Ashish Ranjan
Research Subjects
Ashish Ranjan has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
- Jayanti Choudhary
Department of Electrical Engineering, National Institute of Technology Patna, Bihar, India
4 shared publications - Santosh Kumar Gupta
Department of Electrical Engineering, Government Engineering College
2 shared publications - Vikash Kumar
RRSDCE
2 shared publications - Atiqur Rahman
Department of Electrical Engineering, National Institute of Technology Patna, Bihar, India
1 shared publication - Dhananjay Kumar
Government Engineering College Siwan
1 shared publication - Lokesh Kumar Yadav
Department of Electrical Engineering, Rajkiya Engineering College
1 shared publication
Latest Publications
- 2 July 2026
- Published by Springer Nature
- p. 358-375
Comparison of Voltage Stability Index with Optimal Placement of STATCOM Considering Voltage Stability Margin
- 2 July 2026
- Published by Springer Nature
- p. 358-375
Comparison of Voltage Stability Index with Optimal Placement of STATCOM Considering Voltage Stability Margin
- 17 June 2024
- Published by Springer Nature in Multimedia Tools and Applications
- Vol. 84 (15) , 14553-14582
Meta-heuristic-based power quality improvement in UPQC-based grid-connected hybrid renewable energy system
- 17 June 2024
- Published by Springer Nature in Multimedia Tools and Applications
- Vol. 84 (15) , 14553-14582
Meta-heuristic-based power quality improvement in UPQC-based grid-connected hybrid renewable energy system
- Open Access
- 1 June 2024
- Published by Institute of Advanced Engineering and Science in Intellectual Journal of Energy Harvesting and Storage
- Vol. 2 (1) , 14-29
Meta-heuristic based power quality improvement in UPQC based grid-connected hybrid renewable energy system
In recent days, the integration of the grid-connected load system with hybrid renewable energy system (HY-RES) to improve reliability and reduce losses are cheered. In order to satisfy the requirement of the load demand, the HY-RES is incorporated with the grid-connected load which leads to the power quality (PQ) problems in the system. Hence, the UPQC based HPSO-GWO are proposed in this paper. With the utilization of the UPQC device, the PQ issues are minimized by satisfy the load need in the HY-RES system to solve the PQ issues is the major goal of this work. To mitigate the PQ issues, the HPSO-GWO optimization algorithm with an inverter for SAPF and SH-APF is introduced to enhance the UPQC’s performance. HY-RES is originally built in this study with a PV system, WT, and BESS, all of which are connected to the load system. The load is connected to the system to produce PQ difficulties in order to examine the suggested technique's presentation. With the help of the HY-RES system, PQ problems are minimized and load demand is reimbursed. The proposed method has been implemented in the MATLAB/Simulink platform, and its results have been evaluated. In this paper, for validating the performance of the proposed technique, three various cases such as sag, swell, and fluctuation is analyzed. In addition, the total harmonic distortion (THD) is analyzed. Furthermore, the suggested strategy is compared to existing methods such as GWO and PSO algorithms to prove the proposed technique is superior to existing techniques.
- 1 June 2024
- Published by Institute of Advanced Engineering and Science in Intellectual Journal of Energy Harvesting and Storage
- Vol. 2 (1) , 14-29
Open AccessMeta-heuristic based power quality improvement in UPQC based grid-connected hybrid renewable energy system
In recent days, the integration of the grid-connected load system with hybrid renewable energy system (HY-RES) to improve reliability and reduce losses are cheered. In order to satisfy the requirement of the load demand, the HY-RES is incorporated with the grid-connected load which leads to the power quality (PQ) problems in the system. Hence, the UPQC based HPSO-GWO are proposed in this paper. With the utilization of the UPQC device, the PQ issues are minimized by satisfy the load need in the HY-RES system to solve the PQ issues is the major goal of this work. To mitigate the PQ issues, the HPSO-GWO optimization algorithm with an inverter for SAPF and SH-APF is introduced to enhance the UPQC’s performance. HY-RES is originally built in this study with a PV system, WT, and BESS, all of which are connected to the load system. The load is connected to the system to produce PQ difficulties in order to examine the suggested technique's presentation. With the help of the HY-RES system, PQ problems are minimized and load demand is reimbursed. The proposed method has been implemented in the MATLAB/Simulink platform, and its results have been evaluated. In this paper, for validating the performance of the proposed technique, three various cases such as sag, swell, and fluctuation is analyzed. In addition, the total harmonic distortion (THD) is analyzed. Furthermore, the suggested strategy is compared to existing methods such as GWO and PSO algorithms to prove the proposed technique is superior to existing techniques.
- 11 April 2024
- Published by Springer Nature
- p. 23-37
Power Quality Enhancement in Grid-Connected Energy System with UPQC Using Hybrid PSO-GWO Optimization Technique
- 11 April 2024
- Published by Springer Nature
- p. 23-37
Power Quality Enhancement in Grid-Connected Energy System with UPQC Using Hybrid PSO-GWO Optimization Technique
- 1 March 2024
- Published by IOP Publishing in Engineering Research Express
- Vol. 6 (1) , 015312
Assessment of photovoltaic generation penetration effect on the maximum loadability of the system
This paper proposed a method to investigate the effect of increasing PV penetration on the voltage stability of an IEEE 14-bus test system considering maximum PV penetration and system loadability limit. The critical bus of the test system has been decided based on nose curve analysis. The solar PV system is deployed with the most critical bus of the system. The effect of increasing PV penetration on the improvement in the loading capacity of various power system components like transmission lines, transmission line transformers, and generators is investigated over the adopted test system. Based on solar PV penetration up to 100 MW, the maximum loadability limit of the IEEE 14-bus test system increases, as shown by the results. Bus 14 is found to be the most severe bus of the test system using the continuation power flow (CPF) method. However, in some cases, overloading situations develop after a certain limit of PV penetration in the power system. In this condition, the overloading of the power system equipment is improved by the use of a Static Synchronous Compensator (STATCOM) at bus number 14, a double circuit line in the critical line (9–14), and Static Synchronous Series Compensator (SSSC) in the most severe line (9–14) in the system. The maximum loadability of the system gets maximum enhanced from 4.0349 p.u. to 4.5602 p.u. under simultaneous use of solar PV generation, SSSC, and STATCOM at the most critical bus and in most severe line of the system. As evidence, the enhancement in maximum loadability of the system found using the proposed method has been also compared with the existing research. The maximum system loadability has been also enhanced under normal and (N-1) contingency conditions by the use of PV penetration in the system. PSAT/MATLAB software is used for simulation and maximum loadability has been investigated by continuation power flow (CPF) method.
- 1 March 2024
- Published by IOP Publishing in Engineering Research Express
- Vol. 6 (1) , 015312
Assessment of photovoltaic generation penetration effect on the maximum loadability of the system
This paper proposed a method to investigate the effect of increasing PV penetration on the voltage stability of an IEEE 14-bus test system considering maximum PV penetration and system loadability limit. The critical bus of the test system has been decided based on nose curve analysis. The solar PV system is deployed with the most critical bus of the system. The effect of increasing PV penetration on the improvement in the loading capacity of various power system components like transmission lines, transmission line transformers, and generators is investigated over the adopted test system. Based on solar PV penetration up to 100 MW, the maximum loadability limit of the IEEE 14-bus test system increases, as shown by the results. Bus 14 is found to be the most severe bus of the test system using the continuation power flow (CPF) method. However, in some cases, overloading situations develop after a certain limit of PV penetration in the power system. In this condition, the overloading of the power system equipment is improved by the use of a Static Synchronous Compensator (STATCOM) at bus number 14, a double circuit line in the critical line (9–14), and Static Synchronous Series Compensator (SSSC) in the most severe line (9–14) in the system. The maximum loadability of the system gets maximum enhanced from 4.0349 p.u. to 4.5602 p.u. under simultaneous use of solar PV generation, SSSC, and STATCOM at the most critical bus and in most severe line of the system. As evidence, the enhancement in maximum loadability of the system found using the proposed method has been also compared with the existing research. The maximum system loadability has been also enhanced under normal and (N-1) contingency conditions by the use of PV penetration in the system. PSAT/MATLAB software is used for simulation and maximum loadability has been investigated by continuation power flow (CPF) method.
- 13 October 2023
- Published by IOP Publishing in Engineering Research Express
- Vol. 5 (4) , 045018
Enhancement of power quality in grid-connected HRES using UPQC with self-improved Battle Royal Optimizer in IEEE 14 bus system
The integration of hybrid renewable energy systems (HRES) in grid-connected load systems has become popular due to its ability to enhance reliability and reduce losses. However, this integration can lead to power quality (PQ) issues caused by non-linear, critical, and unbalanced load conditions. To address these PQ issues and compensate for load demand in HRES systems, a new method called Self-Improved Battle Royal Optimizer (SI-BRO) has been proposed. This method involves the use of a Unified Power Quality Conditioner (UPQC) device, which is designed to improve the system’s PQ performance. To enhance the performance of the UPQC device, an optimized fuzzy logic controller is introduced in the series and shunt active power filter, and its parameters are optimized using the SI-BRO model. The proposed method is implemented in MATLAB/Simulink, and its effectiveness is evaluated through different scenarios in IEEE 14 Bus system. These scenarios include the introduction of a nonlinear load to create PQ issues, and the comparison of Sag, Swell, and fluctuation of proposed technique i.e. SI-BRO optimizer with BRO,HHO ,EHO optimizer and calculation of THD in proposed technique.In all cases of Sag,Swell, Fluctuation , the proposed techniques gives better results in comparison to BRO,HHO & EHO.
- 13 October 2023
- Published by IOP Publishing in Engineering Research Express
- Vol. 5 (4) , 045018
Enhancement of power quality in grid-connected HRES using UPQC with self-improved Battle Royal Optimizer in IEEE 14 bus system
The integration of hybrid renewable energy systems (HRES) in grid-connected load systems has become popular due to its ability to enhance reliability and reduce losses. However, this integration can lead to power quality (PQ) issues caused by non-linear, critical, and unbalanced load conditions. To address these PQ issues and compensate for load demand in HRES systems, a new method called Self-Improved Battle Royal Optimizer (SI-BRO) has been proposed. This method involves the use of a Unified Power Quality Conditioner (UPQC) device, which is designed to improve the system’s PQ performance. To enhance the performance of the UPQC device, an optimized fuzzy logic controller is introduced in the series and shunt active power filter, and its parameters are optimized using the SI-BRO model. The proposed method is implemented in MATLAB/Simulink, and its effectiveness is evaluated through different scenarios in IEEE 14 Bus system. These scenarios include the introduction of a nonlinear load to create PQ issues, and the comparison of Sag, Swell, and fluctuation of proposed technique i.e. SI-BRO optimizer with BRO,HHO ,EHO optimizer and calculation of THD in proposed technique.In all cases of Sag,Swell, Fluctuation , the proposed techniques gives better results in comparison to BRO,HHO & EHO.