Nitai Kumar Sarker
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Nitai Kumar Sarker has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Alamgir Hossain
School of Engineering, University of Southern Queensland, Toowoomba, QLD, Australia
2 shared publications - Ashraf Hossain Sanvi
Department of Electrical and Electronic Engineering, Pabna University of Science and Technology 1 , Pabna 6600
2 shared publications - Md. Feroz Ali
Department of Electrical and Electronic Engineering, Pabna University of Science and Technology, Pabna, Bangladesh
2 shared publications - Shafiul Alam
Department of Electrical Engineering, College of Engineering, King Faisal University, Al Ahsa, Saudi Arabia
2 shared publications - Syed Ibn Syam Sifat
Department of Electrical and Electronic Engineering, Pabna University of Science and Technology, Pabna 6600, Bangladesh
2 shared publications
Latest Publications
- Open Access
Techno-Economic Feasibility Study of a 1.5 MW Grid-Connected Solar Power Plant in Bangladesh
This study addresses the pressing energy constraints in nations like Bangladesh by proposing the implementation of photovoltaic (PV) microgrids. Given concerns about environmental degradation, limited fossil fuel reserves, and volatile product costs, renewable energy sources are gaining momentum globally. Our research focuses on a grid-connected solar PV system model at Char Jazira, Lalpur, Natore, Rajshahi, Bangladesh. Through PVsyst 7.1 simulation software, we assess the performance ratio (PR) and system losses, revealing an annual solar energy potential of 3375 MWh at standard test condition (STC) efficiency. After considering losses, the system generates 2815.2 MWh annually, with 2774 MWh exported to the grid. We analyze an average PR of 78.63% and calculate a levelized cost of energy (LCOE) of 2.82 BDT/kWh [1 USD = 110 BDT]. The financial assessment indicates a cost-effective LCOE for the grid-connected PV system, with an annual gross income of 27,744 kBDT from selling energy to the grid and operating costs of 64,060.60 BDT/year. Remarkably, this initiative can prevent 37,647.82 tCO2 emissions over the project’s 25-year lifespan.
Open AccessTechno-Economic Feasibility Study of a 1.5 MW Grid-Connected Solar Power Plant in Bangladesh
This study addresses the pressing energy constraints in nations like Bangladesh by proposing the implementation of photovoltaic (PV) microgrids. Given concerns about environmental degradation, limited fossil fuel reserves, and volatile product costs, renewable energy sources are gaining momentum globally. Our research focuses on a grid-connected solar PV system model at Char Jazira, Lalpur, Natore, Rajshahi, Bangladesh. Through PVsyst 7.1 simulation software, we assess the performance ratio (PR) and system losses, revealing an annual solar energy potential of 3375 MWh at standard test condition (STC) efficiency. After considering losses, the system generates 2815.2 MWh annually, with 2774 MWh exported to the grid. We analyze an average PR of 78.63% and calculate a levelized cost of energy (LCOE) of 2.82 BDT/kWh [1 USD = 110 BDT]. The financial assessment indicates a cost-effective LCOE for the grid-connected PV system, with an annual gross income of 27,744 kBDT from selling energy to the grid and operating costs of 64,060.60 BDT/year. Remarkably, this initiative can prevent 37,647.82 tCO2 emissions over the project’s 25-year lifespan.
- Open Access
- 18 October 2023
- Published by MDPI AG in Preprints.org
Techno-economic Feasibility Study of a 1.5 MW Grid-connected Solar Power Plant in Bangladesh
This study addresses the pressing energy constraints in nations like Bangladesh by proposing the implementation of photovoltaic (PV) microgrids. Given concerns about environmental degrada-tion, limited fossil fuel reserves, and volatile product costs, renewable energy sources are gaining momentum globally. Our research focuses on a grid-connected solar PV system model at Char Jazira, Lalpur, Natore, Rajshahi, Bangladesh. Through PVsyst simulation software, we assess the performance ratio (PR) and system losses, revealing an annual solar energy potential of 3375 MWh at Standard Test Condition (STC) efficiency. After considering losses, the system generates 2815 MWh annually, with 2774 MWh exported to the grid. We analyze an average PR of 78.63% and calculate a levelized cost of energy (LCOE) of 2.82 BDT/kWh [1 USD = 110 BDT]. The financial assessment indicates a cost-effective LCOE for the grid-connected PV system, with an annual gross income of 27744 BDT from selling energy to the grid and operating costs of 64060.60 BDT/year. Remarkably, this initiative can prevent 33074.061 tCO2 emissions over the project’s 25-year lifespan.
- 18 October 2023
- Published by MDPI AG in Preprints.org
Open AccessTechno-economic Feasibility Study of a 1.5 MW Grid-connected Solar Power Plant in Bangladesh
This study addresses the pressing energy constraints in nations like Bangladesh by proposing the implementation of photovoltaic (PV) microgrids. Given concerns about environmental degrada-tion, limited fossil fuel reserves, and volatile product costs, renewable energy sources are gaining momentum globally. Our research focuses on a grid-connected solar PV system model at Char Jazira, Lalpur, Natore, Rajshahi, Bangladesh. Through PVsyst simulation software, we assess the performance ratio (PR) and system losses, revealing an annual solar energy potential of 3375 MWh at Standard Test Condition (STC) efficiency. After considering losses, the system generates 2815 MWh annually, with 2774 MWh exported to the grid. We analyze an average PR of 78.63% and calculate a levelized cost of energy (LCOE) of 2.82 BDT/kWh [1 USD = 110 BDT]. The financial assessment indicates a cost-effective LCOE for the grid-connected PV system, with an annual gross income of 27744 BDT from selling energy to the grid and operating costs of 64060.60 BDT/year. Remarkably, this initiative can prevent 33074.061 tCO2 emissions over the project’s 25-year lifespan.