BHBernd Heinemann

Bernd Heinemann

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Bernd Heinemann has a total of 277 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Decoupling beam power and beam energy on ASDEX Upgrade NBI with an in-situ variable extraction gap system

    by C. Hopf, N. Den Harder, B. Heinemann, C. Angioni, U. Plank, M. Weiland, the ASDEX Upgrade Team

    In early 2022 one source of ASDEX Upgrade’s (AUG) neutral beam injector 2 was equipped with a first-of-its-kind beam extraction grid system with in-situ variable extraction/acceleration gap that allows one to choose beam energy and beam power independently in a wide operational space, greatly enhancing experimental flexibility. The gap can be changed from one AUG discharge to the next. The extended operational space makes it possible to reduce beam energy and shine through while maintaining high heating power, or to reduce NBI power at high beam energy, e.g. to stay in L mode. Furthermore, the feature opens the door for advanced control of heat and torque deposition, such as to change torque and ion-to-electron heating ratio at constant power. The prototype system was successfully tested in 2022 and already found first applications in AUG’s physics programme. The remaining three sources of the same injector will also be equipped with variable gaps during the 2022–24 opening of AUG and installation of this new system on all sources of NBI 1 is also under discussion in order to exploit the full potential of the new feature.


  • Open Access

    Variable grid gap for a wider operational space of NBI-heating at ASDEX upgrade

    by B. Heinemann, N. Den Harder, C. Hopf, M. Eckerskorn, M. Fröschle


  • Open Access

    ITER-HNB plasma and extraction grids in BUG: Characterization of magnetic deflection correction

    by Niek Den Harder, Andrew Hurlbatt, Christian Wimmer, Guillermo Orozco, Riccardo Nocentini, Markus Fröschle, Bernd Heinemann, Ursel Fantz

    The BATMAN Upgrade test facility aims to extract H-/D- at high current densities. The inevitably co-extracted electrons are deflected out of the beamlet by permanent magnets before acceleration. These magnets induce a row-wise zig-zag deflection of the beamlets. In the new MITICA-like extraction system, this deflection is compensated by additional deflection correction magnets. IBSimu modeling studies indicate that the deflection correction system not only acts on the horizontal beamlet deflection, but also causes aberrations to the vertical angular distribution. Dependencies of the beamlet position and size are studied in several parameter scans with the available diagnostic tools (CFC tile calorimetry, Beam Emission Spectroscopy). The horizontal beamlet deflection is robustly compensated within the systematic uncertainty of the experiment. The triangular beamlet shape predicted on basis of the magnetic field structure is visible in the CFC calorimetry.


  • Open Access

    Overview of recent and upcoming activities at the BATMAN Upgrade test facility

    by C. Wimmer, S. Briefi, M. Fröschle, B. Heinemann, N. Den Harder, A. Hurlbatt, A. Mimo, R. Nocentini, G. Orozco, U. Fantz

    The BATMAN Upgrade (BUG) test facility at IPP is contributing to the development of RF-driven H- sources towards the ITER neutral beam injection and beyond. BUG is equipped with an 1/8 size of the ITER NBI ion source and thus is highly flexible for setup changes or diagnostic access. The present strategy for BUG is aligned along two paths: (i) BUG is continuing to be upgraded upgrading for long pulse operation (up to 1 hour, both in H and D) to identify measures for the stabilization of long pulses. For pulses > 100 s a cooling of the plasma grid (first grid of the extraction system) is required in order to avoid the dominance of thermal Cs desorption. A Cs evaporation concept with evaporation close to the extraction system is being tested, showing a stabilization of co-extracted electrons in 100 s H pulses, (ii) BUG is used for investigations of whole beam and beamlet optics for which the beam diagnostics have been massively upgraded. The beam diagnostics have been used to characterize a newly installed MITICA-like extraction system including asymmetric deflection compensation magnets.


  • Open Access

    Operation of Large RF Driven Negative Ion Sources for Fusion at Pressures below 0.3 Pa

    by Dirk Wünderlich, Rudi Riedl, Markus Fröschle, Ursel Fantz, Bernd Heinemann

    The large (size: 1 m × 2 m) radio frequency (RF) driven negative ion sources for the neutral beam heating (NBI) systems of the future fusion experiment ITER will be operated at a low filling pressure of 0.3 Pa, in hydrogen or in deuterium. The plasma will be generated by inductively coupling an RF power of up to 800 kW into the source volume. Under consideration for future neutral beam heating systems, like the one for the demonstration reactor DEMO, is an even lower filling pressure of 0.2 Pa. Together with the effect of neutral gas depletion, such low operational pressures can result in a neutral gas density below the limit required for sustaining the plasma. Systematic investigations on the low-pressure operational limit of the half-ITER-size negative ion source of the ELISE (Extraction from a Large Ion Source Experiment) test facility were performed, demonstrating that operation is possible below 0.2 Pa. A strong correlation of the lower pressure limit on the magnetic filter field topology is found. Depending on the field topology, operation close to the low-pressure limit is accompanied by strong plasma oscillations in the kHz range.


  • Achievements of the ELISE test facility in view of the ITER NBI

    by B. Heinemann, D. Wünderlich, W. Kraus, F. Bonomo, U. Fantz, M. Fröschle, I. Mario, R. Riedl, C. Wimmer


  • Open Access

    Concepts of magnetic filter fields in powerful negative ion sources for fusion

    by W. Kraus, U. Fantz, B. Heinemann, D. Wünderlich

    The performance of large negative ion sources used in neutral beam injection systems is in long pulses mainly determined by the increase of the currents of co-extracted electrons. This is in particular a problem in deuterium and limits the ion currents which are for long pulses below the requirements for the ITER source. In the source of the ELISE test facility, the magnetic field in front of the first grid, which is essential to reduce the electron current, is generated by a current of several kA flowing through the plasma facing grid. Weakening of this field by the addition of permanent magnets placed close to the lateral walls has led to a reduction of the electron current by a factor three without loss of ion current when source was operated in volume production. If this effect can be validated for the cesiated source, it would be a large step towards achieving the ITER parameter in long pulses.


  • Calorimeter design-aspects for neutral beam injection on W7-X

    by D. Holtum, M. Fröschle, B. Heinemann, T. Liebe, R. Nocentini, R. Riedl, P. Rong, W. Schubert, A. Stäbler


  • Status of the 1 MeV Accelerator Design for ITER NBI

    by M. Kuriyama, D. Boilson, R. Hemsworth, L. Svensson, J. Graceffa, B. Schunke, H. Decamps, M. Tanaka, T. Bonicelli, A. Masiello, et al.

    The beam source of neutral beam heating/current drive system for ITER is needed to accelerate the negative ion beam of 40A with D− at 1 MeV for 3600 sec. In order to realize the beam source, design and R&D works are being developed in many institutions under the coordination of ITER organization. The development of the key issues of the ion source including source plasma uniformity, suppression of co‐extracted electron in D beam operation and also after the long beam duration time of over a few 100 sec, is progressed mainly in IPP with the facilities of BATMAN, MANITU and RADI. In the near future, ELISE, that will be tested the half size of the ITER ion source, will start the operation in 2011, and then SPIDER, which demonstrates negative ion production and extraction with the same size and same structure as the ITER ion source, will start the operation in 2014 as part of the NBTF. The development of the accelerator is progressed mainly in JAEA with the MeV test facility, and also the computer simulation of beam optics also developed in JAEA, CEA and RFX. The full ITER heating and current drive beam performance will be demonstrated in MITICA, which will start operation in 2016 as part of the NBTF.