Junseo Bae
Research Subjects
Junseo Bae has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
- Kunhee Choi
Texas A&M Univ
3 shared publications - Hyun Woo Lee
University of Washington
2 shared publications - Cenfei Sun
Texas A&M Univ
1 shared publication - Changbum Ryan Ahn
Seoul National Univ
1 shared publication - David Bilbo
Professor, Dept. of Construction Science, Texas A&M Univ., 3137 TAMU, Francis Hall 310, College Station, TX 77843-3137
1 shared publication - Matthew R. Johnson
University of Nebraska–Lincoln, Lincoln, NE, USA
1 shared publication
Latest Publications
- 29 March 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 221-230
Monitoring Changes in Gait Adaptation to Identify Construction Workers’ Risk Preparedness after Multiple Exposures to a Hazard
Many construction accidents result from workers’ unsafe behaviors, and evidence demonstrates that individuals who consistently engage in risky behaviors often have a high rate of accidents. These risk-prone workers’ biased evaluation of hazards (risk perception) and high tendency to take risks (risk propensity) leave them insufficiently prepared when encountering hazards that may cause accidents. Therefore, measuring risk perception and propensity and using these measurements to identify risk-prone workers can provide opportunities to effectively interrupt unsafe behaviors. Our previous study indicated that subjects tend to change their gait patterns before encountering a hazard, a result that may occur due to the subject’s perception about the risks of the hazard. This study examines subjects’ gait adaptations when the subject encounters the same hazards repeatedly to determine whether gait adaptations depict changes in the subjects’ perceived risk from the hazards over time. The results from an experiment confirmed the hypothesis that the subject’s gait adaptation upon encountering a hazard decreases as he/she repeatedly encounters the same hazard. This result is in accordance with the theory of “outcome feedback” and represents an opportunity to use gait adaptation as a quantifiable behavioral response indicator for identifying risk-prone workers.
- 29 March 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 221-230
Monitoring Changes in Gait Adaptation to Identify Construction Workers’ Risk Preparedness after Multiple Exposures to a Hazard
Many construction accidents result from workers’ unsafe behaviors, and evidence demonstrates that individuals who consistently engage in risky behaviors often have a high rate of accidents. These risk-prone workers’ biased evaluation of hazards (risk perception) and high tendency to take risks (risk propensity) leave them insufficiently prepared when encountering hazards that may cause accidents. Therefore, measuring risk perception and propensity and using these measurements to identify risk-prone workers can provide opportunities to effectively interrupt unsafe behaviors. Our previous study indicated that subjects tend to change their gait patterns before encountering a hazard, a result that may occur due to the subject’s perception about the risks of the hazard. This study examines subjects’ gait adaptations when the subject encounters the same hazards repeatedly to determine whether gait adaptations depict changes in the subjects’ perceived risk from the hazards over time. The results from an experiment confirmed the hypothesis that the subject’s gait adaptation upon encountering a hazard decreases as he/she repeatedly encounters the same hazard. This result is in accordance with the theory of “outcome feedback” and represents an opportunity to use gait adaptation as a quantifiable behavioral response indicator for identifying risk-prone workers.
- 1 September 2017
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 143 (9)
IRIER: A Decision-Support Model for Optimal Energy Retrofit Investments
The importance of energy efficiency investment has grown substantially in recent decades, although research into the decision-making processes under energy saving uncertainties has been fairly limited. The main objective of this study is to create and test a multicriteria risk-based decision-support model for investment in energy efficiency projects under uncertainty of building energy retrofits: Integrated Risk-based decision-support model for investment in energy retrofits (IRIER). The results of a risk assessment are used in the modeling framework to help render optimal investment decisions from both energy and financial standpoints through advanced knowledge about uncertainties. The IRIER model accomplishes this by adopting a multicriteria analysis through stochastic simulations. An illustrative case study clearly shows that full-cost investment would not be optimal in the presence of uncertainty when considering both energy-saving and financial outcomes, in terms of the project’s total energy savings and the investment’s internal rate of return. The IRIER model can assist building owners and investors with assessing various investment scenarios in energy retrofits, thus enabling them to choose the most economical investment strategies that account for the level of risk.
- 1 September 2017
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 143 (9)
IRIER: A Decision-Support Model for Optimal Energy Retrofit Investments
The importance of energy efficiency investment has grown substantially in recent decades, although research into the decision-making processes under energy saving uncertainties has been fairly limited. The main objective of this study is to create and test a multicriteria risk-based decision-support model for investment in energy efficiency projects under uncertainty of building energy retrofits: Integrated Risk-based decision-support model for investment in energy retrofits (IRIER). The results of a risk assessment are used in the modeling framework to help render optimal investment decisions from both energy and financial standpoints through advanced knowledge about uncertainties. The IRIER model accomplishes this by adopting a multicriteria analysis through stochastic simulations. An illustrative case study clearly shows that full-cost investment would not be optimal in the presence of uncertainty when considering both energy-saving and financial outcomes, in terms of the project’s total energy savings and the investment’s internal rate of return. The IRIER model can assist building owners and investors with assessing various investment scenarios in energy retrofits, thus enabling them to choose the most economical investment strategies that account for the level of risk.
- 1 July 2016
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 30 (4)
Determining Future Maintenance Costs of Low-Volume Highway Rehabilitation Projects for Incorporation into Life-Cycle Cost Analysis
Life-cycle cost analysis (LCCA) has grown in importance, yet it is also regarded as a daunting task, because of the lack of reliable analytical models specifically aimed at quantifying future maintenance costs (FMC). The key objectives of this study are to identify the most critical factors that affect pavement performance, create a FMC predictive model that accounts for such factors, and validate the model’s robustness in quantifying a reliable FMC for low-volume highway rehabilitation projects. This study combines regression analysis techniques with a cluster analysis by using a large quantity of real-world data obtained from the pavement management information system. The clustering analysis revealed that traffic loading would be the most crucial affecting factor for pavement performance. A series of sensitivity analyses were performed to investigate the effect of individual critical performance-driven factors on FMC. A prediction error analysis validated the model’s robustness, proving that re...
- 1 July 2016
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 30 (4)
Determining Future Maintenance Costs of Low-Volume Highway Rehabilitation Projects for Incorporation into Life-Cycle Cost Analysis
Life-cycle cost analysis (LCCA) has grown in importance, yet it is also regarded as a daunting task, because of the lack of reliable analytical models specifically aimed at quantifying future maintenance costs (FMC). The key objectives of this study are to identify the most critical factors that affect pavement performance, create a FMC predictive model that accounts for such factors, and validate the model’s robustness in quantifying a reliable FMC for low-volume highway rehabilitation projects. This study combines regression analysis techniques with a cluster analysis by using a large quantity of real-world data obtained from the pavement management information system. The clustering analysis revealed that traffic loading would be the most crucial affecting factor for pavement performance. A series of sensitivity analyses were performed to investigate the effect of individual critical performance-driven factors on FMC. A prediction error analysis validated the model’s robustness, proving that re...
- 1 March 2016
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 142 (3)
Time-Cost Performance Effect of Change Orders from Accelerated Contract Provisions
Accelerated contract provisions (ACPs) such as cost-plus-time (A+B) and incentives/disincentives (I/D) are increasingly common, yet very little is known about their pure time-cost performance effects on change orders. To fill this large knowledge gap, a two-stage research methodology drawing on 1,372 highway improvement projects completed in California was adopted for this study. The Stage I study investigated the marginal change-order impacts of two ACPs, pure A+B and I/D combined with A+B. How ACP change orders affect projects’ time-cost performance was numerically modeled and successfully validated over the Stage II study. The results clearly showed that both ACPs led to more schedule-change and cost-change orders than conventionally contracted projects, whereas I/D combined with A+B performed significantly better than pure A+B in terms of the magnitude of schedule-change orders. This conveys an important recommendation to state transportation agencies (STAs) that A+B be used with an I/D provis...
- 1 March 2016
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 142 (3)
Time-Cost Performance Effect of Change Orders from Accelerated Contract Provisions
Accelerated contract provisions (ACPs) such as cost-plus-time (A+B) and incentives/disincentives (I/D) are increasingly common, yet very little is known about their pure time-cost performance effects on change orders. To fill this large knowledge gap, a two-stage research methodology drawing on 1,372 highway improvement projects completed in California was adopted for this study. The Stage I study investigated the marginal change-order impacts of two ACPs, pure A+B and I/D combined with A+B. How ACP change orders affect projects’ time-cost performance was numerically modeled and successfully validated over the Stage II study. The results clearly showed that both ACPs led to more schedule-change and cost-change orders than conventionally contracted projects, whereas I/D combined with A+B performed significantly better than pure A+B in terms of the magnitude of schedule-change orders. This conveys an important recommendation to state transportation agencies (STAs) that A+B be used with an I/D provis...