Witold Daniluk
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Witold Daniluk has a total of 21 co-authors. Here are the top co-authors by number of shared publications:
- Andrzej Kotarba
DAI, Institute of Nuclear Physics PAN, Krakow, malopolskie, Poland
1 shared publication - Andrzej Proszkowiec
DAI, Institute of Nuclear Physics PAN, Krakow, malopolskie, Poland
1 shared publication - Andrzej Siemko
CERN, Geneva Switzerland CH-1211
1 shared publication - Artur Krempa
Institute of Nuclear Physics PAN, Krakow, malopolskie, Poland
1 shared publication - Damian Wojas
Division of Scientific Equipment, Infrastructure Construction, Institute of Nuclear Physics Polish Academy of Sciences, Krakow, Poland
1 shared publication - Dominik Grzadziel
Institute of Nuclear Physics PAN, Krakow, malopolskie, Poland
1 shared publication
Latest Publications
- Open Access
- 17 March 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 31 (5) , 1-4
Preparation and Execution of the Electrical Quality Assurance Program On the LHC Superconducting Circuits During the Second Long Shutdown
The electrical quality assurance (ELQA) of the superconducting circuits of CERN's Large Hadron Collider (LHC) during its second Long Shutdown (LS2) requires the execution of vast measurement campaigns. Each of 1658 electrical circuits as well as the instrumentation of each of the 1746 individual cryo-assemblies housing magnets, bus-bars and other components of the superconducting circuits, has to undergo a series of tests. At the beginning of the shutdown the tests are performed before and after the warm-up from cryogenic temperatures. The same tests are repeated at the end of the shutdown, this time before and after the cool-down. As part of the dipole bypass diode insulation consolidation project and due to the replacement of a few non-conform magnets, additional electrical tests and measurements had to be performed throughout the shutdown period. With each measurement, electrical parameters like resistance, complex impedance, and the quality of the insulation are verified and stored for future reference. Due to the many thousands of measurements to be performed, multiple automated mobile test benches had to be developed for the different test types along with dedicated database and analysis software applications for the documentation and follow-up of the test results and the non-conformities observed.
- 17 March 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 31 (5) , 1-4
Open AccessPreparation and Execution of the Electrical Quality Assurance Program On the LHC Superconducting Circuits During the Second Long Shutdown
The electrical quality assurance (ELQA) of the superconducting circuits of CERN's Large Hadron Collider (LHC) during its second Long Shutdown (LS2) requires the execution of vast measurement campaigns. Each of 1658 electrical circuits as well as the instrumentation of each of the 1746 individual cryo-assemblies housing magnets, bus-bars and other components of the superconducting circuits, has to undergo a series of tests. At the beginning of the shutdown the tests are performed before and after the warm-up from cryogenic temperatures. The same tests are repeated at the end of the shutdown, this time before and after the cool-down. As part of the dipole bypass diode insulation consolidation project and due to the replacement of a few non-conform magnets, additional electrical tests and measurements had to be performed throughout the shutdown period. With each measurement, electrical parameters like resistance, complex impedance, and the quality of the insulation are verified and stored for future reference. Due to the many thousands of measurements to be performed, multiple automated mobile test benches had to be developed for the different test types along with dedicated database and analysis software applications for the documentation and follow-up of the test results and the non-conformities observed.