Kunhee Choi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Kunhee Choi has a total of 60 co-authors. Here are the top co-authors by number of shared publications:
- Hyungseok David Jeong
Texas A&M Univ
6 shared publications - Hyun Woo Lee
University of Washington
4 shared publications - Chau Le
Univ. of North Carolina at Charlotte
3 shared publications - Junseo Bae
Ph.D. Candidate, Dept. of Construction Science, Texas A&M Univ., 3137 TAMU, Francis Hall 328, College Station, TX 77843-3137
3 shared publications Kiyoung Son
Ph.D. Candidate, Dept. of Architecture, Texas A&M Univ., College Station, TX
3 shared publicationsYangtian Yin
Ph.D. Candidate, Dept. of Construction Science, Texas A&M Univ., 3137 TAMU, Francis Hall 328, College Station, TX 77843-3137
3 shared publications
Latest Publications
- 15 December 2025
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2680  (7) , 562-581
Breaking the Sound Barrier: Investigating Noise Challenges in the Development of Advanced Air Mobility
Advanced air mobility (AAM) offers transformative opportunities for urban transportation by potentially alleviating traffic congestion and enhancing mobility. However, implementing AAM in densely populated urban corridors poses significant challenges mainly as a result of noise emissions from its unique vertical takeoff, landing, and low-altitude operations. This study investigates the operational noise challenges of AAM and highlights operational strategies to mitigate noise-related issues. First, the current state-of-the-art in AAM, focusing on noise pollution as a critical concern, was assessed. Second, the potential impacts of AAM operational noise on urban communities were examined. Third, strategies to minimize noise exposure, such as route planning and noise zoning, were developed to ensure regulatory compliance and community acceptance. Furthermore, advanced noise reduction technologies, including optimized vehicle designs and propulsion systems, were explored to reduce noise emissions while maintaining operational performance. The results underscore the importance of adopting adaptive noise reduction technologies and integrating noise management into urban AAM planning. This study provides policy decision-makers and planners with a holistic synthesis view of AAM noise sources, types, and challenges and offers practical strategies for AAM integration. The conclusion yields that addressing noise challenges is essential for AAM’s successful and sustainable integration, leading to quieter, more community-friendly urban airspace. Policy recommendations are made to foster stakeholder collaboration, encourage financial investment in AAM infrastructure, and promote further research into AAM noise reduction and integrative urban planning.
- 15 December 2025
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2680  (7) , 562-581
Breaking the Sound Barrier: Investigating Noise Challenges in the Development of Advanced Air Mobility
Advanced air mobility (AAM) offers transformative opportunities for urban transportation by potentially alleviating traffic congestion and enhancing mobility. However, implementing AAM in densely populated urban corridors poses significant challenges mainly as a result of noise emissions from its unique vertical takeoff, landing, and low-altitude operations. This study investigates the operational noise challenges of AAM and highlights operational strategies to mitigate noise-related issues. First, the current state-of-the-art in AAM, focusing on noise pollution as a critical concern, was assessed. Second, the potential impacts of AAM operational noise on urban communities were examined. Third, strategies to minimize noise exposure, such as route planning and noise zoning, were developed to ensure regulatory compliance and community acceptance. Furthermore, advanced noise reduction technologies, including optimized vehicle designs and propulsion systems, were explored to reduce noise emissions while maintaining operational performance. The results underscore the importance of adopting adaptive noise reduction technologies and integrating noise management into urban AAM planning. This study provides policy decision-makers and planners with a holistic synthesis view of AAM noise sources, types, and challenges and offers practical strategies for AAM integration. The conclusion yields that addressing noise challenges is essential for AAM’s successful and sustainable integration, leading to quieter, more community-friendly urban airspace. Policy recommendations are made to foster stakeholder collaboration, encourage financial investment in AAM infrastructure, and promote further research into AAM noise reduction and integrative urban planning.
- Open Access
- 16 October 2025
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2680  (1) , 903-920
Equity Considerations for Emerging Technologies in Transportation: A Comparative Study of Planning Practices in the United States and South Korea
Emerging technologies, such as mobility as a service, autonomous vehicles, and artificial intelligence, are transforming the transportation planning paradigm. However, there is a significant gap in understanding how transportation planning agencies are considering the impact of these technologies on vulnerable communities. This study addresses this gap by investigating the different approaches agencies are using to assess the equity implications of emerging technologies. A comparative analysis was performed on the US and South Korea, where smart transportation systems are extensively piloted and implemented. In total, 36 planning documents, 20 from the US and 16 from South Korea, were analyzed to measure the extent to which social equity, emerging technologies, and their equity implications are reflected in long-term planning documents. Our findings reveal that over half the agencies in both countries include equity in their vision and goals, US Metropolitan Planning Organizations tend to focus on impact considerations, whereas South Korean agencies monitor technology trends. Only four of the 36 agencies examined considered the equity implications of technology through alternative scenario planning, modeling, research studies, and pricing considerations. These results highlight the need for further efforts to protect vulnerable populations from potential impacts. This study contributes to the existing literature by providing a contextual understanding of equity considerations in the deployment of emerging technologies and offers practical insights for policymakers and industry practitioners. It may provide a catalyst for integrating equity into the planning and implementation of smart transportation systems, ensuring that these technologies benefit all members of society.
- 16 October 2025
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2680  (1) , 903-920
Open AccessEquity Considerations for Emerging Technologies in Transportation: A Comparative Study of Planning Practices in the United States and South Korea
Emerging technologies, such as mobility as a service, autonomous vehicles, and artificial intelligence, are transforming the transportation planning paradigm. However, there is a significant gap in understanding how transportation planning agencies are considering the impact of these technologies on vulnerable communities. This study addresses this gap by investigating the different approaches agencies are using to assess the equity implications of emerging technologies. A comparative analysis was performed on the US and South Korea, where smart transportation systems are extensively piloted and implemented. In total, 36 planning documents, 20 from the US and 16 from South Korea, were analyzed to measure the extent to which social equity, emerging technologies, and their equity implications are reflected in long-term planning documents. Our findings reveal that over half the agencies in both countries include equity in their vision and goals, US Metropolitan Planning Organizations tend to focus on impact considerations, whereas South Korean agencies monitor technology trends. Only four of the 36 agencies examined considered the equity implications of technology through alternative scenario planning, modeling, research studies, and pricing considerations. These results highlight the need for further efforts to protect vulnerable populations from potential impacts. This study contributes to the existing literature by providing a contextual understanding of equity considerations in the deployment of emerging technologies and offers practical insights for policymakers and industry practitioners. It may provide a catalyst for integrating equity into the planning and implementation of smart transportation systems, ensuring that these technologies benefit all members of society.
- 1 May 2025
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 41  (3)
Examining Critical Factors Affecting Urban Highway Construction Contract Times
- 1 May 2025
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 41  (3)
Examining Critical Factors Affecting Urban Highway Construction Contract Times
- 1 December 2024
- Published by American Society of Civil Engineers (ASCE) in ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
- Vol. 10  (4)
Enhancing Reliability of Construction Contingency Estimation at the Scoping Phase through Historical Cost Data Analysis
- 1 December 2024
- Published by American Society of Civil Engineers (ASCE) in ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
- Vol. 10  (4)
Enhancing Reliability of Construction Contingency Estimation at the Scoping Phase through Historical Cost Data Analysis
- 1 March 2023
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 39  (2) , 06022002
Determining the Most Economical Work Zone Lengths for Rural Highway Rehabilitation Projects
Despite the wealth of research that has sought to understand the effects of highway work zones, very little definitive information is available concerning the determination of work zone length (WZL) of rural highway rehabilitation projects. Despite its significant impact, adaptive models that holistically estimate reasonable WZLs are very rare. To fill this gap, this study first created a high-confidence data set through a series of scheduling and traffic simulations and subsequently identified critical factors affecting WZL through a descriptive factor analysis. Based on these data sets and findings, a novel decision support framework was developed to determine the most economical WZL in a balanced trade-off between motorists’ inconvenience level induced by traffic disruption and their opportunity cost. The practical applications of the WZL determination framework were then demonstrated through a systematic eight-step procedure, followed by an illustrative use case of an actual project. The results revealed that traffic loading and work zone duration are critical factors, with an important benchmarking point being traffic loading at approximately 41,000 vehicles per day. As the first of its kind, this study will help state transportation agencies devise sounder construction phasing plans by providing a means of establishing WZL that strikes a balance between travelers’ inconvenience and constructability.
- 1 March 2023
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 39  (2) , 06022002
Determining the Most Economical Work Zone Lengths for Rural Highway Rehabilitation Projects
Despite the wealth of research that has sought to understand the effects of highway work zones, very little definitive information is available concerning the determination of work zone length (WZL) of rural highway rehabilitation projects. Despite its significant impact, adaptive models that holistically estimate reasonable WZLs are very rare. To fill this gap, this study first created a high-confidence data set through a series of scheduling and traffic simulations and subsequently identified critical factors affecting WZL through a descriptive factor analysis. Based on these data sets and findings, a novel decision support framework was developed to determine the most economical WZL in a balanced trade-off between motorists’ inconvenience level induced by traffic disruption and their opportunity cost. The practical applications of the WZL determination framework were then demonstrated through a systematic eight-step procedure, followed by an illustrative use case of an actual project. The results revealed that traffic loading and work zone duration are critical factors, with an important benchmarking point being traffic loading at approximately 41,000 vehicles per day. As the first of its kind, this study will help state transportation agencies devise sounder construction phasing plans by providing a means of establishing WZL that strikes a balance between travelers’ inconvenience and constructability.
- 1 February 2023
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 149  (2) , 04022176
Project Phase–Based Contingency Adjustment Framework for Infrastructure Renewal Projects
Given the importance of accurate contingency estimation to properly absorb cost fluctuations, there have been enormous efforts to identify risk factors and measure contingency in roadway projects. However, no study has proposed a contingency framework that reflects the linkage effects of factors through the project phases. To this end, this research develops a project phase-based contingency adjustment framework using a path analysis drawing on a dataset of 1,053 rehabilitation, reconstruction, and resurfacing (3R) roadway projects in Florida. In particular, our framework incorporates the sequential effects of factors through the lenses of project phases from planning and bidding and contract to construction and completion. The developed path model shows that individual factors may have direct and/or indirect impacts on project costs. The results of this study can be applied to better contingency and cost estimation and proper risk management in the preconstruction phases of roadway renewal projects.
- 1 February 2023
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 149  (2) , 04022176
Project Phase–Based Contingency Adjustment Framework for Infrastructure Renewal Projects
Given the importance of accurate contingency estimation to properly absorb cost fluctuations, there have been enormous efforts to identify risk factors and measure contingency in roadway projects. However, no study has proposed a contingency framework that reflects the linkage effects of factors through the project phases. To this end, this research develops a project phase-based contingency adjustment framework using a path analysis drawing on a dataset of 1,053 rehabilitation, reconstruction, and resurfacing (3R) roadway projects in Florida. In particular, our framework incorporates the sequential effects of factors through the lenses of project phases from planning and bidding and contract to construction and completion. The developed path model shows that individual factors may have direct and/or indirect impacts on project costs. The results of this study can be applied to better contingency and cost estimation and proper risk management in the preconstruction phases of roadway renewal projects.
- 1 November 2022
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 38  (6) , 04022061
Integration of Schedule, Cost, Traffic, and Risk into the Determination of Construction Contract Times
Balancing schedule, cost, mobility, and livability when planning urban highway projects built under accelerated contract provisions is a daunting task. Despite the wealth of research analyzing the effects of highway construction alternatives, holistic studies systemically integrating the scheduling, cost, and traffic risk-related aspects of accelerated highway projects to determine the most economical plans and contract times are rare. To fill this gap, this study developed a novel seven-step approach to choosing the most cost-effective construction alternatives and contract times through balanced tradeoffs that reduce disruption to the traveling public while minimizing construction time and road user cost. This study blends existing schedule and mobility impact assessment techniques with a risk analysis under accelerated construction conditions for the integration of schedule, cost, traffic, and risk into the determination of the most economical construction contract times. A best use case based on an actual project was also developed according to these seven steps, validating the practicality of the proposed systematic approach. This study will help state transportation agencies by providing a systematic integrative approach to decision-making, thus allowing for well-informed and optimally efficient choices among all available options.
- 1 November 2022
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 38  (6) , 04022061
Integration of Schedule, Cost, Traffic, and Risk into the Determination of Construction Contract Times
Balancing schedule, cost, mobility, and livability when planning urban highway projects built under accelerated contract provisions is a daunting task. Despite the wealth of research analyzing the effects of highway construction alternatives, holistic studies systemically integrating the scheduling, cost, and traffic risk-related aspects of accelerated highway projects to determine the most economical plans and contract times are rare. To fill this gap, this study developed a novel seven-step approach to choosing the most cost-effective construction alternatives and contract times through balanced tradeoffs that reduce disruption to the traveling public while minimizing construction time and road user cost. This study blends existing schedule and mobility impact assessment techniques with a risk analysis under accelerated construction conditions for the integration of schedule, cost, traffic, and risk into the determination of the most economical construction contract times. A best use case based on an actual project was also developed according to these seven steps, validating the practicality of the proposed systematic approach. This study will help state transportation agencies by providing a systematic integrative approach to decision-making, thus allowing for well-informed and optimally efficient choices among all available options.
- 1 May 2022
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 38  (3) , 05022006
Economical Validation of Residential Solar Power Investment: A Cost–Benefit Analysis Approach
The externalities of investment decisions with regard to residential photovoltaic (PV) systems have been changing rapidly in recent years. This study thoroughly explored these fast-changing dynamics by investigating the costs and benefits of PV investment. Five case studies were analyzed to populate the generalized observations of various PV investment conditions. This research proves that the initially high one-time installation cost can be recouped by measured benefits, although the level of return may vary from state to state depending largely on the financial incentives provided. For those enjoying either low electricity prices or peak sun hours, the results of this analysis did not support the installation of a PV system. These findings provide up-to-date benchmarking results for PV investments that homeowners can reference when assessing the costs and benefits associated with the adoption of PV systems.
- 1 May 2022
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 38  (3) , 05022006
Economical Validation of Residential Solar Power Investment: A Cost–Benefit Analysis Approach
The externalities of investment decisions with regard to residential photovoltaic (PV) systems have been changing rapidly in recent years. This study thoroughly explored these fast-changing dynamics by investigating the costs and benefits of PV investment. Five case studies were analyzed to populate the generalized observations of various PV investment conditions. This research proves that the initially high one-time installation cost can be recouped by measured benefits, although the level of return may vary from state to state depending largely on the financial incentives provided. For those enjoying either low electricity prices or peak sun hours, the results of this analysis did not support the installation of a PV system. These findings provide up-to-date benchmarking results for PV investments that homeowners can reference when assessing the costs and benefits associated with the adoption of PV systems.
- 6 January 2022
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2676  (4) , 790-800
Effects of Flexible Notice-to-Proceed Provisions on the Performance of Transportation Infrastructure Projects
When alternative contracting techniques are considered, one innovative approach for assuring the performance of a transportation infrastructure project is offering contractors flexibility about when they start the project. Although such flexible notice-to-proceed (NTP) provisions are becoming more common, quantitative studies examining their impact on project performance are nonexistent. This study investigates the likely effects of flexible NTP provisions on competitive bidding, bid prices, and contract time. A dataset gathered from the North Carolina Department of Transportation, United States, was carefully stratified by type and size of project to allow for unbiased analysis. The results from the hypothesis testing revealed that projects with flexible NTP provisions were more competitive in relation to bidding. The results also indicated a positive correlation between the length of flexible time window and award growth. This study is the first of its kind and will help state transportation agencies make better-informed decisions by providing a point of reference when adopting NTP provisions for alternative contracting projects.
- 6 January 2022
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2676  (4) , 790-800
Effects of Flexible Notice-to-Proceed Provisions on the Performance of Transportation Infrastructure Projects
When alternative contracting techniques are considered, one innovative approach for assuring the performance of a transportation infrastructure project is offering contractors flexibility about when they start the project. Although such flexible notice-to-proceed (NTP) provisions are becoming more common, quantitative studies examining their impact on project performance are nonexistent. This study investigates the likely effects of flexible NTP provisions on competitive bidding, bid prices, and contract time. A dataset gathered from the North Carolina Department of Transportation, United States, was carefully stratified by type and size of project to allow for unbiased analysis. The results from the hypothesis testing revealed that projects with flexible NTP provisions were more competitive in relation to bidding. The results also indicated a positive correlation between the length of flexible time window and award growth. This study is the first of its kind and will help state transportation agencies make better-informed decisions by providing a point of reference when adopting NTP provisions for alternative contracting projects.