Dianju Wang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Dianju Wang has a total of 23 co-authors. Here are the top co-authors by number of shared publications:
- Zhandong Li
Sanya Offshore Oil & Gas Research Institute, Northeast Petroleum University, Sanya 572025, China
2 shared publications - Bicheng Gan
School of Petroleum Engineering, Northeast Petroleum University, Daqing 163318, China
1 shared publication Fahao Yu
Heilongjiang Key Laboratory of Gas Hydrate Efficient Development, Daqing, China
1 shared publication- Fahao Yu
Bohai Oilfield Research Institute of CNOOC Ltd., Tianjin 300452, China
1 shared publication - Fahao Yu
Bohai Oilfield Research Institute of CNOOC Ltd., Tianjin 300399, China
1 shared publication - Haixiang Zhang
Key Laboratory for Enhanced Oil & Gas Recovery of the Ministry of Education
1 shared publication
Latest Publications
- Open Access
Identification of Key Parameters for Fracturing and Driving Oil in Low-Permeability Offshore Reservoirs Based on Fuzzy Analytic Hierarchy Process and Numerical Simulation
The fracturing and driving oil technology used in shale oil provides a new approach for the development of offshore low-permeability reservoirs. However, the main control role of technical parameters is unclear, resulting in unsatisfactory accuracy and effectiveness of the enhanced oil recovery plan. For this reason, this study is based on the production and process data of five wells in the WZ oilfield. Fuzzy analytic hierarchical process analysis method (FAHP) was used to evaluate the parameter weights. Combined with numerical simulation technology, the evaluation results were verified by geological-engineering integration. The results show that in offshore low-permeability oilfields, the reservoir pressure coefficient has the greatest influence on the fracturing and oil repelling effect. The comprehensive weight reaches 0.450 compared to not adopting hydraulic fracturing oil displacement technology. This improves the recovery rate by 10.19% in 5 years. The surfactant concentration and the residual oil saturation of the reservoir rank are second, with a comprehensive weight of 0.219. Finally is the effective thickness of the reservoir, with a comprehensive weight of 0.113. In this study, the key parameters of fracturing and oil repelling in offshore low-permeability reservoirs are clarified. It provides theoretical basis and practical support for improving the success rate of well selection, layer selection and recovery capacity.
Open AccessIdentification of Key Parameters for Fracturing and Driving Oil in Low-Permeability Offshore Reservoirs Based on Fuzzy Analytic Hierarchy Process and Numerical Simulation
The fracturing and driving oil technology used in shale oil provides a new approach for the development of offshore low-permeability reservoirs. However, the main control role of technical parameters is unclear, resulting in unsatisfactory accuracy and effectiveness of the enhanced oil recovery plan. For this reason, this study is based on the production and process data of five wells in the WZ oilfield. Fuzzy analytic hierarchical process analysis method (FAHP) was used to evaluate the parameter weights. Combined with numerical simulation technology, the evaluation results were verified by geological-engineering integration. The results show that in offshore low-permeability oilfields, the reservoir pressure coefficient has the greatest influence on the fracturing and oil repelling effect. The comprehensive weight reaches 0.450 compared to not adopting hydraulic fracturing oil displacement technology. This improves the recovery rate by 10.19% in 5 years. The surfactant concentration and the residual oil saturation of the reservoir rank are second, with a comprehensive weight of 0.219. Finally is the effective thickness of the reservoir, with a comprehensive weight of 0.113. In this study, the key parameters of fracturing and oil repelling in offshore low-permeability reservoirs are clarified. It provides theoretical basis and practical support for improving the success rate of well selection, layer selection and recovery capacity.
- Open Access
The Control Effect of Equipment Operation on the Formation of Wellbore Hydrates Under the Production Conditions of Deepwater Gas Wells
Equipment operations during deepwater gas well production increase the risk of hydrate generation. In this paper, the density model of fluid changes caused by equipment operations during wellbore production is improved based on the temperature and pressure model of wellbore of deepwater gas wells. The risk area and rate of hydrate generation in the wellbore by equipment operation under production conditions are analysed. The roles of tool size, tool movement speed, and gas well production on the control of wellbore temperature and pressure were clarified. The results of the study found that tool size affects wellbore hydrate generation with a critical value. When the percentage of tool size is less than 50%, the larger the tool size is, the greater the extent of hydrate generation and deposition rate in the wellbore. After 50%, the larger the tool size, the smaller the hydrate generation range and deposition rate. The gas density in the wellbore does not change much under the condition of different movement speeds of tools of the same size. That is, the movement speed of the tool has almost no effect on the wellbore temperature and pressure fields and does not change the risk of hydrate generation. Production rate is another key factor in controlling hydrates. As the production rate increases, the fluid density in the wellbore gradually decreases, and the risk of hydrate generation decreases. And when the tool moves below the mudline, the wellbore temperature, pressure field, and wellbore hydrate generation rate become less affected by the tool size. The size of the tool mainly affects the hydrate generation risk in the wellbore above the mudline.
Open AccessThe Control Effect of Equipment Operation on the Formation of Wellbore Hydrates Under the Production Conditions of Deepwater Gas Wells
Equipment operations during deepwater gas well production increase the risk of hydrate generation. In this paper, the density model of fluid changes caused by equipment operations during wellbore production is improved based on the temperature and pressure model of wellbore of deepwater gas wells. The risk area and rate of hydrate generation in the wellbore by equipment operation under production conditions are analysed. The roles of tool size, tool movement speed, and gas well production on the control of wellbore temperature and pressure were clarified. The results of the study found that tool size affects wellbore hydrate generation with a critical value. When the percentage of tool size is less than 50%, the larger the tool size is, the greater the extent of hydrate generation and deposition rate in the wellbore. After 50%, the larger the tool size, the smaller the hydrate generation range and deposition rate. The gas density in the wellbore does not change much under the condition of different movement speeds of tools of the same size. That is, the movement speed of the tool has almost no effect on the wellbore temperature and pressure fields and does not change the risk of hydrate generation. Production rate is another key factor in controlling hydrates. As the production rate increases, the fluid density in the wellbore gradually decreases, and the risk of hydrate generation decreases. And when the tool moves below the mudline, the wellbore temperature, pressure field, and wellbore hydrate generation rate become less affected by the tool size. The size of the tool mainly affects the hydrate generation risk in the wellbore above the mudline.
- Open Access
Evaluation of the Performance of a Composite Water Control Process for Offshore Bottom Water Fractured Gas Reservoirs
Natural gas, as one of the main energy sources of the modern clean energy system, is also an important raw material for the chemical industry, and the stable extraction of natural gas reservoirs is often affected by bottom water. It is difficult to control water in natural gas reservoirs, while fractured gas reservoirs are even more demanding. This is due to the complexity of the seepage laws of gas and water in fractures, resulting in the poor applicability of conventional processes for water control. Continuous research is needed to propose a process with effective control capabilities for bottom-water fractured gas reservoirs. Aiming at the above difficulties, this paper is based on a large-scale three-dimensional physical simulation device to carry out physical model design and simulation results testing and analysis. The water control ability of the combination of density-segmented sieve tubes and continuous packers in fractured gas reservoirs is explored. The physical simulation results show that the fracture distribution characteristics control the upward transportation path of bottom water. According to the segmentation characteristics of the fractures at the horizontal section location, optimizing the number of horizontal well screen tube segments and the density of boreholes reduces the cone-in velocity of bottom water before connecting the fractures to a certain extent. And the combined process has different degrees of water control ability for the three stages of bottom water transportation from the fractured gas reservoir to the production well. As the degree of water in the production well increases, the water control ability of the process gradually decreases. After the implementation of the water control process, the water-free gas production period was extended by about 6.84%, and the total production time was extended by about 6.46%. After the shutdown of the horizontal wells, the reduction in daily water production can still reach 21% compared to the natural extraction. The results of this research can provide process suggestions for water control in offshore fractured reservoirs and further ensure stable production in offshore fractured gas reservoirs.
Open AccessEvaluation of the Performance of a Composite Water Control Process for Offshore Bottom Water Fractured Gas Reservoirs
Natural gas, as one of the main energy sources of the modern clean energy system, is also an important raw material for the chemical industry, and the stable extraction of natural gas reservoirs is often affected by bottom water. It is difficult to control water in natural gas reservoirs, while fractured gas reservoirs are even more demanding. This is due to the complexity of the seepage laws of gas and water in fractures, resulting in the poor applicability of conventional processes for water control. Continuous research is needed to propose a process with effective control capabilities for bottom-water fractured gas reservoirs. Aiming at the above difficulties, this paper is based on a large-scale three-dimensional physical simulation device to carry out physical model design and simulation results testing and analysis. The water control ability of the combination of density-segmented sieve tubes and continuous packers in fractured gas reservoirs is explored. The physical simulation results show that the fracture distribution characteristics control the upward transportation path of bottom water. According to the segmentation characteristics of the fractures at the horizontal section location, optimizing the number of horizontal well screen tube segments and the density of boreholes reduces the cone-in velocity of bottom water before connecting the fractures to a certain extent. And the combined process has different degrees of water control ability for the three stages of bottom water transportation from the fractured gas reservoir to the production well. As the degree of water in the production well increases, the water control ability of the process gradually decreases. After the implementation of the water control process, the water-free gas production period was extended by about 6.84%, and the total production time was extended by about 6.46%. After the shutdown of the horizontal wells, the reduction in daily water production can still reach 21% compared to the natural extraction. The results of this research can provide process suggestions for water control in offshore fractured reservoirs and further ensure stable production in offshore fractured gas reservoirs.
- Open Access
- 27 May 2022
- Published by Frontiers Media SA in Frontiers in Earth Science
- Vol. 10
Evaluation of the Effectiveness and Adaptability of a Composite Water Control Process for Horizontal Wells in Deepwater Gas Reservoirs
Deepwater gas fields have high bottom water energy and a high risk of seeing water. Higher requirements are put forward for the water control process to control the water effect. This article is based on the actual background and well design of the X gas field in the South China Sea and on three sets of physical simulation experiments and three sets of numerical simulation experiments. An analysis and comparison of the water control effect of a combination of continuous packer, continuous packer and variable density screen tube, and their adaptability evaluation in deepwater gas reservoirs were performed. The results obtained from the numerical and physical simulations are consistent. The experimental results show that the water control process of a continuous packer is mainly based on the water-seeing and water-blocking ability. It is less capable of extending the time to produce water in the horizontal section. However, its water-blocking ability is strong and is able to seal the water spot quickly. It extends the total production time by 12.29% and increases the total gas production by 5.96%; the combined water control process of the continuous packer and variable density screen tube can effectively play their respective advantages of water control. The combination of the continuous packer and variable density screen tube can effectively be advantageous of their respective water control processes, enabling the gas–water interface to advance in a balanced manner, extending the water-free gas recovery period by 11.61%, extending the total gas production time by 15.76%, and increasing the total gas production volume by 13.75%. Both water control processes have good applicability in deepwater gas fields and have certain sand control capability. It is conducive to the one-time completion operation for the commissioning of deepwater gas fields.
- 27 May 2022
- Published by Frontiers Media SA in Frontiers in Earth Science
- Vol. 10
Open AccessEvaluation of the Effectiveness and Adaptability of a Composite Water Control Process for Horizontal Wells in Deepwater Gas Reservoirs
Deepwater gas fields have high bottom water energy and a high risk of seeing water. Higher requirements are put forward for the water control process to control the water effect. This article is based on the actual background and well design of the X gas field in the South China Sea and on three sets of physical simulation experiments and three sets of numerical simulation experiments. An analysis and comparison of the water control effect of a combination of continuous packer, continuous packer and variable density screen tube, and their adaptability evaluation in deepwater gas reservoirs were performed. The results obtained from the numerical and physical simulations are consistent. The experimental results show that the water control process of a continuous packer is mainly based on the water-seeing and water-blocking ability. It is less capable of extending the time to produce water in the horizontal section. However, its water-blocking ability is strong and is able to seal the water spot quickly. It extends the total production time by 12.29% and increases the total gas production by 5.96%; the combined water control process of the continuous packer and variable density screen tube can effectively play their respective advantages of water control. The combination of the continuous packer and variable density screen tube can effectively be advantageous of their respective water control processes, enabling the gas–water interface to advance in a balanced manner, extending the water-free gas recovery period by 11.61%, extending the total gas production time by 15.76%, and increasing the total gas production volume by 13.75%. Both water control processes have good applicability in deepwater gas fields and have certain sand control capability. It is conducive to the one-time completion operation for the commissioning of deepwater gas fields.