Lyudmila Oparina
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Lyudmila Oparina has a total of 15 co-authors. Here are the top co-authors by number of shared publications:
- Valery Ogurtsov
Ivanovo State Polytechnic University
3 shared publications В. А. Огурцов
Ивановский государственный политехнический университет
3 shared publications- Alexandr B. Petruhin
Ivanovo State Polytechnic University
2 shared publications А. Б. Петрухин
Ивановский государственный политехнический университет
2 shared publicationsЛ. А. Опарина
Ивановский государственный политехнический университет
2 shared publications- D. V. Khomyakov
Ivanovo State Polytechnic University
1 shared publication
Latest Publications
- Open Access
- 9 October 2026
- Published by Irkutsk National Research Technical University in Izvestiâ vuzov.Investicii.Stroitelʹstvo.Nedvižimostʹ
- Vol. 16 (3) , 545-559
Assessment of options for reconstructing the cooling system of a thermal power plant based on information modeling and evaluation of efficiency across the life cycle stages
The aim of the study is to develop an organizational and technological method for selecting an option for reconstructing the cooling system of a thermal power plant as a technically complex capital construction project, taking into account the stages of its life cycle. The relevance of the work is due to the fact that increasing the summer electrical load of a thermal power plant is limited by the temperature of the circulating water, and the construction of a new cooling tower is not always feasible due to site conditions, capital investments, and the duration of the investment and construction cycle. The paper examines four modernization options: expanding the cooling pond, constructing a spray basin, installing spray devices on the pond’s dam, and installing spray devices on the dam between the cold channel and the cooling pond. The research methods include thermal engineering calculations, information modeling of the initial data, and dynamic assessment of efficiency. It was found that the option of installing spray devices on a dam between a cold channel and a pond reduces the temperature of chilled water to 28.9 °C at maximum flow and forms the best ratio of capital costs and economic result - net discounted income will amount to about 2.56 billion rubles, a discounted yield index of 36 %, a discounted payback period of 6.1 years. The results show that the modification of the existing cooling system can be considered as a life cycle control element of a thermal power plant, which allows to increase summer production without building a new cooling tower.
- 9 October 2026
- Published by Irkutsk National Research Technical University in Izvestiâ vuzov.Investicii.Stroitelʹstvo.Nedvižimostʹ
- Vol. 16 (3) , 545-559
Open AccessAssessment of options for reconstructing the cooling system of a thermal power plant based on information modeling and evaluation of efficiency across the life cycle stages
The aim of the study is to develop an organizational and technological method for selecting an option for reconstructing the cooling system of a thermal power plant as a technically complex capital construction project, taking into account the stages of its life cycle. The relevance of the work is due to the fact that increasing the summer electrical load of a thermal power plant is limited by the temperature of the circulating water, and the construction of a new cooling tower is not always feasible due to site conditions, capital investments, and the duration of the investment and construction cycle. The paper examines four modernization options: expanding the cooling pond, constructing a spray basin, installing spray devices on the pond’s dam, and installing spray devices on the dam between the cold channel and the cooling pond. The research methods include thermal engineering calculations, information modeling of the initial data, and dynamic assessment of efficiency. It was found that the option of installing spray devices on a dam between a cold channel and a pond reduces the temperature of chilled water to 28.9 °C at maximum flow and forms the best ratio of capital costs and economic result - net discounted income will amount to about 2.56 billion rubles, a discounted yield index of 36 %, a discounted payback period of 6.1 years. The results show that the modification of the existing cooling system can be considered as a life cycle control element of a thermal power plant, which allows to increase summer production without building a new cooling tower.
- Open Access
- 24 September 2026
- Published by FSFEI HE Don State Technical University in Modern Trends in Construction, Urban and Territorial Planning
- Vol. 5 (3) , 82-93
Automated Design Decision-Making Based on an Information Model in the Life Cycle Management of Construction Objects
Introduction . The article discusses the current issues of automated design decision-making based on an information model of a construction object. The research problem is related to the need to improve the quality of construction products by parametrization of design solutions and digital support for life cycle management. Materials and Methods. The study was conducted using system analysis, structural and logical analysis, methods of information and parametric modeling, algorithmization of design procedures, and applied computational and graphical procedures implemented in Grasshopper, Tekla Structures, and other BIM-oriented software systems. Research Results. Using the example of automated design of a heating network pipeline support it was shown that a parametric information model ensures automatic reconstruction of structural elements when the input data change, improves the consistency of design solutions, and reduces modeling time from 20–30 minutes down to a few seconds. Discussion and Conclusion. The results confirm the feasibility of making use of automated algorithms and parametric modeling as a tool for quality management of construction products at the design and subsequent implementation of an investment and construction project.
- 24 September 2026
- Published by FSFEI HE Don State Technical University in Modern Trends in Construction, Urban and Territorial Planning
- Vol. 5 (3) , 82-93
Open AccessAutomated Design Decision-Making Based on an Information Model in the Life Cycle Management of Construction Objects
Introduction . The article discusses the current issues of automated design decision-making based on an information model of a construction object. The research problem is related to the need to improve the quality of construction products by parametrization of design solutions and digital support for life cycle management. Materials and Methods. The study was conducted using system analysis, structural and logical analysis, methods of information and parametric modeling, algorithmization of design procedures, and applied computational and graphical procedures implemented in Grasshopper, Tekla Structures, and other BIM-oriented software systems. Research Results. Using the example of automated design of a heating network pipeline support it was shown that a parametric information model ensures automatic reconstruction of structural elements when the input data change, improves the consistency of design solutions, and reduces modeling time from 20–30 minutes down to a few seconds. Discussion and Conclusion. The results confirm the feasibility of making use of automated algorithms and parametric modeling as a tool for quality management of construction products at the design and subsequent implementation of an investment and construction project.
- Open Access
- 28 February 2026
- Published by Publishing Company World of Science LLC in The Eurasian Scientific Journal
- Vol. 18 (1)
Applying a systematic approach to the organization of the life cycle of modular construction facilities
In modern economic conditions, the industrialization of construction and the introduction of scalable standard solutions, in particular modular facilities, are a strategic vector for the development of the construction complex. According to the forecasts of the Association for the Development of Modular Construction, the share of construction of facilities from ready-made kits in Russia by 2030 may increase from 7 % to 30 % of the total construction volume. However, existing lifecycle management approaches based on the linear paradigm demonstrate limited applicability in conditions of high technological complexity of modular structures. Traditional linear lifecycle models do not provide sufficient flexibility, necessary stage consistency, and feedback to manage iterative modular manufacturing processes. Therefore, the authors proposed a conceptualized representation of the life cycle of a modular building as a hierarchically complex system. A two-level decomposition method is proposed that divides an object into a target system (building) and a target subsystem (module), and consistent target functions of the levels are formed. The key novelty of the approach is to consider the module as an autonomous control unit with its own information flow circuit. The developed structural and functional life cycle model allows integrating data on the state of subsystems in real time, which minimizes the risks of stage misalignment and optimizes the process of making design and operational decisions. Thus, the developed approach has great potential for developing sustainability, adaptability and improving the efficiency of modular construction projects.
- 28 February 2026
- Published by Publishing Company World of Science LLC in The Eurasian Scientific Journal
- Vol. 18 (1)
Open AccessApplying a systematic approach to the organization of the life cycle of modular construction facilities
In modern economic conditions, the industrialization of construction and the introduction of scalable standard solutions, in particular modular facilities, are a strategic vector for the development of the construction complex. According to the forecasts of the Association for the Development of Modular Construction, the share of construction of facilities from ready-made kits in Russia by 2030 may increase from 7 % to 30 % of the total construction volume. However, existing lifecycle management approaches based on the linear paradigm demonstrate limited applicability in conditions of high technological complexity of modular structures. Traditional linear lifecycle models do not provide sufficient flexibility, necessary stage consistency, and feedback to manage iterative modular manufacturing processes. Therefore, the authors proposed a conceptualized representation of the life cycle of a modular building as a hierarchically complex system. A two-level decomposition method is proposed that divides an object into a target system (building) and a target subsystem (module), and consistent target functions of the levels are formed. The key novelty of the approach is to consider the module as an autonomous control unit with its own information flow circuit. The developed structural and functional life cycle model allows integrating data on the state of subsystems in real time, which minimizes the risks of stage misalignment and optimizes the process of making design and operational decisions. Thus, the developed approach has great potential for developing sustainability, adaptability and improving the efficiency of modular construction projects.
- Open Access
- 30 May 2024
- Published by Moscow State University of Civil Engineering in Vestnik MGSU
- Vol. 19 (5) , 826-835
Использование инструмента бережливого производства в управлении поставками материалов в течение жизненного цикла строительного проекта
Использование инструмента бережливого производства в управлении поставками материалов в течение жизненного цикла строительного проекта
- 30 May 2024
- Published by Moscow State University of Civil Engineering in Vestnik MGSU
- Vol. 19 (5) , 826-835
Open AccessИспользование инструмента бережливого производства в управлении поставками материалов в течение жизненного цикла строительного проекта
Использование инструмента бережливого производства в управлении поставками материалов в течение жизненного цикла строительного проекта