Linfeng Li
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Linfeng Li has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
- Zhongsheng Tan
Key Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, China
3 shared publications - Baojin Zhang
Key Laboratory of the Ministry of Education for Urban Underground Engineering, Beijing Jiaotong University, Beijing 100044, China
2 shared publications - Qinglou Li
Key Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, China
2 shared publications - Yuanzhuo Li
Key Laboratory of Urban Underground Engineering, Ministry of Education, Beijing Jiaotong University, Beijing 100044, China
2 shared publications - Heng Kong
Beijing Municipal Engineering Group Co., Ltd., Beijing, China
1 shared publication - Jinpeng Zhao
University of Science and Technology Beijing
1 shared publication
Latest Publications
- Open Access
- 20 February 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (5) , 2258
Determining a Suitable Reinforcement Strategy for TBM Advance in a Gully Fault Zone Without Jamming—A Numerical Analysis
This study aims to identify the most suitable pre-reinforcement support measures to prevent TBM jamming when passing through the fractured zone of a gully fault. Given the high likelihood of jamming in such areas, the research focuses on selecting the most effective support system by considering factors such as surrounding rock stability, strata displacement, support structure stress, and cost-effectiveness. Theoretical analysis is employed to predict TBM jamming risks, based on design data, a 10 m gully unit and fractured rock mass were established at 75 m in the excavation direction with assigned parameters. Support effects of pipe curtains, grouting, anchors, and arch supports were analyzed under four conditions: chemical grouting, conduit installation, advanced pipe grouting, and double-layer pipe grouting. On-site verification reveals that TBM jamming occurs when the resisting torque on the cutter exceeds the maximum torque the cutter can generate. For the gully fault, pre-reinforcement measures are essential to stabilize the surrounding rock. Among the different methods, surface drilling reinforcement is the most effective. It significantly improves the surrounding rock’s stability, reducing the plastic zone’s depth by approximately 52.3% compared to the advanced pipe shed method. The axial force on the anchors decreases by 77.9–83.8%, arch stress is reduced by 68.9–90.8%, and tunnel deformation is minimized by 2.13–50.78%, all of which contribute to enhancing the safety of the initial support structure. On-site coring results, TBM boring parameters, and deformation monitoring data confirm that the surface drilling pre-reinforcement method outperforms the grouting pre-reinforcement for the pipe shed, ensuring the safe excavation of TBM in the gully fault conditions. These findings provide valuable insights for TBM tunnel construction in similar geological environments.
- 20 February 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (5) , 2258
Open AccessDetermining a Suitable Reinforcement Strategy for TBM Advance in a Gully Fault Zone Without Jamming—A Numerical Analysis
This study aims to identify the most suitable pre-reinforcement support measures to prevent TBM jamming when passing through the fractured zone of a gully fault. Given the high likelihood of jamming in such areas, the research focuses on selecting the most effective support system by considering factors such as surrounding rock stability, strata displacement, support structure stress, and cost-effectiveness. Theoretical analysis is employed to predict TBM jamming risks, based on design data, a 10 m gully unit and fractured rock mass were established at 75 m in the excavation direction with assigned parameters. Support effects of pipe curtains, grouting, anchors, and arch supports were analyzed under four conditions: chemical grouting, conduit installation, advanced pipe grouting, and double-layer pipe grouting. On-site verification reveals that TBM jamming occurs when the resisting torque on the cutter exceeds the maximum torque the cutter can generate. For the gully fault, pre-reinforcement measures are essential to stabilize the surrounding rock. Among the different methods, surface drilling reinforcement is the most effective. It significantly improves the surrounding rock’s stability, reducing the plastic zone’s depth by approximately 52.3% compared to the advanced pipe shed method. The axial force on the anchors decreases by 77.9–83.8%, arch stress is reduced by 68.9–90.8%, and tunnel deformation is minimized by 2.13–50.78%, all of which contribute to enhancing the safety of the initial support structure. On-site coring results, TBM boring parameters, and deformation monitoring data confirm that the surface drilling pre-reinforcement method outperforms the grouting pre-reinforcement for the pipe shed, ensuring the safe excavation of TBM in the gully fault conditions. These findings provide valuable insights for TBM tunnel construction in similar geological environments.
- Open Access
- 3 December 2024
- Published by MDPI AG in Sustainability
- Vol. 16 (23) , 10594
Research on the Mechanism of Load Transfer Structures in the Construction Process of “Internal Support—Large Block” Prefabricated Subway Stations
In the context of rising global temperatures, countries around the world are increasingly tailoring their own “carbon neutrality” plans. China has also formulated its “dual-carbon” goals, and the construction industry is gradually transitioning towards prefabrication to reduce carbon emissions. This paper uses the Sha Pu Station of Shenzhen’s Metro Line 12 as a case study by which to explore the effects and mechanisms of the load transfer structure during the assembly process of prefabricated subway stations. A three-dimensional finite element model considering soil–structure interaction was established using MIDAS GTS NX finite element software, 2018 version. The internal forces, stresses, and deformations of the station structure were compared under two scenarios—with and without the load transfer structure—using a control variable method. The research results indicate that the load transfer structure effectively reduces shear forces, bending moments, and stresses in the station structure; limits lateral displacements during the assembly process; and effectively concentrates the maximum stresses during construction at the location of the load transfer structure, thereby preventing stress concentration phenomena and enhancing the overall stability of the station structure. This study elucidates the role and effectiveness of the load transfer structure during the assembly of prefabricated components in subway stations, providing a reference for the construction of similar prefabricated metro stations.
- 3 December 2024
- Published by MDPI AG in Sustainability
- Vol. 16 (23) , 10594
Open AccessResearch on the Mechanism of Load Transfer Structures in the Construction Process of “Internal Support—Large Block” Prefabricated Subway Stations
In the context of rising global temperatures, countries around the world are increasingly tailoring their own “carbon neutrality” plans. China has also formulated its “dual-carbon” goals, and the construction industry is gradually transitioning towards prefabrication to reduce carbon emissions. This paper uses the Sha Pu Station of Shenzhen’s Metro Line 12 as a case study by which to explore the effects and mechanisms of the load transfer structure during the assembly process of prefabricated subway stations. A three-dimensional finite element model considering soil–structure interaction was established using MIDAS GTS NX finite element software, 2018 version. The internal forces, stresses, and deformations of the station structure were compared under two scenarios—with and without the load transfer structure—using a control variable method. The research results indicate that the load transfer structure effectively reduces shear forces, bending moments, and stresses in the station structure; limits lateral displacements during the assembly process; and effectively concentrates the maximum stresses during construction at the location of the load transfer structure, thereby preventing stress concentration phenomena and enhancing the overall stability of the station structure. This study elucidates the role and effectiveness of the load transfer structure during the assembly of prefabricated components in subway stations, providing a reference for the construction of similar prefabricated metro stations.
- 23 December 2023
- Published by Springer Nature in Archives of Civil and Mechanical Engineering
- Vol. 24 (1) , 1-17
Mechanism effect of umbrella arch supports in a shallow long-span tunnel: a case study
- 23 December 2023
- Published by Springer Nature in Archives of Civil and Mechanical Engineering
- Vol. 24 (1) , 1-17
Mechanism effect of umbrella arch supports in a shallow long-span tunnel: a case study