DWDong Wang

Dong Wang

*This is an algorithmically generated author record based on publicly available information.

Dong Wang has a total of 7 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Low-flow measurement of oil–water two-phase flow based on the dynamic swirling differential pressure method

    by Hui-Xiong Wu, Rui-Quan Liao, Hui-Na Qin, Xing-Kai Zhang, Dong Wang

    With the ongoing development of oilfield production, real-time monitoring of wellbore flow rates has become a crucial indicator for evaluating oilfield efficiency. However, under low-flow conditions, the sensitivity of differential pressure is insufficient, and existing differential pressure measurement methods are insufficient for accurate measurement under low-flow conditions. To address this, this study introduces a novel oil–water two-phase flow measurement device based on the dynamic spiral flow differential pressure method. By applying external forces to the swirling pipe section, the irregular upstream flow is forced into a distinct “oil-core water-ring” flow, generating both axial and radial differential pressures. The mechanisms behind these pressures are analyzed, and a theoretical dynamic swirling flow model is developed. Thorough laboratory experiments examine the relationships between the dual differential pressures and flow rate, water cut at various rotational speeds, with experimental data used to validate the model. The results indicate that the dynamic swirling method enhances the sensitivity of radial differential pressure measurements, with both flow rate and water cut positively correlated with the dual differential pressures. When rotational speed exceeds 3000 rpm and oil phase flow rate exceeds 0.7 m3/h, emulsification between the oil and water phases occurs, impacting measurement accuracy. Experimental validation of the established dynamic swirling flow oil–water two-phase measurement model reveals that the relative errors for flow rate and water cut are 4.69% and 7.53%, respectively. The method effectively extends the measurement range of oil–water two-phase flow using the differential pressure method, contributing to the advancement of intelligent oilfields.


  • Open Access

    Measurement of high water-cut heavy oil flow based on differential pressure of swirling flow

    by Zhi-Hui Wang, Xing-Kai Zhang, Rui-Quan Liao, Zhi-Xiong Ma, Dong Wang, Wei-Xia Yang

    Real-time measurement of heavy oil production is critical to ensure stable production. Due to the complex kinematic characteristics of heavy oil, existing methods cannot accurately measure its flow rate and water cut. In this paper, a novel method is proposed to measure the high water-cut heavy oil flow by using the differential pressure of the two-phase swirling flow in the pipe. For the swirling flow in the pipe, the radial differential pressure and the axial differential pressure exist simultaneously, which are very sensitive to the flow rate and water cut. The formation mechanism of the two kinds of differential pressure is analyzed theoretically, and their relationship with flow rate and water cut is studied by experiment and numerical simulation. The measurement model of heavy oil–water two-phase flow on the above relations is validated by field experiments. The radial differential pressure is only related to the two-phase flow rate, varying exponentially with the flow rate when the oil viscosity is greater than 10 000 mPa s. This characteristic is very useful for the heavy oil–water two-phase flow measurement. The axial differential pressure decreases with the increase in water cut in cases of water cut 85%. With the increase in water cut, the ratio of axial differential pressure to radial differential pressure first decreases and then increases. The relative errors of the established measurement model for flow rate and water cut are 0.19%–17.92% and 0.21%–15.5%, respectively, and more than 70% of the measurements with a relative error of less than 10%. The study of the heavy oil–water two-phase flow measurement method can optimize the measurement cost and accelerate the process of intelligent oilfield construction.