Ashraf Hossain Sanvi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Ashraf Hossain Sanvi has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
- Md. Feroz Ali
Department of Electrical and Electronic Engineering, Pabna University of Science and Technology, Pabna, Bangladesh
3 shared publications - Alamgir Hossain
School of Engineering, University of Southern Queensland, Toowoomba, QLD, Australia
2 shared publications - Nitai Kumar Sarker
Department of Electrical and Electronic Engineering, Pabna University of Science and Technology, Pabna 6600, Bangladesh
2 shared publications - Shafiul Alam
Department of Electrical Engineering, College of Engineering, King Faisal University, Al Ahsa, Saudi Arabia
2 shared publications - Syed Ibn Syam Sifat
Department of Electrical and Electronic Engineering, Pabna University of Science and Technology, Pabna 6600, Bangladesh
2 shared publications - Abu Hena Mohammad Iftekharul Ferdous
Department of Electrical and Electronic Engineering Pabna University of Science and Technology Pabna Bangladesh
1 shared publication
Latest Publications
- 1 July 2025
- Published by AIP Publishing in Journal of Renewable and Sustainable Energy
- Vol. 17 (4)
Evaluating techno-economic viability and performance of a renewable energy hybrid microgrid for electrifying remote communities in Bangladesh
This study examines the techno-economic viability of a hybrid renewable energy microgrid for rural electrification in Bangladesh using hybrid optimization of multiple energy resources Pro software. Nine system configurations, including solar photovoltaic (PV) systems, wind turbines (WTs), biogas generators (BioGen), battery energy storage system (BESS), and grid connections, were compared to determine the most suitable energy solution. Among the configurations examined, Case I (PV–WT–BioGen–BESS–Grid–Converter) was identified as the optimum configuration, with the lowest cost of energy of $0.0256/kW h, a net present cost of $672 086.5, and operating cost of $29 310.9. The hybrid system greatly minimizes environmental impacts, reducing carbon dioxide emissions to 134 590 kg per annum, compared to the baseline case of 560 491 kg per annum. The system provides a high renewable fraction of 89.04%, thereby attaining energy sustainability and lowering dependence on traditional fossil fuels. Although the initial capital investment amounts to $671 691.6, long-term economic gains compensate for the upfront cost owing to lower operating costs and enhanced reliability. Sensitivity analysis revealed that solar irradiance, wind speed, and grid failure frequency significantly impact system costs and performance, confirming the importance of resource availability and grid stability in hybrid microgrid planning. The system improves energy efficiency by aligning generation with consumption, reducing grid dependence. Results highlight the potential of hybrid renewable microgrids in providing low-carbon, reliable electricity to underserved communities, offering key insights for policymakers and engineers in designing cost-effective, adaptable solutions.
- 1 July 2025
- Published by AIP Publishing in Journal of Renewable and Sustainable Energy
- Vol. 17 (4)
Evaluating techno-economic viability and performance of a renewable energy hybrid microgrid for electrifying remote communities in Bangladesh
This study examines the techno-economic viability of a hybrid renewable energy microgrid for rural electrification in Bangladesh using hybrid optimization of multiple energy resources Pro software. Nine system configurations, including solar photovoltaic (PV) systems, wind turbines (WTs), biogas generators (BioGen), battery energy storage system (BESS), and grid connections, were compared to determine the most suitable energy solution. Among the configurations examined, Case I (PV–WT–BioGen–BESS–Grid–Converter) was identified as the optimum configuration, with the lowest cost of energy of $0.0256/kW h, a net present cost of $672 086.5, and operating cost of $29 310.9. The hybrid system greatly minimizes environmental impacts, reducing carbon dioxide emissions to 134 590 kg per annum, compared to the baseline case of 560 491 kg per annum. The system provides a high renewable fraction of 89.04%, thereby attaining energy sustainability and lowering dependence on traditional fossil fuels. Although the initial capital investment amounts to $671 691.6, long-term economic gains compensate for the upfront cost owing to lower operating costs and enhanced reliability. Sensitivity analysis revealed that solar irradiance, wind speed, and grid failure frequency significantly impact system costs and performance, confirming the importance of resource availability and grid stability in hybrid microgrid planning. The system improves energy efficiency by aligning generation with consumption, reducing grid dependence. Results highlight the potential of hybrid renewable microgrids in providing low-carbon, reliable electricity to underserved communities, offering key insights for policymakers and engineers in designing cost-effective, adaptable solutions.
- Open Access
- 10 March 2025
- Published by Elsevier in Energy Conversion and Management: X
- Vol. 26
Sustainable electrification of remote communities: Techno-economic and demand response analysis for renewable microgrids
- 10 March 2025
- Published by Elsevier in Energy Conversion and Management: X
- Vol. 26
Open AccessSustainable electrification of remote communities: Techno-economic and demand response analysis for renewable microgrids
- Open Access
Techno-Economic Feasibility Study of a 1.5 MW Grid-Connected Solar Power Plant in Bangladesh
This study addresses the pressing energy constraints in nations like Bangladesh by proposing the implementation of photovoltaic (PV) microgrids. Given concerns about environmental degradation, limited fossil fuel reserves, and volatile product costs, renewable energy sources are gaining momentum globally. Our research focuses on a grid-connected solar PV system model at Char Jazira, Lalpur, Natore, Rajshahi, Bangladesh. Through PVsyst 7.1 simulation software, we assess the performance ratio (PR) and system losses, revealing an annual solar energy potential of 3375 MWh at standard test condition (STC) efficiency. After considering losses, the system generates 2815.2 MWh annually, with 2774 MWh exported to the grid. We analyze an average PR of 78.63% and calculate a levelized cost of energy (LCOE) of 2.82 BDT/kWh [1 USD = 110 BDT]. The financial assessment indicates a cost-effective LCOE for the grid-connected PV system, with an annual gross income of 27,744 kBDT from selling energy to the grid and operating costs of 64,060.60 BDT/year. Remarkably, this initiative can prevent 37,647.82 tCO2 emissions over the project’s 25-year lifespan.
Open AccessTechno-Economic Feasibility Study of a 1.5 MW Grid-Connected Solar Power Plant in Bangladesh
This study addresses the pressing energy constraints in nations like Bangladesh by proposing the implementation of photovoltaic (PV) microgrids. Given concerns about environmental degradation, limited fossil fuel reserves, and volatile product costs, renewable energy sources are gaining momentum globally. Our research focuses on a grid-connected solar PV system model at Char Jazira, Lalpur, Natore, Rajshahi, Bangladesh. Through PVsyst 7.1 simulation software, we assess the performance ratio (PR) and system losses, revealing an annual solar energy potential of 3375 MWh at standard test condition (STC) efficiency. After considering losses, the system generates 2815.2 MWh annually, with 2774 MWh exported to the grid. We analyze an average PR of 78.63% and calculate a levelized cost of energy (LCOE) of 2.82 BDT/kWh [1 USD = 110 BDT]. The financial assessment indicates a cost-effective LCOE for the grid-connected PV system, with an annual gross income of 27,744 kBDT from selling energy to the grid and operating costs of 64,060.60 BDT/year. Remarkably, this initiative can prevent 37,647.82 tCO2 emissions over the project’s 25-year lifespan.
- Open Access
- 18 October 2023
- Published by MDPI AG in Preprints.org
Techno-economic Feasibility Study of a 1.5 MW Grid-connected Solar Power Plant in Bangladesh
This study addresses the pressing energy constraints in nations like Bangladesh by proposing the implementation of photovoltaic (PV) microgrids. Given concerns about environmental degrada-tion, limited fossil fuel reserves, and volatile product costs, renewable energy sources are gaining momentum globally. Our research focuses on a grid-connected solar PV system model at Char Jazira, Lalpur, Natore, Rajshahi, Bangladesh. Through PVsyst simulation software, we assess the performance ratio (PR) and system losses, revealing an annual solar energy potential of 3375 MWh at Standard Test Condition (STC) efficiency. After considering losses, the system generates 2815 MWh annually, with 2774 MWh exported to the grid. We analyze an average PR of 78.63% and calculate a levelized cost of energy (LCOE) of 2.82 BDT/kWh [1 USD = 110 BDT]. The financial assessment indicates a cost-effective LCOE for the grid-connected PV system, with an annual gross income of 27744 BDT from selling energy to the grid and operating costs of 64060.60 BDT/year. Remarkably, this initiative can prevent 33074.061 tCO2 emissions over the project’s 25-year lifespan.
- 18 October 2023
- Published by MDPI AG in Preprints.org
Open AccessTechno-economic Feasibility Study of a 1.5 MW Grid-connected Solar Power Plant in Bangladesh
This study addresses the pressing energy constraints in nations like Bangladesh by proposing the implementation of photovoltaic (PV) microgrids. Given concerns about environmental degrada-tion, limited fossil fuel reserves, and volatile product costs, renewable energy sources are gaining momentum globally. Our research focuses on a grid-connected solar PV system model at Char Jazira, Lalpur, Natore, Rajshahi, Bangladesh. Through PVsyst simulation software, we assess the performance ratio (PR) and system losses, revealing an annual solar energy potential of 3375 MWh at Standard Test Condition (STC) efficiency. After considering losses, the system generates 2815 MWh annually, with 2774 MWh exported to the grid. We analyze an average PR of 78.63% and calculate a levelized cost of energy (LCOE) of 2.82 BDT/kWh [1 USD = 110 BDT]. The financial assessment indicates a cost-effective LCOE for the grid-connected PV system, with an annual gross income of 27744 BDT from selling energy to the grid and operating costs of 64060.60 BDT/year. Remarkably, this initiative can prevent 33074.061 tCO2 emissions over the project’s 25-year lifespan.