Guixi Miao
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Guixi Miao has a total of 14 co-authors. Here are the top co-authors by number of shared publications:
- Hui Ma
College of Electrical Engineering and New Energy, China Three Gorges University, Yichang, China
3 shared publications - Cheng Jing
College of Electrical Engineering and New Energy, China Three Gorges University, Yichang 443002, China
2 shared publications - Hong Dai
College of Electrical Engineering and New Energy, China Three Gorges University, Yichang 443002, China
2 shared publications - Jianyuan Xu
School of Electrical Engineering, Shenyang University of Technology, Shenyang 110870, China
2 shared publications - Liang Yuan
State Grid, Henan Electric Power Company Anyang Power Supply Company, Henan, China
2 shared publications - Qingsong Zhao
State Grid LiaoNing Electric Power Supply Co., Ltd., Electric Power Research Institute, Shenyang 110000, China
2 shared publications
Latest Publications
- 11 July 2025
- Published by Springer Nature in Journal of Electrical Engineering & Technology
- Vol. 20 (8) , 4941-4957
Multi-Objective Optimization of Power-Gas-Heat Integrated Energy System Based on NSGA-II-MOPSO Hybrid Intelligent Algorithm
- 11 July 2025
- Published by Springer Nature in Journal of Electrical Engineering & Technology
- Vol. 20 (8) , 4941-4957
Multi-Objective Optimization of Power-Gas-Heat Integrated Energy System Based on NSGA-II-MOPSO Hybrid Intelligent Algorithm
- Open Access
Mobile Energy Storage System Scheduling Strategy for Improving the Resilience of Distribution Networks under Ice Disasters
The distribution system is easily affected by extreme weather, leading to an increase in the probability of critical equipment failures and economic losses. Actively scheduling various resources to provide emergency power support can effectively reduce power outage losses caused by extreme weather. This paper proposes a mobile energy storage system (MESS) scheduling strategy for improving the resilience of distribution networks under ice disasters. First, the influence of wind and ice loads on power transmission lines is analyzed, and a detailed fault statistical model of transmission lines under an ice disaster is established. Then, the MESS scheduling problem considering the coupling of transportation-distribution networks is transformed into a two-stage optimization problem. The first stage determines the optimal configuration scheme for MESS, and in the second stage, the optimal path selection for MESS can be obtained. Finally, the effectiveness and feasibility of the algorithm proposed in this paper are verified through an improved IEEE-33 node testing system.
Open AccessMobile Energy Storage System Scheduling Strategy for Improving the Resilience of Distribution Networks under Ice Disasters
The distribution system is easily affected by extreme weather, leading to an increase in the probability of critical equipment failures and economic losses. Actively scheduling various resources to provide emergency power support can effectively reduce power outage losses caused by extreme weather. This paper proposes a mobile energy storage system (MESS) scheduling strategy for improving the resilience of distribution networks under ice disasters. First, the influence of wind and ice loads on power transmission lines is analyzed, and a detailed fault statistical model of transmission lines under an ice disaster is established. Then, the MESS scheduling problem considering the coupling of transportation-distribution networks is transformed into a two-stage optimization problem. The first stage determines the optimal configuration scheme for MESS, and in the second stage, the optimal path selection for MESS can be obtained. Finally, the effectiveness and feasibility of the algorithm proposed in this paper are verified through an improved IEEE-33 node testing system.
- Open Access
- 3 September 2023
- Published by MDPI AG in Electronics
- Vol. 12 (17) , 3722
A Family of Five-Level Pseudo-Totem Pole Dual Boost Converters
In this paper, based on the pseudo-totem pole (PTP) circuit, a family of five-level PTP dual boost converters (PDBC) is proposed. A dual boost converter has some unique advantages, such as having no risk of bridge arm shoot-through and no problems related to switch body diode reverse recovery; thus, it has a good potential for applications. First, the derivation process, working principle, modulation and strategy of the topology are analyzed. Further, the number of power devices, switch voltages and current stress of the proposed topology is analyzed. Finally, a representative five-level PDBC experimental prototype is designed with AC input 220 V/50 Hz, DC output 400 V/1 kW, and peak efficiency of 98.27%. The experimental results show that the five-level PDBC proposed in this paper has higher efficiency and the correctness of its topology is verified.
- 3 September 2023
- Published by MDPI AG in Electronics
- Vol. 12 (17) , 3722
Open AccessA Family of Five-Level Pseudo-Totem Pole Dual Boost Converters
In this paper, based on the pseudo-totem pole (PTP) circuit, a family of five-level PTP dual boost converters (PDBC) is proposed. A dual boost converter has some unique advantages, such as having no risk of bridge arm shoot-through and no problems related to switch body diode reverse recovery; thus, it has a good potential for applications. First, the derivation process, working principle, modulation and strategy of the topology are analyzed. Further, the number of power devices, switch voltages and current stress of the proposed topology is analyzed. Finally, a representative five-level PDBC experimental prototype is designed with AC input 220 V/50 Hz, DC output 400 V/1 kW, and peak efficiency of 98.27%. The experimental results show that the five-level PDBC proposed in this paper has higher efficiency and the correctness of its topology is verified.
- Open Access
- 26 May 2023
- Published by MDPI AG in Preprints.org
A Family of Five-Level Pseudo-Totem Pole Dual Boost Converters
In this paper, based on the pseudo-totem pole (PTP) circuit, a family of five-level PTP dual boost converters (PDBC) is proposed. Dual boost converter has some unique advantages such as no bridge arm shoot-through risk and no switch body diode reverse recovery problem, so that it has a good application prospect. Compared with conventional three-level PTP converters, PDBCs has higher power density, higher efficiency, and low voltage and current stress. The topological derivation process, working principle, modulation and strategy of the topology are analyzed firstly. Further, the number of power devices, the switches voltage and current stress of the proposed topology is analyzed. Finally, a representative five-level PDBC experimental prototype is designed with AC input 220V/50Hz, DC output 400V/1kW, and peak efficiency of 98.27%. The experimental results show that the five-level PDBC proposed in this paper has higher efficiency and verify the correctness of the topology.
- 26 May 2023
- Published by MDPI AG in Preprints.org
Open AccessA Family of Five-Level Pseudo-Totem Pole Dual Boost Converters
In this paper, based on the pseudo-totem pole (PTP) circuit, a family of five-level PTP dual boost converters (PDBC) is proposed. Dual boost converter has some unique advantages such as no bridge arm shoot-through risk and no switch body diode reverse recovery problem, so that it has a good application prospect. Compared with conventional three-level PTP converters, PDBCs has higher power density, higher efficiency, and low voltage and current stress. The topological derivation process, working principle, modulation and strategy of the topology are analyzed firstly. Further, the number of power devices, the switches voltage and current stress of the proposed topology is analyzed. Finally, a representative five-level PDBC experimental prototype is designed with AC input 220V/50Hz, DC output 400V/1kW, and peak efficiency of 98.27%. The experimental results show that the five-level PDBC proposed in this paper has higher efficiency and verify the correctness of the topology.