Qinglou Li
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Qinglou Li has a total of 12 co-authors. Here are the top co-authors by number of shared publications:
- Zhongsheng Tan
Key Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, China
5 shared publications - Baojin Zhang
Key Laboratory of the Ministry of Education for Urban Underground Engineering, Beijing Jiaotong University, Beijing 100044, China
3 shared publications - Linfeng Li
Key Laboratory of Urban Underground Engineering, Ministry of Education, Beijing Jiaotong University, Beijing 100044, China
2 shared publications - Yuanzhuo Li
Key Laboratory of Urban Underground Engineering, Ministry of Education, Beijing Jiaotong University, Beijing 100044, China
2 shared publications Binghong Wan
China Railway 25th Bureau Group Co., Ltd., Guangzhou, Guangdong, 510600, China
1 shared publication- Dawei Chen
China Railway 16th Bureau Group Co., Ltd., Beijing 100018, China
1 shared publication
Latest Publications
- Open Access
- 28 August 2026
- Published by MDPI AG in Sustainability
- Vol. 18 (17) , 8837
Risk Pathway Identification and Hierarchical Management of Water Mud Inrush in a Complex Urban Tunnel Group Beneath a Water-Rich Spoil Disposal Landfill: Implications for Sustainable Tunnel Construction
When urban underground interchange tunnels pass beneath a water-rich spoil-disposal landfill, water–mud inrush risk is jointly controlled by artificial fill, geological conditions, tunnel-group construction disturbance, and environmental constraints. This study investigates the section beneath the Bujiuwo spoil-disposal landfill in the North Extension Project of Qiaocheng East Road, Shenzhen, and aims to identify key risk factors and reveal their hierarchical transmission mechanism. Based on engineering investigation data, design documents, construction risk sources, and expert questionnaires, an indicator system containing 18 risk factors was established. The decision-making trial and evaluation laboratory method was used to calculate the influence degree, affected degree, centrality, causality, and centrality-derived weight of each factor. Adversarial interpretive structural modeling was then introduced to extract the topological hierarchy and identify key coupling loops. The results show that structural fissure water pressure, vertical clearance, landfill water level, emergency pumping and drainage capacity, and spoil-fill thickness act as key nodes in the DEMATEL risk-relation network. Two key loops were identified: the landfill water level–structural fissure water pressure loop and the vertical clearance–additional stress of tunnel group–damage rate of anti-seepage membrane loop. A hierarchical control strategy is proposed, including source control, channel blockage, construction disturbance control, monitoring, early warning, and emergency management. From a sustainability perspective, the proposed framework supports groundwater protection, pollution prevention, maintenance of landfill containment integrity, and reduction in construction-induced environmental risks.
- 28 August 2026
- Published by MDPI AG in Sustainability
- Vol. 18 (17) , 8837
Open AccessRisk Pathway Identification and Hierarchical Management of Water Mud Inrush in a Complex Urban Tunnel Group Beneath a Water-Rich Spoil Disposal Landfill: Implications for Sustainable Tunnel Construction
When urban underground interchange tunnels pass beneath a water-rich spoil-disposal landfill, water–mud inrush risk is jointly controlled by artificial fill, geological conditions, tunnel-group construction disturbance, and environmental constraints. This study investigates the section beneath the Bujiuwo spoil-disposal landfill in the North Extension Project of Qiaocheng East Road, Shenzhen, and aims to identify key risk factors and reveal their hierarchical transmission mechanism. Based on engineering investigation data, design documents, construction risk sources, and expert questionnaires, an indicator system containing 18 risk factors was established. The decision-making trial and evaluation laboratory method was used to calculate the influence degree, affected degree, centrality, causality, and centrality-derived weight of each factor. Adversarial interpretive structural modeling was then introduced to extract the topological hierarchy and identify key coupling loops. The results show that structural fissure water pressure, vertical clearance, landfill water level, emergency pumping and drainage capacity, and spoil-fill thickness act as key nodes in the DEMATEL risk-relation network. Two key loops were identified: the landfill water level–structural fissure water pressure loop and the vertical clearance–additional stress of tunnel group–damage rate of anti-seepage membrane loop. A hierarchical control strategy is proposed, including source control, channel blockage, construction disturbance control, monitoring, early warning, and emergency management. From a sustainability perspective, the proposed framework supports groundwater protection, pollution prevention, maintenance of landfill containment integrity, and reduction in construction-induced environmental risks.
- Open Access
- 19 November 2025
- Published by Springer Nature in Scientific Reports
- Vol. 15 (1) , 40697
Research on risk factors identification and optimization strategies for railway tunnel construction in ecologically sensitive areas
When constructing railway tunnels in ecologically sensitive areas, numerous risks with high interdependence exist. Current risk identification methods are often unsystematic, prone to significant omissions, and may jeopardize construction safety and the ecological environment. This study uses the Xi'ning - Huangshengguan section of the Xi'ning - Chengdu Railway as a case study to quantitatively identify and hierarchically analyze the key influencing factors of railway tunnel construction risks. Seventeen core influencing factors were first distilled through literature review and expert questionnaires. Then, a DEMATEL-AISM hybrid model was employed to analyze expert rating data from levels 0-4, constructing a five - level adversarial hierarchical structure. The results show that in terms of centrality, environmental awareness (S16), regulatory system (S17), and construction methods (S8) rank the top three with centralities of 9.48, 9.40, and 8.90, indicating their significant system - wide impact. Causality analysis reveals that climate condition (S4) and construction season (S3) are the strongest root causes, while drainage system design (S11) and pollutant handling (S13) are most susceptible to other factors. By controlling four surface - level factors (construction equipment and materials S9, drainage system design S11, spoil dump design S12, and pollutant handling S13), a risk reduction rate of 62% can be achieved. This study offers a clear prioritization of risk factors for railway tunnel construction in ecologically sensitive areas, assisting projects in more effectively reducing risks during planning and construction.
- 19 November 2025
- Published by Springer Nature in Scientific Reports
- Vol. 15 (1) , 40697
Open AccessResearch on risk factors identification and optimization strategies for railway tunnel construction in ecologically sensitive areas
When constructing railway tunnels in ecologically sensitive areas, numerous risks with high interdependence exist. Current risk identification methods are often unsystematic, prone to significant omissions, and may jeopardize construction safety and the ecological environment. This study uses the Xi'ning - Huangshengguan section of the Xi'ning - Chengdu Railway as a case study to quantitatively identify and hierarchically analyze the key influencing factors of railway tunnel construction risks. Seventeen core influencing factors were first distilled through literature review and expert questionnaires. Then, a DEMATEL-AISM hybrid model was employed to analyze expert rating data from levels 0-4, constructing a five - level adversarial hierarchical structure. The results show that in terms of centrality, environmental awareness (S16), regulatory system (S17), and construction methods (S8) rank the top three with centralities of 9.48, 9.40, and 8.90, indicating their significant system - wide impact. Causality analysis reveals that climate condition (S4) and construction season (S3) are the strongest root causes, while drainage system design (S11) and pollutant handling (S13) are most susceptible to other factors. By controlling four surface - level factors (construction equipment and materials S9, drainage system design S11, spoil dump design S12, and pollutant handling S13), a risk reduction rate of 62% can be achieved. This study offers a clear prioritization of risk factors for railway tunnel construction in ecologically sensitive areas, assisting projects in more effectively reducing risks during planning and construction.
- Open Access
- 20 February 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (5) , 2258
Determining a Suitable Reinforcement Strategy for TBM Advance in a Gully Fault Zone Without Jamming—A Numerical Analysis
This study aims to identify the most suitable pre-reinforcement support measures to prevent TBM jamming when passing through the fractured zone of a gully fault. Given the high likelihood of jamming in such areas, the research focuses on selecting the most effective support system by considering factors such as surrounding rock stability, strata displacement, support structure stress, and cost-effectiveness. Theoretical analysis is employed to predict TBM jamming risks, based on design data, a 10 m gully unit and fractured rock mass were established at 75 m in the excavation direction with assigned parameters. Support effects of pipe curtains, grouting, anchors, and arch supports were analyzed under four conditions: chemical grouting, conduit installation, advanced pipe grouting, and double-layer pipe grouting. On-site verification reveals that TBM jamming occurs when the resisting torque on the cutter exceeds the maximum torque the cutter can generate. For the gully fault, pre-reinforcement measures are essential to stabilize the surrounding rock. Among the different methods, surface drilling reinforcement is the most effective. It significantly improves the surrounding rock’s stability, reducing the plastic zone’s depth by approximately 52.3% compared to the advanced pipe shed method. The axial force on the anchors decreases by 77.9–83.8%, arch stress is reduced by 68.9–90.8%, and tunnel deformation is minimized by 2.13–50.78%, all of which contribute to enhancing the safety of the initial support structure. On-site coring results, TBM boring parameters, and deformation monitoring data confirm that the surface drilling pre-reinforcement method outperforms the grouting pre-reinforcement for the pipe shed, ensuring the safe excavation of TBM in the gully fault conditions. These findings provide valuable insights for TBM tunnel construction in similar geological environments.
- 20 February 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (5) , 2258
Open AccessDetermining a Suitable Reinforcement Strategy for TBM Advance in a Gully Fault Zone Without Jamming—A Numerical Analysis
This study aims to identify the most suitable pre-reinforcement support measures to prevent TBM jamming when passing through the fractured zone of a gully fault. Given the high likelihood of jamming in such areas, the research focuses on selecting the most effective support system by considering factors such as surrounding rock stability, strata displacement, support structure stress, and cost-effectiveness. Theoretical analysis is employed to predict TBM jamming risks, based on design data, a 10 m gully unit and fractured rock mass were established at 75 m in the excavation direction with assigned parameters. Support effects of pipe curtains, grouting, anchors, and arch supports were analyzed under four conditions: chemical grouting, conduit installation, advanced pipe grouting, and double-layer pipe grouting. On-site verification reveals that TBM jamming occurs when the resisting torque on the cutter exceeds the maximum torque the cutter can generate. For the gully fault, pre-reinforcement measures are essential to stabilize the surrounding rock. Among the different methods, surface drilling reinforcement is the most effective. It significantly improves the surrounding rock’s stability, reducing the plastic zone’s depth by approximately 52.3% compared to the advanced pipe shed method. The axial force on the anchors decreases by 77.9–83.8%, arch stress is reduced by 68.9–90.8%, and tunnel deformation is minimized by 2.13–50.78%, all of which contribute to enhancing the safety of the initial support structure. On-site coring results, TBM boring parameters, and deformation monitoring data confirm that the surface drilling pre-reinforcement method outperforms the grouting pre-reinforcement for the pipe shed, ensuring the safe excavation of TBM in the gully fault conditions. These findings provide valuable insights for TBM tunnel construction in similar geological environments.
- Open Access
- 3 December 2024
- Published by MDPI AG in Sustainability
- Vol. 16 (23) , 10594
Research on the Mechanism of Load Transfer Structures in the Construction Process of “Internal Support—Large Block” Prefabricated Subway Stations
In the context of rising global temperatures, countries around the world are increasingly tailoring their own “carbon neutrality” plans. China has also formulated its “dual-carbon” goals, and the construction industry is gradually transitioning towards prefabrication to reduce carbon emissions. This paper uses the Sha Pu Station of Shenzhen’s Metro Line 12 as a case study by which to explore the effects and mechanisms of the load transfer structure during the assembly process of prefabricated subway stations. A three-dimensional finite element model considering soil–structure interaction was established using MIDAS GTS NX finite element software, 2018 version. The internal forces, stresses, and deformations of the station structure were compared under two scenarios—with and without the load transfer structure—using a control variable method. The research results indicate that the load transfer structure effectively reduces shear forces, bending moments, and stresses in the station structure; limits lateral displacements during the assembly process; and effectively concentrates the maximum stresses during construction at the location of the load transfer structure, thereby preventing stress concentration phenomena and enhancing the overall stability of the station structure. This study elucidates the role and effectiveness of the load transfer structure during the assembly of prefabricated components in subway stations, providing a reference for the construction of similar prefabricated metro stations.
- 3 December 2024
- Published by MDPI AG in Sustainability
- Vol. 16 (23) , 10594
Open AccessResearch on the Mechanism of Load Transfer Structures in the Construction Process of “Internal Support—Large Block” Prefabricated Subway Stations
In the context of rising global temperatures, countries around the world are increasingly tailoring their own “carbon neutrality” plans. China has also formulated its “dual-carbon” goals, and the construction industry is gradually transitioning towards prefabrication to reduce carbon emissions. This paper uses the Sha Pu Station of Shenzhen’s Metro Line 12 as a case study by which to explore the effects and mechanisms of the load transfer structure during the assembly process of prefabricated subway stations. A three-dimensional finite element model considering soil–structure interaction was established using MIDAS GTS NX finite element software, 2018 version. The internal forces, stresses, and deformations of the station structure were compared under two scenarios—with and without the load transfer structure—using a control variable method. The research results indicate that the load transfer structure effectively reduces shear forces, bending moments, and stresses in the station structure; limits lateral displacements during the assembly process; and effectively concentrates the maximum stresses during construction at the location of the load transfer structure, thereby preventing stress concentration phenomena and enhancing the overall stability of the station structure. This study elucidates the role and effectiveness of the load transfer structure during the assembly of prefabricated components in subway stations, providing a reference for the construction of similar prefabricated metro stations.
- Open Access
- 19 June 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (12) , 7296
Calculation Method for Determining the Wall Displacement and Primary Support Bearing Capacity of Tunnels
The primary support structure of a tunnel often needs various support methods, such as bolts, steel arch frames, and shotcrete. It is of great significance to quickly calculate the displacement of tunnel walls and the bearing capacity of primary supports for guiding construction and ensuring construction safety. In order to solve the above problems, this paper constructs a mechanical model of primary support and analyzes the displacement of a tunnel wall at different construction stages of primary support; based on the Mohr–Coulomb strength criterion, the displacement of the tunnel wall at different stages of the primary support is derived, and the calculation method and process for calculating the bearing capacity of the primary support are given. The accuracy of the proposed method is then verified by an example. Compared with previous methods, the method proposed in this paper considers the support effects of bolts, steel arches, and shotcrete separately and calculates the corresponding displacement of the tunnel wall, which is closer to the actual construction situation. In addition, the bearing capacity of the primary support can be calculated and analyzed. By comparing with the numerical simulation results, it has been proven that the proposed method has a relatively small calculation error. Compared with the numerical simulation results and previous analytical methods, the method proposed in this paper is simpler and faster in calculation; thus, it can quickly assist in the design of tunnel support structures.
- 19 June 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (12) , 7296
Open AccessCalculation Method for Determining the Wall Displacement and Primary Support Bearing Capacity of Tunnels
The primary support structure of a tunnel often needs various support methods, such as bolts, steel arch frames, and shotcrete. It is of great significance to quickly calculate the displacement of tunnel walls and the bearing capacity of primary supports for guiding construction and ensuring construction safety. In order to solve the above problems, this paper constructs a mechanical model of primary support and analyzes the displacement of a tunnel wall at different construction stages of primary support; based on the Mohr–Coulomb strength criterion, the displacement of the tunnel wall at different stages of the primary support is derived, and the calculation method and process for calculating the bearing capacity of the primary support are given. The accuracy of the proposed method is then verified by an example. Compared with previous methods, the method proposed in this paper considers the support effects of bolts, steel arches, and shotcrete separately and calculates the corresponding displacement of the tunnel wall, which is closer to the actual construction situation. In addition, the bearing capacity of the primary support can be calculated and analyzed. By comparing with the numerical simulation results, it has been proven that the proposed method has a relatively small calculation error. Compared with the numerical simulation results and previous analytical methods, the method proposed in this paper is simpler and faster in calculation; thus, it can quickly assist in the design of tunnel support structures.