JFJiayuan Fan

Jiayuan Fan

*This is an algorithmically generated author record based on publicly available information.

Jiayuan Fan has a total of 14 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Fault Detection and Classification of Power Lines Based on Bayes–LSTM–Attention

    by Chen Yang, Hao Li, Wenhui Zeng, Jiayuan Fan, Zhichao Ren

    As a critical component of the power system, transmission lines play a significant role in ensuring the safe and stable operation of the power grid. To address the challenge of accurately characterizing complex and diverse fault types, this paper proposes a fault detection and classification method for power lines that integrates Bayesian Reasoning (BR), Long Short-Term Memory (LSTM) networks, and the Attention mechanism. This approach effectively improves the accuracy of fault classification. Bayesian Reasoning is used to adjust the hyperparameters of the LSTM, while the LSTM network processes sequential data efficiently through its gating mechanism. The self-Attention mechanism adaptively assigns weights by focusing on the relationships between information at different positions in the sequence, capturing global dependencies. Test results demonstrate that the proposed Bayes–LSTM–Attention model achieves a fault classification accuracy of 94.5% for transmission lines, a significant improvement compared to the average accuracy of 80% achieved by traditional SVM multi-class classifiers. This indicates that the model has high precision in classifying transmission line faults. Additionally, the evaluation of classification results using the polygon area metric shows that the model exhibits balanced and robust performance in fault classification.


  • Open Access

    Whole Life Cycle Cost Analysis of Transmission Lines Using the Economic Life Interval Method

    by Wenhui Zeng, Jiayuan Fan, Wentao Zhang, Yu Li, Bin Zou, Ruirui Huang, Xiao Xu, Junyong Liu

    With the large-scale construction and commissioning of transmission lines over the past two decades, the grid is facing a large-scale centralized decommissioning of transmission lines. The transmission line’s economic life is crucial to rationalizing its construction and reducing the grid’s development costs. Based on the minimum economic life calculation principle, the static and dynamic transmission line economic life calculation model is established, considering the whole life cycle for transmission line cost. The improved gray GM (1,1) model is applied to forecast cost data during the economic life assessment of transmission lines with fewer samples. Considering the cost uncertainty in life-cycle costing, the interval cost model based on the coefficient of variation wave amplitude is proposed to determine the economic life intervals under different guarantees by using the normal distribution probability density function, which reduces the influence of cost fluctuations on the economic life calculation error. The economic life analysis of a 500 kV transmission line is used as a case study to verify the model’s accuracy and effectiveness. The method shows the economic life intervals under different guarantee degrees based on the most probable economic life determination, which provides theoretical support for calculating the economic life elasticity of transmission lines.


  • Open Access

    Economic Evaluation Method of Modern Power Transmission System Based on Improved Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) and Best-Worst Method-Anti-Entropy Weight

    by Wenhui Zeng, Jiayuan Fan, Zhichao Ren, Xiaoyu Liu, Shuang Lv, Yuqian Cao, Xiao Xu, Junyong Liu

    As the demand for power supply increases, the investment in the power transmission system constantly increases. An accurate economic evaluation of the power transmission system is essential for future investment decisions and management. Applying a single method in economic evaluation leads to excessive subjective consciousness and unreasonable weight allocation. The Euclidean distance in the traditional TOPSIS method only partially works on the condition that the criteria are linearly correlated. To solve these problems, an economic evaluation method based on improved TOPSIS and BWM-anti-entropy weight is proposed. For the assignment of weights, the method retains the advantages of subjective and objective weighting methods based on the Nash equilibrium, breaks through the limitation of utilizing a single method, which contributes to one-sided results, and enhances the scientific rigor and rationality of the comprehensive weighting process. Furthermore, based on comprehensive weights, the method improves the TOPSIS by introducing the Mahalanobis distance and Pearson correlation coefficients, which can eliminate the influence of linear correlation. Finally, ten 500 kV transmission and transformation projects are analyzed and ranked to verify the method’s feasibility. Empirical analysis shows that the method can effectively evaluate the economic benefits of the power transmission system.