Uche Emmanuel Uche
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Uche Emmanuel Uche has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Ameer Mohammed
Air Force Institute of Technology
1 shared publication B.G. Ibrahim
Centre for Defence Procurement Logistics and Supply Chain Management Air Force Institute of Technology Kaduna Kaduna State Nigeria
1 shared publicationG.A. Bolorunduro
Aerospace Engineering Department Air Force Institute of Technology Kaduna Kaduna State Nigeria
1 shared publicationIbrahim Momoh-Bello Omiogbemi
1 shared publicationS. T. Audu
Mechanical Engineering Department Air Force Institute of Technology Kaduna
1 shared publication
Latest Publications
- 1 January 2024
- Published by Wren Research Journals in Journal of Biology and Health Science
- Vol. 01 (01)
Enhancing Productivity of Latex Lifting Operation of Rubber Plantation Using Industrial Engineering Techniques
In the competitive commodity market, where raising the selling price of natural rubber in the face of increasing cost of production is becoming increasingly difficult due to stiff competition by its alternative synthetic rubber, rubber plantations must focus on productivity of operations. One key operational area for productivity improvement is the transportation of produce from fields to processing centres. An industrial engineering technique is deployed in this study to enhance productivity of latex lifting in a rubber plantation. The study includes analyzing the current method, proposing a new method and conducting a cost-benefit analysis.
- 1 January 2024
- Published by Wren Research Journals in Journal of Biology and Health Science
- Vol. 01 (01)
Enhancing Productivity of Latex Lifting Operation of Rubber Plantation Using Industrial Engineering Techniques
In the competitive commodity market, where raising the selling price of natural rubber in the face of increasing cost of production is becoming increasingly difficult due to stiff competition by its alternative synthetic rubber, rubber plantations must focus on productivity of operations. One key operational area for productivity improvement is the transportation of produce from fields to processing centres. An industrial engineering technique is deployed in this study to enhance productivity of latex lifting in a rubber plantation. The study includes analyzing the current method, proposing a new method and conducting a cost-benefit analysis.
- Open Access
- 30 August 2023
- Published by Springer Nature in Research Square
Evaluation of Hydrologic Data for Irrigation System Design: A Case Study
The scope and the efficient operation of an irrigation system depends on systematic collection, collation, and analysis of the hydrological/meteorological data of the project area. Relying on existing rainfall records, the peak rainfall, mean rainfall, rainfall frequency and effective monthly rainfall were established. Atayi stream discharge characteristic curve was used to determine the stream stage-discharge relationship while the instantaneous rate of discharge of the stream was determined using float. The generated data was plotted on a hydrograph to obtain 2.64m3/s. The high-level volume discharge and the low-level flow per annum were found to be 29.08m3 and 18.33m3 respectively. For the crop evapotranspiration, the Penman open water evaporation was deployed using climatic data for Igwu scheme as collected by Umudike Research Institute, Umuahia to obtain 1871 mm per annum compared to 2200mm by Piche or Pan evaporation. The site hydrologic data collected and analyzed support the adequacy of basic hydrologic factors for irrigated paddy rice cultivation in the study area.
- 30 August 2023
- Published by Springer Nature in Research Square
Open AccessEvaluation of Hydrologic Data for Irrigation System Design: A Case Study
The scope and the efficient operation of an irrigation system depends on systematic collection, collation, and analysis of the hydrological/meteorological data of the project area. Relying on existing rainfall records, the peak rainfall, mean rainfall, rainfall frequency and effective monthly rainfall were established. Atayi stream discharge characteristic curve was used to determine the stream stage-discharge relationship while the instantaneous rate of discharge of the stream was determined using float. The generated data was plotted on a hydrograph to obtain 2.64m3/s. The high-level volume discharge and the low-level flow per annum were found to be 29.08m3 and 18.33m3 respectively. For the crop evapotranspiration, the Penman open water evaporation was deployed using climatic data for Igwu scheme as collected by Umudike Research Institute, Umuahia to obtain 1871 mm per annum compared to 2200mm by Piche or Pan evaporation. The site hydrologic data collected and analyzed support the adequacy of basic hydrologic factors for irrigated paddy rice cultivation in the study area.
- Open Access
- 3 November 2022
- Published by University of Nigeria in Nigerian Journal of Technology
- Vol. 41 (4) , 767-777
Analysis and remedies for factors responsible for time between overhaul: a case study of Do-228 aircraft starter generator
The starter generator is used for cranking the engine and to produce electricity for the aircraft system after a sustainable speed. A review of relevant literature reveals the time between the overhaul of the Do-228 aircraft starter generator but did not go in-depth to unravel the factors responsible. A survey research method is adopted to elicit information on the factors. Raosoft sample technique calculator: a software that primarily calculates or generates the sample size of a research or survey was used to obtain the minimum sample size from the study population with the nominal rolls of the technicians as the sampling frame. The questionnaire was vetted and validated by a professional focus group discussion team. The result shows that the factors responsible for the time between overhaul of the starter generator are Environmental Factors (10%), Mechanical Factors (20%), Poor Maintenance Factors (17%), Time Due (25%), Usage/Life Cycle (16%) and Aging (12%). 75% overhaul is unscheduled. It is recommended that the overhauling of the aircraft starter generators be done at 900 as against 1000 flight hour intervals to mitigate unscheduled maintenance.
- 3 November 2022
- Published by University of Nigeria in Nigerian Journal of Technology
- Vol. 41 (4) , 767-777
Open AccessAnalysis and remedies for factors responsible for time between overhaul: a case study of Do-228 aircraft starter generator
The starter generator is used for cranking the engine and to produce electricity for the aircraft system after a sustainable speed. A review of relevant literature reveals the time between the overhaul of the Do-228 aircraft starter generator but did not go in-depth to unravel the factors responsible. A survey research method is adopted to elicit information on the factors. Raosoft sample technique calculator: a software that primarily calculates or generates the sample size of a research or survey was used to obtain the minimum sample size from the study population with the nominal rolls of the technicians as the sampling frame. The questionnaire was vetted and validated by a professional focus group discussion team. The result shows that the factors responsible for the time between overhaul of the starter generator are Environmental Factors (10%), Mechanical Factors (20%), Poor Maintenance Factors (17%), Time Due (25%), Usage/Life Cycle (16%) and Aging (12%). 75% overhaul is unscheduled. It is recommended that the overhauling of the aircraft starter generators be done at 900 as against 1000 flight hour intervals to mitigate unscheduled maintenance.