Dong Zhihong
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Dong Zhihong has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
- Aiqing Wu
Key Laboratory of Geotechnical Mechanics and Engineering of Ministry of Water Resources, Changjiang River Scientific Research Institute, Wuhan, China
1 shared publication Ding Xiuli
1 shared publication- Haoming Li
Bytedance, Beijing, China
1 shared publication - Jianfeng Tong
Tencent, Beijing, China
1 shared publication - Jing Fu
Department of Mechanical and Aerospace Engineering Monash University Clayton Victoria Australia
1 shared publication - Qiming Liu
Institute of Computing Technology, Chinese Academy of Sciences & University of Chinese Academy of Sciences, Beijing, China
1 shared publication
Latest Publications
- Open Access
- 18 July 2023
- Published by Association for Computing Machinery (ACM)
- p. 1406-1415
Online Conversion Rate Prediction via Neural Satellite Networks in Delayed Feedback Advertising
- 18 July 2023
- Published by Association for Computing Machinery (ACM)
- p. 1406-1415
Open AccessOnline Conversion Rate Prediction via Neural Satellite Networks in Delayed Feedback Advertising
- 8 July 2021
- Published by Taylor & Francis
- p. 75-78
Stability study on the surrounding rock of the underground powerhouse in Shui Buya project by DDA
In order to evaluate the stability and excavated deformation of the underground powerhouse, DDA is used as one of numerical methods during the design stage. In this paper, by means of DDA, the development of deformation and state of stress for the main opening are studied under two situations of without reinforcement and reinforcement by rockbolts, and the maximum displacement and locations of they occurring are given. The computation results show the underground cavern after reinforcement using system bolts is stable, and bolts decrease effectively the deformation of rock masses surrounding the opening.
- 8 July 2021
- Published by Taylor & Francis
- p. 75-78
Stability study on the surrounding rock of the underground powerhouse in Shui Buya project by DDA
In order to evaluate the stability and excavated deformation of the underground powerhouse, DDA is used as one of numerical methods during the design stage. In this paper, by means of DDA, the development of deformation and state of stress for the main opening are studied under two situations of without reinforcement and reinforcement by rockbolts, and the maximum displacement and locations of they occurring are given. The computation results show the underground cavern after reinforcement using system bolts is stable, and bolts decrease effectively the deformation of rock masses surrounding the opening.