Jiahui Li
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Jiahui Li has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Jiang Qin
School of Energy Science and Engineering, Harbin Institute of Technology, Harbin 150001, China
2 shared publications - Kunlin Cheng
School of Energy Science and Engineering, Harbin Institute of Technology, Harbin 150001, China
2 shared publications - Wuxing Jing
School of Astronautics, Harbin Institute of Technology, Harbin, China
2 shared publications - Jianchi Yu
School of Energy Science and Engineering, Harbin Institute of Technology, Harbin 150001, China
1 shared publication
Latest Publications
- Open Access
Performance Assessment of Closed-Brayton-Cycle and Thermoelectric Generator Combined Power Generation System Coupled with Hydrocarbon-Fueled Scramjet
Closed-Brayton-cycle (CBC) is a potential scheme to provide high-power electricity for hypersonic vehicles, but finite cold source onboard limits its power level. A thermoelectric generator (TEG) combined with CBC is a feasible power enhancement approach by extending the available temperature range of cold source. In this study, a performance assessment of the CBC-TEG combined power generation system coupled with hydrocarbon-fueled scramjet is performed to exhibit its possible operation characteristics and performance limitations on hypersonic vehicles. Results indicate that, at a fixed flight Mach number, a larger fuel equivalence ratio (φ) leads to a higher total electric power and CBC power but a lower TEG power. There are three limitations on the fuel equivalence ratio, TEG temperature difference, and combustion heat dissipation adjustment for the operation of CBC-TEG. The total power of CBC-TEG can be adjusted by φ, but the adjustable range becomes smaller at higher Ma. The electric quantity at unit fuel mass increases with φ, mainly due to the higher thermoelectric conversion efficiency. Moreover, the maximum value of the electric quantity at unit fuel mass for CBC-TEG reaches 277.0 kJ/kg, which is about 33.4% higher than that of standalone CBC.
Open AccessPerformance Assessment of Closed-Brayton-Cycle and Thermoelectric Generator Combined Power Generation System Coupled with Hydrocarbon-Fueled Scramjet
Closed-Brayton-cycle (CBC) is a potential scheme to provide high-power electricity for hypersonic vehicles, but finite cold source onboard limits its power level. A thermoelectric generator (TEG) combined with CBC is a feasible power enhancement approach by extending the available temperature range of cold source. In this study, a performance assessment of the CBC-TEG combined power generation system coupled with hydrocarbon-fueled scramjet is performed to exhibit its possible operation characteristics and performance limitations on hypersonic vehicles. Results indicate that, at a fixed flight Mach number, a larger fuel equivalence ratio (φ) leads to a higher total electric power and CBC power but a lower TEG power. There are three limitations on the fuel equivalence ratio, TEG temperature difference, and combustion heat dissipation adjustment for the operation of CBC-TEG. The total power of CBC-TEG can be adjusted by φ, but the adjustable range becomes smaller at higher Ma. The electric quantity at unit fuel mass increases with φ, mainly due to the higher thermoelectric conversion efficiency. Moreover, the maximum value of the electric quantity at unit fuel mass for CBC-TEG reaches 277.0 kJ/kg, which is about 33.4% higher than that of standalone CBC.
- Open Access
Dynamic Characteristics Analysis for a Novel Double-Rotor He-Xe Closed-Brayton-Cycle Space Nuclear Power Generation System
The growing demand for electricity in long-duration space missions has become a pressing concern. The space nuclear closed-Brayton-cycle (CBC) power generation system offers advantages in power output, operational lifespan, and range. However, a significant speed disparity exists between its compressor and alternator. To address this challenge, this paper proposes a double-rotor CBC configuration. A corresponding dynamic model that couples the nuclear reactor and radiator is formulated, and dynamic analysis is conducted to facilitate system control. The study delves into the dynamic start-up process of the double-rotor CBC system and examines how various component parameters impact its power generation performance. The findings indicate that through the introduction of suitable reactivity to regulate reactor power and the incorporation of a PID controller to manage flow distribution between two turbines, the system can achieve start-up within 5200 s. Moreover, the innovative double-rotor structure suggested in this paper enables the separation of compressor and alternator speeds. Consequently, the compressor and alternator can operate within their optimal speed ranges independently, which is a feature that holds potential benefits for the system’s practical implementation. In addition, the steady-state operation of the system showcases the recuperator’s heat transfer power at around 1127.60 kW, a parameter of significant importance. Following steady-state operation, the double-rotor CBC system demonstrated an electrical power output of 175.99 kW and a thermal efficiency of 32.38%.
Open AccessDynamic Characteristics Analysis for a Novel Double-Rotor He-Xe Closed-Brayton-Cycle Space Nuclear Power Generation System
The growing demand for electricity in long-duration space missions has become a pressing concern. The space nuclear closed-Brayton-cycle (CBC) power generation system offers advantages in power output, operational lifespan, and range. However, a significant speed disparity exists between its compressor and alternator. To address this challenge, this paper proposes a double-rotor CBC configuration. A corresponding dynamic model that couples the nuclear reactor and radiator is formulated, and dynamic analysis is conducted to facilitate system control. The study delves into the dynamic start-up process of the double-rotor CBC system and examines how various component parameters impact its power generation performance. The findings indicate that through the introduction of suitable reactivity to regulate reactor power and the incorporation of a PID controller to manage flow distribution between two turbines, the system can achieve start-up within 5200 s. Moreover, the innovative double-rotor structure suggested in this paper enables the separation of compressor and alternator speeds. Consequently, the compressor and alternator can operate within their optimal speed ranges independently, which is a feature that holds potential benefits for the system’s practical implementation. In addition, the steady-state operation of the system showcases the recuperator’s heat transfer power at around 1127.60 kW, a parameter of significant importance. Following steady-state operation, the double-rotor CBC system demonstrated an electrical power output of 175.99 kW and a thermal efficiency of 32.38%.