Bernd Heinemann
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Bernd Heinemann has a total of 277 co-authors. Here are the top co-authors by number of shared publications:
R. Riedl
Max Planck Institute for Plasma Physics, Boltzmannstr. 2, 85748 Garching, Germany
7 shared publications- Ursel Fantz
Max-Planck-Institut für Plasmaphysik
6 shared publications - Dirk Wunderlich
Max-Planck-Institut für Plasmaphysik
4 shared publications E. Speth
Max-Planck-Institut für Plasmaphysik 2 , EURATOM Association-IPP, 85748 Garching, Germany
4 shared publications- Christian Wimmer
Max-Planck-Institut für Plasmaphysik, Boltzmannstr. 2, 85748 Garching, Germany
3 shared publications - Guillermo Orozco
Max Planck Inst Plasma Phys, Boltzmannstr 2, D-85748 Garching, Germany
3 shared publications
Latest Publications
- Open Access
- 29 July 2024
- Published by IOP Publishing in Nuclear Fusion
- Vol. 64 (9) , 096017
Decoupling beam power and beam energy on ASDEX Upgrade NBI with an in-situ variable extraction gap system
In early 2022 one source of ASDEX Upgrade’s (AUG) neutral beam injector 2 was equipped with a first-of-its-kind beam extraction grid system with in-situ variable extraction/acceleration gap that allows one to choose beam energy and beam power independently in a wide operational space, greatly enhancing experimental flexibility. The gap can be changed from one AUG discharge to the next. The extended operational space makes it possible to reduce beam energy and shine through while maintaining high heating power, or to reduce NBI power at high beam energy, e.g. to stay in L mode. Furthermore, the feature opens the door for advanced control of heat and torque deposition, such as to change torque and ion-to-electron heating ratio at constant power. The prototype system was successfully tested in 2022 and already found first applications in AUG’s physics programme. The remaining three sources of the same injector will also be equipped with variable gaps during the 2022–24 opening of AUG and installation of this new system on all sources of NBI 1 is also under discussion in order to exploit the full potential of the new feature.
- 29 July 2024
- Published by IOP Publishing in Nuclear Fusion
- Vol. 64 (9) , 096017
Open AccessDecoupling beam power and beam energy on ASDEX Upgrade NBI with an in-situ variable extraction gap system
In early 2022 one source of ASDEX Upgrade’s (AUG) neutral beam injector 2 was equipped with a first-of-its-kind beam extraction grid system with in-situ variable extraction/acceleration gap that allows one to choose beam energy and beam power independently in a wide operational space, greatly enhancing experimental flexibility. The gap can be changed from one AUG discharge to the next. The extended operational space makes it possible to reduce beam energy and shine through while maintaining high heating power, or to reduce NBI power at high beam energy, e.g. to stay in L mode. Furthermore, the feature opens the door for advanced control of heat and torque deposition, such as to change torque and ion-to-electron heating ratio at constant power. The prototype system was successfully tested in 2022 and already found first applications in AUG’s physics programme. The remaining three sources of the same injector will also be equipped with variable gaps during the 2022–24 opening of AUG and installation of this new system on all sources of NBI 1 is also under discussion in order to exploit the full potential of the new feature.
- Open Access
- 11 January 2023
- Published by Elsevier in Fusion Engineering and Design
- Vol. 188
Variable grid gap for a wider operational space of NBI-heating at ASDEX upgrade
- 11 January 2023
- Published by Elsevier in Fusion Engineering and Design
- Vol. 188
Open AccessVariable grid gap for a wider operational space of NBI-heating at ASDEX upgrade
- Open Access
- 1 April 2022
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 2244 (1) , 012053
ITER-HNB plasma and extraction grids in BUG: Characterization of magnetic deflection correction
The BATMAN Upgrade test facility aims to extract H-/D- at high current densities. The inevitably co-extracted electrons are deflected out of the beamlet by permanent magnets before acceleration. These magnets induce a row-wise zig-zag deflection of the beamlets. In the new MITICA-like extraction system, this deflection is compensated by additional deflection correction magnets. IBSimu modeling studies indicate that the deflection correction system not only acts on the horizontal beamlet deflection, but also causes aberrations to the vertical angular distribution. Dependencies of the beamlet position and size are studied in several parameter scans with the available diagnostic tools (CFC tile calorimetry, Beam Emission Spectroscopy). The horizontal beamlet deflection is robustly compensated within the systematic uncertainty of the experiment. The triangular beamlet shape predicted on basis of the magnetic field structure is visible in the CFC calorimetry.
- 1 April 2022
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 2244 (1) , 012053
Open AccessITER-HNB plasma and extraction grids in BUG: Characterization of magnetic deflection correction
The BATMAN Upgrade test facility aims to extract H-/D- at high current densities. The inevitably co-extracted electrons are deflected out of the beamlet by permanent magnets before acceleration. These magnets induce a row-wise zig-zag deflection of the beamlets. In the new MITICA-like extraction system, this deflection is compensated by additional deflection correction magnets. IBSimu modeling studies indicate that the deflection correction system not only acts on the horizontal beamlet deflection, but also causes aberrations to the vertical angular distribution. Dependencies of the beamlet position and size are studied in several parameter scans with the available diagnostic tools (CFC tile calorimetry, Beam Emission Spectroscopy). The horizontal beamlet deflection is robustly compensated within the systematic uncertainty of the experiment. The triangular beamlet shape predicted on basis of the magnetic field structure is visible in the CFC calorimetry.
- Open Access
- 1 April 2022
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 2244 (1) , 012051
Overview of recent and upcoming activities at the BATMAN Upgrade test facility
The BATMAN Upgrade (BUG) test facility at IPP is contributing to the development of RF-driven H- sources towards the ITER neutral beam injection and beyond. BUG is equipped with an 1/8 size of the ITER NBI ion source and thus is highly flexible for setup changes or diagnostic access. The present strategy for BUG is aligned along two paths: (i) BUG is continuing to be upgraded upgrading for long pulse operation (up to 1 hour, both in H and D) to identify measures for the stabilization of long pulses. For pulses > 100 s a cooling of the plasma grid (first grid of the extraction system) is required in order to avoid the dominance of thermal Cs desorption. A Cs evaporation concept with evaporation close to the extraction system is being tested, showing a stabilization of co-extracted electrons in 100 s H pulses, (ii) BUG is used for investigations of whole beam and beamlet optics for which the beam diagnostics have been massively upgraded. The beam diagnostics have been used to characterize a newly installed MITICA-like extraction system including asymmetric deflection compensation magnets.
- 1 April 2022
- Published by IOP Publishing in Journal of Physics: Conference Series
- Vol. 2244 (1) , 012051
Open AccessOverview of recent and upcoming activities at the BATMAN Upgrade test facility
The BATMAN Upgrade (BUG) test facility at IPP is contributing to the development of RF-driven H- sources towards the ITER neutral beam injection and beyond. BUG is equipped with an 1/8 size of the ITER NBI ion source and thus is highly flexible for setup changes or diagnostic access. The present strategy for BUG is aligned along two paths: (i) BUG is continuing to be upgraded upgrading for long pulse operation (up to 1 hour, both in H and D) to identify measures for the stabilization of long pulses. For pulses > 100 s a cooling of the plasma grid (first grid of the extraction system) is required in order to avoid the dominance of thermal Cs desorption. A Cs evaporation concept with evaporation close to the extraction system is being tested, showing a stabilization of co-extracted electrons in 100 s H pulses, (ii) BUG is used for investigations of whole beam and beamlet optics for which the beam diagnostics have been massively upgraded. The beam diagnostics have been used to characterize a newly installed MITICA-like extraction system including asymmetric deflection compensation magnets.
- Open Access
Operation of Large RF Driven Negative Ion Sources for Fusion at Pressures below 0.3 Pa
The large (size: 1 m × 2 m) radio frequency (RF) driven negative ion sources for the neutral beam heating (NBI) systems of the future fusion experiment ITER will be operated at a low filling pressure of 0.3 Pa, in hydrogen or in deuterium. The plasma will be generated by inductively coupling an RF power of up to 800 kW into the source volume. Under consideration for future neutral beam heating systems, like the one for the demonstration reactor DEMO, is an even lower filling pressure of 0.2 Pa. Together with the effect of neutral gas depletion, such low operational pressures can result in a neutral gas density below the limit required for sustaining the plasma. Systematic investigations on the low-pressure operational limit of the half-ITER-size negative ion source of the ELISE (Extraction from a Large Ion Source Experiment) test facility were performed, demonstrating that operation is possible below 0.2 Pa. A strong correlation of the lower pressure limit on the magnetic filter field topology is found. Depending on the field topology, operation close to the low-pressure limit is accompanied by strong plasma oscillations in the kHz range.
Open AccessOperation of Large RF Driven Negative Ion Sources for Fusion at Pressures below 0.3 Pa
The large (size: 1 m × 2 m) radio frequency (RF) driven negative ion sources for the neutral beam heating (NBI) systems of the future fusion experiment ITER will be operated at a low filling pressure of 0.3 Pa, in hydrogen or in deuterium. The plasma will be generated by inductively coupling an RF power of up to 800 kW into the source volume. Under consideration for future neutral beam heating systems, like the one for the demonstration reactor DEMO, is an even lower filling pressure of 0.2 Pa. Together with the effect of neutral gas depletion, such low operational pressures can result in a neutral gas density below the limit required for sustaining the plasma. Systematic investigations on the low-pressure operational limit of the half-ITER-size negative ion source of the ELISE (Extraction from a Large Ion Source Experiment) test facility were performed, demonstrating that operation is possible below 0.2 Pa. A strong correlation of the lower pressure limit on the magnetic filter field topology is found. Depending on the field topology, operation close to the low-pressure limit is accompanied by strong plasma oscillations in the kHz range.
- 17 January 2019
- Published by Elsevier in Fusion Engineering and Design
- Vol. 146, 455-459
Achievements of the ELISE test facility in view of the ITER NBI
- 17 January 2019
- Published by Elsevier in Fusion Engineering and Design
- Vol. 146, 455-459
Achievements of the ELISE test facility in view of the ITER NBI
- Open Access
- 27 October 2015
- Published by AIP Publishing in Review of Scientific Instruments
- Vol. 87 (2) , 02B315
Concepts of magnetic filter fields in powerful negative ion sources for fusion
The performance of large negative ion sources used in neutral beam injection systems is in long pulses mainly determined by the increase of the currents of co-extracted electrons. This is in particular a problem in deuterium and limits the ion currents which are for long pulses below the requirements for the ITER source. In the source of the ELISE test facility, the magnetic field in front of the first grid, which is essential to reduce the electron current, is generated by a current of several kA flowing through the plasma facing grid. Weakening of this field by the addition of permanent magnets placed close to the lateral walls has led to a reduction of the electron current by a factor three without loss of ion current when source was operated in volume production. If this effect can be validated for the cesiated source, it would be a large step towards achieving the ITER parameter in long pulses.
- 27 October 2015
- Published by AIP Publishing in Review of Scientific Instruments
- Vol. 87 (2) , 02B315
Open AccessConcepts of magnetic filter fields in powerful negative ion sources for fusion
The performance of large negative ion sources used in neutral beam injection systems is in long pulses mainly determined by the increase of the currents of co-extracted electrons. This is in particular a problem in deuterium and limits the ion currents which are for long pulses below the requirements for the ITER source. In the source of the ELISE test facility, the magnetic field in front of the first grid, which is essential to reduce the electron current, is generated by a current of several kA flowing through the plasma facing grid. Weakening of this field by the addition of permanent magnets placed close to the lateral walls has led to a reduction of the electron current by a factor three without loss of ion current when source was operated in volume production. If this effect can be validated for the cesiated source, it would be a large step towards achieving the ITER parameter in long pulses.
- 1 December 2014
- Published by Elsevier in Fusion Engineering and Design
- Vol. 89 (12) , 3070-3077
AC operation of large titanium sublimation pumps in a magnetic field: Results of the test stand for the W7-X neutral beam injectors
- 1 December 2014
- Published by Elsevier in Fusion Engineering and Design
- Vol. 89 (12) , 3070-3077
AC operation of large titanium sublimation pumps in a magnetic field: Results of the test stand for the W7-X neutral beam injectors
- 31 October 2011
- Published by Elsevier in Fusion Engineering and Design
- Vol. 86 (6-8) , 905-908
Calorimeter design-aspects for neutral beam injection on W7-X
- 31 October 2011
- Published by Elsevier in Fusion Engineering and Design
- Vol. 86 (6-8) , 905-908
Calorimeter design-aspects for neutral beam injection on W7-X
- 26 September 2011
- Published by AIP Publishing
- Vol. 1390 (1) , 545-554
Status of the 1 MeV Accelerator Design for ITER NBI
The beam source of neutral beam heating/current drive system for ITER is needed to accelerate the negative ion beam of 40A with at 1 MeV for 3600 sec. In order to realize the beam source, design and R&D works are being developed in many institutions under the coordination of ITER organization. The development of the key issues of the ion source including source plasma uniformity, suppression of co‐extracted electron in D beam operation and also after the long beam duration time of over a few 100 sec, is progressed mainly in IPP with the facilities of BATMAN, MANITU and RADI. In the near future, ELISE, that will be tested the half size of the ITER ion source, will start the operation in 2011, and then SPIDER, which demonstrates negative ion production and extraction with the same size and same structure as the ITER ion source, will start the operation in 2014 as part of the NBTF. The development of the accelerator is progressed mainly in JAEA with the MeV test facility, and also the computer simulation of beam optics also developed in JAEA, CEA and RFX. The full ITER heating and current drive beam performance will be demonstrated in MITICA, which will start operation in 2016 as part of the NBTF.- 26 September 2011
- Published by AIP Publishing
- Vol. 1390 (1) , 545-554
Status of the 1 MeV Accelerator Design for ITER NBI
The beam source of neutral beam heating/current drive system for ITER is needed to accelerate the negative ion beam of 40A with at 1 MeV for 3600 sec. In order to realize the beam source, design and R&D works are being developed in many institutions under the coordination of ITER organization. The development of the key issues of the ion source including source plasma uniformity, suppression of co‐extracted electron in D beam operation and also after the long beam duration time of over a few 100 sec, is progressed mainly in IPP with the facilities of BATMAN, MANITU and RADI. In the near future, ELISE, that will be tested the half size of the ITER ion source, will start the operation in 2011, and then SPIDER, which demonstrates negative ion production and extraction with the same size and same structure as the ITER ion source, will start the operation in 2014 as part of the NBTF. The development of the accelerator is progressed mainly in JAEA with the MeV test facility, and also the computer simulation of beam optics also developed in JAEA, CEA and RFX. The full ITER heating and current drive beam performance will be demonstrated in MITICA, which will start operation in 2016 as part of the NBTF.