNOLOGY
- p. 3-26
ECONOMIC DAMAGE FROM ACCIDENTS AT HYDRAULIC STRUCTURES – WORLD EXPERIENCE AND PREVENTIVE METHODS OF PROTECTION IN THE REPUBLIC OF ARMENIA
Hydraulic failures are a global problem where engineering, ecology, economics and social responsibility intersect. Development of monitoring technologies, improvement of design solutions and implementation of international safety standards are the key to reducing risks and protecting the population. Given the large number of dams existing in the world, the safe operation of these structures takes on important social, economic and environmental significance. A dam failure can have extremely negative consequences, including large human casualties. For countries with a large number of dams, the issue of ensuring their safety becomes especially acute. The failure of dams and other hydraulic structures causes enormous economic losses, including the costs of rebuilding infrastructure, eliminating the consequences of floods, compensating for damage to property and businesses, as well as long-term environmental costs and the costs of economic recovery. Physical modelling is a powerful tool that can be used at the end of the design phase to check that all the design criteria have been met and thus guarantee the long-term structural soundness of the structures and ensure that they will function efficiently from the hydraulic standpoint, whatever the conditions. Physical modeling is also very useful in the rehabilitation of hydraulic structures after accidents.
- 29 April 2025
- Published by Armenian National Association of Hydraulic Research NGO in BULLETIN OF HIGH TECHNOLOGY
- p. 54-61
EVALUATION OF SETTLEMENTS OF THE VEDI DAM DURING CONSTRUCTION AND PREDICTION OF SETTLEMENTS DURING THE OPERATION PERIOD
The aim of this study is to assess the potential settlements of the crest of the Vedi Dam based on field observations during the construction period. The results indicate that dam settlements follow an asymptotically decreasing trend over time. After 1000–1200 days from the placement of a layer, the settlements amount to approximately 5% of the total construction-period settlements, effectively tapering off. Based on prior findings, it is concluded that the expected maximum settlements during the construction period, even under a linear (upper-bound) forecast, will total 128.5 cm. Therefore, by the end of construction, the remaining settlements are estimated to be about 6 cm, a value that can be considered insignificant. Field monitoring results from inclinometers show classical compliance with theoretical studies in the field. This suggests high construction quality of the dam embankment and indicates no expected anomalies in settlement during the operational period. The dam embankment was constructed slowly-for about six years -which contributed to significant self-compaction of the dam body. It can be concluded that actual operational settlements will not exceed those calculated using the Lawton-Lester formula and will remain within a limit of 81 cm.
- 29 April 2025
- Published by Armenian National Association of Hydraulic Research NGO in BULLETIN OF HIGH TECHNOLOGY
- p. 54-61
EVALUATION OF SETTLEMENTS OF THE VEDI DAM DURING CONSTRUCTION AND PREDICTION OF SETTLEMENTS DURING THE OPERATION PERIOD
The aim of this study is to assess the potential settlements of the crest of the Vedi Dam based on field observations during the construction period. The results indicate that dam settlements follow an asymptotically decreasing trend over time. After 1000–1200 days from the placement of a layer, the settlements amount to approximately 5% of the total construction-period settlements, effectively tapering off. Based on prior findings, it is concluded that the expected maximum settlements during the construction period, even under a linear (upper-bound) forecast, will total 128.5 cm. Therefore, by the end of construction, the remaining settlements are estimated to be about 6 cm, a value that can be considered insignificant. Field monitoring results from inclinometers show classical compliance with theoretical studies in the field. This suggests high construction quality of the dam embankment and indicates no expected anomalies in settlement during the operational period. The dam embankment was constructed slowly-for about six years -which contributed to significant self-compaction of the dam body. It can be concluded that actual operational settlements will not exceed those calculated using the Lawton-Lester formula and will remain within a limit of 81 cm.
- 30 December 2024
- Published by Armenian National Association of Hydraulic Research NGO in BULLETIN OF HIGH TECHNOLOGY
- p. 35-48
THE PROBLEMS OF INCREASING THE EFFICIENCY OF OPERATION OF THE RIGHT CHANNEL OF THE AKHURYAN RIVER
A distinctive feature of mountain rivers are significant riverbed slopes, alluvial channels, sometimes composed of boulders and rock fragments, steep banks and the presence of rapids and rapids. In such conditions, it is sometimes impossible to build ladder fish passages, the average slope of which is very often less than the slope of the riverbed. Meanwhile, these rivers are currently the most attractive for the construction of small hydroelectric power plants of the derivational type. Studies of more than 120 designs of existing fish channels at the water intakes of small mountain rivers in different countries show that the design solutions and geometric dimensions of their execution, as a rule, do not ensure the free migration of fish upstream.
- 30 December 2024
- Published by Armenian National Association of Hydraulic Research NGO in BULLETIN OF HIGH TECHNOLOGY
- p. 35-48
THE PROBLEMS OF INCREASING THE EFFICIENCY OF OPERATION OF THE RIGHT CHANNEL OF THE AKHURYAN RIVER
A distinctive feature of mountain rivers are significant riverbed slopes, alluvial channels, sometimes composed of boulders and rock fragments, steep banks and the presence of rapids and rapids. In such conditions, it is sometimes impossible to build ladder fish passages, the average slope of which is very often less than the slope of the riverbed. Meanwhile, these rivers are currently the most attractive for the construction of small hydroelectric power plants of the derivational type. Studies of more than 120 designs of existing fish channels at the water intakes of small mountain rivers in different countries show that the design solutions and geometric dimensions of their execution, as a rule, do not ensure the free migration of fish upstream.
- 30 December 2024
- Published by Armenian National Association of Hydraulic Research NGO in BULLETIN OF HIGH TECHNOLOGY
- p. 72-87
ORGANIZATION OF A MONITORING SYSTEM IN RESERVOIRS
Growing demand for fresh water and constant depletion of water resources are among the problems of the 21st century. The issues of increasing the efficiency of using existing reservoirs, restoring damaged ones and building new ones are becoming increasingly urgent. The history of building large reservoirs is only 100 years old. At the same time, most of them have managed to fill with sediment, as a result of which the useful volume of reservoirs has decreased. In the near future, many reservoirs will cease to perform their main functions. On the other hand, over many years of operation, dams and hydraulic structures could lose their safety indicators due to long-term impacts of various external factors. Improving the reservoir monitoring system is one of the most important engineering issues of our time.
- 30 December 2024
- Published by Armenian National Association of Hydraulic Research NGO in BULLETIN OF HIGH TECHNOLOGY
- p. 72-87
ORGANIZATION OF A MONITORING SYSTEM IN RESERVOIRS
Growing demand for fresh water and constant depletion of water resources are among the problems of the 21st century. The issues of increasing the efficiency of using existing reservoirs, restoring damaged ones and building new ones are becoming increasingly urgent. The history of building large reservoirs is only 100 years old. At the same time, most of them have managed to fill with sediment, as a result of which the useful volume of reservoirs has decreased. In the near future, many reservoirs will cease to perform their main functions. On the other hand, over many years of operation, dams and hydraulic structures could lose their safety indicators due to long-term impacts of various external factors. Improving the reservoir monitoring system is one of the most important engineering issues of our time.
- 29 October 2024
- Published by Armenian National Association of Hydraulic Research NGO in BULLETIN OF HIGH TECHNOLOGY
- p. 51-61
SURVEY OF THE DAM «GEGHARKUNIK 2»
In many hydraulic structures, including dam bodies, it is not possible to effectively solve the problem of filtration. The Gegharkunik 2 reservoir is located within the land boundaries of the settlement of the same name, 900 m southeast of the village cemetery, on the elevation of the northeastern slope of the Geghama ridge, at an altitude of about 2220 m. The water in the bowl doesn't stay for long. Studies have shown that most of the water loss happens at the lower part of the dam, where there are many washouts. This means the reservoir not only fails to serve its main purpose but also poses a significant threat to the Gegharkunik community if the dam were to fail. The paper presents the results of a survey of the «Gegharkunik 2» dam.
- 29 October 2024
- Published by Armenian National Association of Hydraulic Research NGO in BULLETIN OF HIGH TECHNOLOGY
- p. 51-61
SURVEY OF THE DAM «GEGHARKUNIK 2»
In many hydraulic structures, including dam bodies, it is not possible to effectively solve the problem of filtration. The Gegharkunik 2 reservoir is located within the land boundaries of the settlement of the same name, 900 m southeast of the village cemetery, on the elevation of the northeastern slope of the Geghama ridge, at an altitude of about 2220 m. The water in the bowl doesn't stay for long. Studies have shown that most of the water loss happens at the lower part of the dam, where there are many washouts. This means the reservoir not only fails to serve its main purpose but also poses a significant threat to the Gegharkunik community if the dam were to fail. The paper presents the results of a survey of the «Gegharkunik 2» dam.
- 1 January 2023
- Published by Armenian National Association of Hydraulic Research NGO in BULLETIN OF HIGH TECHNOLOGY
- p. 84-92
ANALYSIS OF THE EFFICIENCY OF OPERATION OF SMALL HYDRO POWER PLANTS EQUIPPED WITH CROSSFLOW TURBINES
When selecting sites for a SHPP, it is critical to select the appropriate type of turbines to be installed and estimate the plant's expected yearly output. We have analyzed the efficiency of the Crosflo flow type turbine, which has gained popularity in recent years. In this paper dependencies have been identified that determine the efficiency of each element of the unit, depending on the water flow, the plant's pressure, and the unit's power The carried out study enables the automation of computations for determining the output of the plant equipped with flow type turbines.
- 1 January 2023
- Published by Armenian National Association of Hydraulic Research NGO in BULLETIN OF HIGH TECHNOLOGY
- p. 84-92
ANALYSIS OF THE EFFICIENCY OF OPERATION OF SMALL HYDRO POWER PLANTS EQUIPPED WITH CROSSFLOW TURBINES
When selecting sites for a SHPP, it is critical to select the appropriate type of turbines to be installed and estimate the plant's expected yearly output. We have analyzed the efficiency of the Crosflo flow type turbine, which has gained popularity in recent years. In this paper dependencies have been identified that determine the efficiency of each element of the unit, depending on the water flow, the plant's pressure, and the unit's power The carried out study enables the automation of computations for determining the output of the plant equipped with flow type turbines.