SJSeonghoon Jung

Seonghoon Jung

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Seonghoon Jung has a total of 80 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Beagle: a near-edge X-ray absorption fine-structure spectroscopy data processing solution for beamline experiments at Pohang Accelerator Laboratory

    by Jae Yeon Park, Minwoong Lee, Seong-Hoon Jeong, Han-Koo Lee

    Near-edge X-ray absorption fine-structure (NEXAFS) spectroscopy is a powerful tool for identifying chemical bonding states at synchrotron radiation facilities. Advances in new materials require researchers in both academia and industry to measure tens to hundreds of samples during the available beam time on a synchrotron beamline, which is typically allocated to users. Automated measurement methods, along with analysis software, have been developed for beamlines. Automated measurements facilitate high-throughput experiments and accumulate vast amounts of measured spectral data. The analysis software supports various functions for analyzing the experimental data; however, these analysis methods are complicated, and learning them can be time-consuming. To process large amounts of spectral data, a new analysis software, dedicated to NEXAFS spectroscopy, that is easy to use and can provide results in a short time is desired. Herein, the development of Beagle is described, software calculating molecular orientation from NEXAFS spectroscopy data that can report results in a short time comparable with that required to measure one sample at the beamline. It was designed to progress in a single sequence from data loading to the printing of the results with a `click of a button'. The functions of the software include recognizing the dataset, correcting the background, normalizing the plot, calculating the electron yield and determining the molecular orientation. The analysis results can be saved as {\tt{.txt}} files (spectral data), {\tt{.pdf}} files (graphic images) and Origin files (spectral data and graphic images).


  • FEL performance achieved at PAL-XFEL using a three-chicane bunch compression scheme

    by Heung-Sik Kang, Haeryong Yang, Gyujin Kim, Hoon Heo, Inhyuk Nam, Chang-Ki Min, Changbum Kim, Soung Youl Baek, Hyo-Jin Choi, Geonyeong Mun, et al.

    PAL-XFEL utilizes a three-chicane bunch compression (3-BC) scheme (the very first of its kind in operation) for free-electron laser (FEL) operation. The addition of a third bunch compressor allows for more effective mitigation of coherent synchrotron radiation during bunch compression and an increased flexibility of system configuration. Start-to-end simulations of the effects of radiofrequency jitter on the electron beam performance show that using the 3-BC scheme leads to better performance compared with the two-chicane bunch compression scheme. Together with the high performance of the linac radiofrequency system, it enables reliable operation of PAL-XFEL with unprecedented stability in terms of arrival timing, pointing and intensity; an arrival timing jitter of better than 15 fs, a transverse position jitter of smaller than 10% of the photon beam size, and an FEL intensity jitter of smaller than 5% are consistently achieved.


  • Open Access

    Construction and Commissioning of PAL-XFEL Facility

    by In Soo Ko, Heung-Sik Kang, Hoon Heo, Changbum Kim, Gyujin Kim, Chang-Ki Min, Haeryong Yang, Soung Youl Baek, Hyo-Jin Choi, Geonyeong Mun, et al.

    The construction of Pohang Accelerator Laboratory X-ray Free-Electron Laser (PAL-XFEL), a 0.1-nm hard X-ray free-electron laser (FEL) facility based on a 10-GeV S-band linear accelerator (LINAC), is achieved in Pohang, Korea by the end of 2016. The construction of the 1.11 km-long building was completed by the end of 2014, and the installation of the 10-GeV LINAC and undulators started in January 2015. The installation of the 10-GeV LINAC, together with the undulators and beamlines, was completed by the end of 2015. The commissioning began in April 2016, and the first lasing of the hard X-ray FEL line was achieved on 14 June 2016. The progress of the PAL-XFEL construction and its commission are reported here.