Alexandr B. Petruhin
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Alexandr B. Petruhin has a total of 18 co-authors. Here are the top co-authors by number of shared publications:
- Lyudmila Oparina
Ivanovo State Polytechnic University
2 shared publications - Valery Ogurtsov
Ivanovo State Polytechnic University
2 shared publications А. Б. Петрухин
Ивановский государственный политехнический университет
2 shared publicationsВ. А. Огурцов
Ивановский государственный политехнический университет
2 shared publicationsЛ. А. Опарина
Ивановский государственный политехнический университет
2 shared publicationsAdnan A. Hyder
Johns Hopkins International Injury Research Unit, Johns Hopkins Bloomberg School of Public Health, Baltimore, Maryland, USA
1 shared publication
Latest Publications
- Open Access
- 9 October 2026
- Published by Irkutsk National Research Technical University in Izvestiâ vuzov.Investicii.Stroitelʹstvo.Nedvižimostʹ
- Vol. 16 (3) , 545-559
Assessment of options for reconstructing the cooling system of a thermal power plant based on information modeling and evaluation of efficiency across the life cycle stages
The aim of the study is to develop an organizational and technological method for selecting an option for reconstructing the cooling system of a thermal power plant as a technically complex capital construction project, taking into account the stages of its life cycle. The relevance of the work is due to the fact that increasing the summer electrical load of a thermal power plant is limited by the temperature of the circulating water, and the construction of a new cooling tower is not always feasible due to site conditions, capital investments, and the duration of the investment and construction cycle. The paper examines four modernization options: expanding the cooling pond, constructing a spray basin, installing spray devices on the pond’s dam, and installing spray devices on the dam between the cold channel and the cooling pond. The research methods include thermal engineering calculations, information modeling of the initial data, and dynamic assessment of efficiency. It was found that the option of installing spray devices on a dam between a cold channel and a pond reduces the temperature of chilled water to 28.9 °C at maximum flow and forms the best ratio of capital costs and economic result - net discounted income will amount to about 2.56 billion rubles, a discounted yield index of 36 %, a discounted payback period of 6.1 years. The results show that the modification of the existing cooling system can be considered as a life cycle control element of a thermal power plant, which allows to increase summer production without building a new cooling tower.
- 9 October 2026
- Published by Irkutsk National Research Technical University in Izvestiâ vuzov.Investicii.Stroitelʹstvo.Nedvižimostʹ
- Vol. 16 (3) , 545-559
Open AccessAssessment of options for reconstructing the cooling system of a thermal power plant based on information modeling and evaluation of efficiency across the life cycle stages
The aim of the study is to develop an organizational and technological method for selecting an option for reconstructing the cooling system of a thermal power plant as a technically complex capital construction project, taking into account the stages of its life cycle. The relevance of the work is due to the fact that increasing the summer electrical load of a thermal power plant is limited by the temperature of the circulating water, and the construction of a new cooling tower is not always feasible due to site conditions, capital investments, and the duration of the investment and construction cycle. The paper examines four modernization options: expanding the cooling pond, constructing a spray basin, installing spray devices on the pond’s dam, and installing spray devices on the dam between the cold channel and the cooling pond. The research methods include thermal engineering calculations, information modeling of the initial data, and dynamic assessment of efficiency. It was found that the option of installing spray devices on a dam between a cold channel and a pond reduces the temperature of chilled water to 28.9 °C at maximum flow and forms the best ratio of capital costs and economic result - net discounted income will amount to about 2.56 billion rubles, a discounted yield index of 36 %, a discounted payback period of 6.1 years. The results show that the modification of the existing cooling system can be considered as a life cycle control element of a thermal power plant, which allows to increase summer production without building a new cooling tower.
- Open Access
- 24 September 2026
- Published by FSFEI HE Don State Technical University in Modern Trends in Construction, Urban and Territorial Planning
- Vol. 5 (3) , 82-93
Automated Design Decision-Making Based on an Information Model in the Life Cycle Management of Construction Objects
Introduction . The article discusses the current issues of automated design decision-making based on an information model of a construction object. The research problem is related to the need to improve the quality of construction products by parametrization of design solutions and digital support for life cycle management. Materials and Methods. The study was conducted using system analysis, structural and logical analysis, methods of information and parametric modeling, algorithmization of design procedures, and applied computational and graphical procedures implemented in Grasshopper, Tekla Structures, and other BIM-oriented software systems. Research Results. Using the example of automated design of a heating network pipeline support it was shown that a parametric information model ensures automatic reconstruction of structural elements when the input data change, improves the consistency of design solutions, and reduces modeling time from 20–30 minutes down to a few seconds. Discussion and Conclusion. The results confirm the feasibility of making use of automated algorithms and parametric modeling as a tool for quality management of construction products at the design and subsequent implementation of an investment and construction project.
- 24 September 2026
- Published by FSFEI HE Don State Technical University in Modern Trends in Construction, Urban and Territorial Planning
- Vol. 5 (3) , 82-93
Open AccessAutomated Design Decision-Making Based on an Information Model in the Life Cycle Management of Construction Objects
Introduction . The article discusses the current issues of automated design decision-making based on an information model of a construction object. The research problem is related to the need to improve the quality of construction products by parametrization of design solutions and digital support for life cycle management. Materials and Methods. The study was conducted using system analysis, structural and logical analysis, methods of information and parametric modeling, algorithmization of design procedures, and applied computational and graphical procedures implemented in Grasshopper, Tekla Structures, and other BIM-oriented software systems. Research Results. Using the example of automated design of a heating network pipeline support it was shown that a parametric information model ensures automatic reconstruction of structural elements when the input data change, improves the consistency of design solutions, and reduces modeling time from 20–30 minutes down to a few seconds. Discussion and Conclusion. The results confirm the feasibility of making use of automated algorithms and parametric modeling as a tool for quality management of construction products at the design and subsequent implementation of an investment and construction project.
- Open Access
- 31 January 2024
- Published by Moscow State University of Civil Engineering in Vestnik MGSU
- Vol. 19 (1) , 128-137
Организационно-технологические принципы мониторинга состояния здания на этапе эксплуатации жизненного цикла
Организационно-технологические принципы мониторинга состояния здания на этапе эксплуатации жизненного цикла
- 31 January 2024
- Published by Moscow State University of Civil Engineering in Vestnik MGSU
- Vol. 19 (1) , 128-137
Open AccessОрганизационно-технологические принципы мониторинга состояния здания на этапе эксплуатации жизненного цикла
Организационно-технологические принципы мониторинга состояния здания на этапе эксплуатации жизненного цикла